Rajkot Division :- Construction of EI Building in connection with Design, Supply, Installation, Programming, Testing and Commissioning of Electronic interlocking systems at Vavaniya, Dahinsara, Barwala Road & Bhaktinagar stations.
DRM-RJT-2026-27-E-09
DRM-RJT-2026-27-E-09
Open
12 Months
Rajkot, Gujarat
₹0
₹11.2 L
2 Jun 2026
2 Jun 2026
11 Jun 2026
Item Breakup - A-DSR ITEMS
Item Breakup - C-NS ITEMS (Electrical)
Supply & Erection Total 178972.00 Supply, installation, testing & commissioning of additional length of wiring where length of wiring of light, fan and call bell point exceeds 06 meters concealed/surface wiring by 3 nos. 1.5 sq. mm. Item- 2 FRLS PVC insulated copper conductor multi-strand single core in PVC conduit pipe/casing caping as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 2139.00 Supply, installation, testing & commissioning of concealed/surface wiring of modular plug point 6 Amp 3 pin with modular switch on same board by 3 nos. 1.5 sq. mm. FRLS PVC insulated copper Item- 3 conductor multi-strand single core in PVC conduit pipe/casing caping and accessories as per technical specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection. Total 35379.40 Supply, installation, testing & commissioning of concealed/surface wiring of modular plug point 16/6 Amp with 5 pin modular switch on separate board by 3 nos. 4 sq. mm. FRLS PVC insulated Item- 4 copper conductor multi-strand single core in PVC conduit pipe/casing caping and accessories as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 51615.00 Supply and recessing /fixing of PVC Conduit pipe 25 mm dia. medium confirming to IS:9537/ Part III/1983 (Latest version) with accessories, junction box etc including making chase, plastering Item- 5 /clamping etc as per technical specifications complete in all respect as per Technical Specification (1 No -3m) S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 33120.00 Supply and wiring of PVC Insulated Copper Cable ,Circular Sheathed Cable with Flexible Conductor as per IS:694 (Version 2) 4 sqmm, 3 Core as per Technical Specification. Supply and wiring of PVC Item- 6 Insulated Copper Cable ,Circular Sheathed Cable with Flexible Conductor as per IS:694 (Version 2) 4 sqmm, 3 Core as per Technical Specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 223990.00 Supply and wiring with 3 core flexible round copper cable each 2.5 SQMM size, PVC insulated, Item- 7 multistrand copper conductor, unarmourd, conforming to IS 694 - 2010 latest, with ISI mark as per technical specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 70330.00 RAJKOT DIVISION-ENGG/WESTERN RLY Supply installation Testing commissioning ,3 Core flexible round copper cable each 1.5 sq mm size, Item- 8 PVC insulated, multi strand copper conductor, unarmourd, conforming to is 694 - 2010 latest as per Technical Specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 57680.00 Supply, wiring, fixing, connecting testing and commissioning of Exhaust fan 200 mm plastic body Item- 9 with wiring complete fitting as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 88593.84 Supply, wiring, fixing, connecting testing and commissioning of energy efficient LED 18-20 W tube Item- 10 light fitting complete as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 115544.80 Supply, installation, testing and commissioning of 5 star BLDC motor type celling fan 1200 mm with Item- 11 down road, remote complete fitting etc. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 357966.72 Supply, installation, testing and commissioning of electronic fan regulator suitable capacity Item- 12 complete fitting as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 42190.08 Supply, erection, testing & commissioning of concealed wiring of 3 nos. 2.5 mm sq. FRLS PVC Item- 13 insulated copper conductor multi stranded single core in PVC conduit pipe as per Technical Specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 81640.00 Supply of and wiring of main/sub main in concealed manner with 4 sq. mm FRLS PVC ISI marked Item- 14 copper wire for phase, neutral & one number 2.5 sq. mm copper wire for earth continuity with PVC conduit pipe as per Technical Specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 73908.00 Supply, installation, testing and commissioning of concealed/surface wiring of mains/sub main by 3 Item- 15 nos. 6 sq mm FRLS PVC insulated copper conductor multistrand single core in casing capping/PVC conduit pipe & accessories complete as per Technical Specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 79500.00 SITC of split type precision ACs of 2TR capacity with high performance split type cooling units suitable for critical technology / equipment room featuring robust design to run 24x7, Auto Restart Item- 16 function, monitoring with unit to unit communication and ease of service, complete with indoor and outdoor units, microprocessor based controller and other accessories, as per specifications in Annexure I S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 4406211.60 Supply, fixing, testing & commissioning of interconnecting copper piping of size as per OEMs recommendations, min. size 3/8" outer dia. For discharge line & 5/8" outer dia. for suction line, & Item- 17 with insulation, between indoor and outdoor units as per site requirement, complete with hardware fittings, as per specifications in Annexure II. RAJKOT DIVISION-ENGG/WESTERN RLY S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 478694.00 Supply, fixing, testing and commissioning of PVC insulated & sheathed copper cable flexible Item- 18 multistrand of size 1.5mm², 7 core for precision AC's remote cabling, as per specifications in S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 46200.00 Item- 19 Fabrication, supply and fixing of M.S. stand for condensing unit of ACs, as per specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 254896.80 SETC of 3 phase distribution board comprising of 1) 63 Amps TPN MCB - 01 Nos 2) 32Amps TPN Item- 20 MCB TPN - 02 Nos, 3) 16 Amps MCB (DP) - 06 Nos as per specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 70747.84 Supply, installation, testing and commissioning of LT Panel having 160 Amp. MCCB FP as incoming Item- 21 and 6 Nos. 63 Amp. MCCB FP as outgoing complete with accessories as per technical specification S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 356012.00 Supply of material, Installation, testing & commissioning of octagonal hot dip galvanized street light Item- 22 pole or similar complete as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 233934.24 Supply, installation, testing and commissioning of 45 Watt LED street light fitting IP 66 complete Item- 23 with all associated accessories. The contractor shall provide the mounting arrangement for fittings as required at site and as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 115610.00 Supply of 4x16 sq mm LT underground cable for Working Voltages Up to and including 1100 Volts Item- 24 as per Technical Specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 162510.00 Supply of 4x25 sq mm LT underground cable for Working Voltages Up to and including 1100 Volts Item- 25 as per Technical Specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 330880.00 Supply of 4x50 sq mm LT underground cable for Working Voltages Up to and including 1100 Volts Item- 26 as per Technical Specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 396080.00 Supply of 4x70 sq mm LT underground cable for Working Voltages Up to and including 1100 Volts. Item- 27 as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 525750.00 RAJKOT DIVISION-ENGG/WESTERN RLY Transportation, laying, installation, terminating, testing and commissioning of LT/HT cable of sizes 4 Item- 28 core 10 sq. mm. to 4 core 300 sq. mm. in existing trench, pipe or on structure as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Transportation ,terminating ,testing and commissioning. Total 126040.00 Item- 29 Excavation of cable trench for 1 no cable in ordinary soil refilling and remaking surface complete. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 171875.00 Excavation of cable trench for 1 no cable in Hard rock /Asphalted refilling and remaking surface Item- 30 complete. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 351690.00 Horizontal Direction Drilling/ boring without damage of surface road using auger/HDD machine the bore shall be 150mm. dia, and shall be done at the depth of minimum 1.5 meter or as requirement Item- 31 of site from the ground level this include insertion of 110mm dia. HDPE pipe as per technical specification S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 190358.00 Supply, installation, testing and commissioning of HDPE pipe 110 mm. nominal dia. as per IS4984- Item- 32 1995 as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 102078.00 Supply and laying of 50 mm DWC pipe for cable laying in circulating area pole/parking/footpath as Item- 33 per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 122690.00 Item- 34 Supply and laying of 110mm DWC HDPE pipe with coupler as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 126250.00 Item- 35 Supply and laying of half round RCC pipe 150 mm. ID & 1 mtr. length as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 28735.00 Supply, installation, testing and commissioning of 50 mm. height and 200 mm. width GI hot dip Item- 36 perforated cable tray and all required mounting accessories as per technical specification. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 238920.00 Item- 37 Supply of PVC channel with closures per detailed specification. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 42060.00 Supply of Aluminum Double Sided A Shape Platform step ladder, Capacity 200 kilogram as per Item- 38 technical specification. S No. Item No Description of Item Unit Qty Rate Amount RAJKOT DIVISION-ENGG/WESTERN RLY
Supply & Erection Total 68240.00 Supply of materials and providing 50 mm dia. G.I. pipe earthing with B class GI pipe as per IS 3043- Item- 39 1987as amended latest. S No. Item No Description of Item Unit Qty Rate Amount
Erection Total 95009.25 Supply and fixing G.I. strip hot dip galvanized of size 25 mm x 6mm for earthing, including cutting, Item- 40 bending, welding, excavation etc. S No. Item No Description of Item Unit Qty Rate Amount
Supply & Erection Total 23430.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ProformaofAnnexure-VIB.pdf
ATTACHMENT
Annexure-VI.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
Annexure-VVARevisedFormatForCertificate.pdf
ATTACHMENT
PBGFORMAT.pdf
ATTACHMENT
TermsandConditionsforelectricalworkforEIwork.pdf
ATTACHMENT
TECHNICALSPECIFICATIONSforEIwork.pdf
ATTACHMENT
GCCACS1to11.pdf
ATTACHMENT
ACS01to10ofIRGCCApril2022.pdf
ATTACHMENT
ProformaofMOUforJV_1.pdf
ATTACHMENT
BankDetails.pdf
ATTACHMENT
NoRelativeCertificate.pdf
ATTACHMENT
CertificateforRailwayEmployeeRe-engagement.pdf
ATTACHMENT
LetterofCreditasModeofPayment.pdf
ATTACHMENT
ProcedureforpaymentofcontractorbillImplementationofGST.pdf
ATTACHMENT
ProcedureForEnsuringSafetyAtWorkSite.pdf
ATTACHMENT
SafetyRules.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
Download all tender documents and submit your bid