Tender Value
₹19.9 Cr
EMD Value
₹19.9 L
Closing Date
30 Sept 2026, 5:00 pm
Chief Engineer, Drainage
O/o the Chief Engineer, Drainage, Gandarapur, Kataka
Dredging, earthwork
2026_CEDC_140724_1
CE-DR-CTC-DD-PURI-04/2026-27
National Competitive Bid
Civil Works - Others
Percentage
540 days
Pratapa Ramachandrapur, Brahmagiri
Please refer to tender documents.
2 documents required · 2 mandatory
₹10,000
₹19.9 L
Yes
10 Sept 2026
10 Sept 2026
1 Oct 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
10 Sept 2026 - 17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Thickly grown water hyacinth (thickly grown) from canal and drainage channels including uprooting vegetation, grass bushes, shrubs & trees, removal of stump of trees and disposal of unserviceable materials away from work site etc. complete as per direction of the Engineer-in –charge. | 6,55,600 | Sqm | 2.8 | ₹18,35,680 |
| 2 | Desiltation by dredging from river / nallah for depths varying from 1.00 m to 3.00m including fixing of pipelines, floaters and floating pipelines for disposing of water slurry consisting silt and sand etc upto a distance of 1000m. The rate shall include the cost of labour, materials, consumables, POL, spare parts and accessories required to keep dredger in running condition, maintenance of dredgers, T&P & cess etc including building in the island by providing geo tubes and accessories or by tin sheets for formation of bund for dumping of dredged material with all lead and lift including all taxes etc. and excluding GST as per the direction of the Engineering – in – charge. The job includes all pre and post dredging surveys for payment purpose. The area of disposal of dredged materials should be arranged by the agency at his own cost, own risk and responsibility, Govt. land is taken into first priority. | 4,07,151.89 | Cum | 186 | ₹7,57,30,252.1 |
| 3 | Desiltation by dredging from river / nallah for depths varying from 1.00 m to 3.00m including fixing of pipelines, floaters and floating pipelines for disposing of water slurry consisting silt and sand etcupto a distance of 1500m. The rate shall include the cost of labour, materials, consumables, POL, spare parts and accessories required to keep dredger in running condition, maintenance of dredgers, T&P & cess etc including building in the island by providing geo tubes and accessories or by tin sheets for formation of bund for dumping of dredged material with all lead and lift including all taxes etc. and excluding GST as per the direction of the Engineering – in – charge. The job includes all pre and post dredging surveys for payment purpose. The area of disposal of dredged materials should be arranged by the agency at his own cost, own risk and responsibility, Govt. land is taken into first priority. | 2,03,575.95 | Cum | 243 | ₹4,94,68,954.88 |
| 4 | Desiltation by dredging from river / nallah for depths varying from 1.00 m to 3.00m including fixing of pipelines, floaters and floating pipelines for disposing of water slurry consisting silt and sand etcupto a distance of 2000m. The rate shall include the cost of labour, materials, consumables, POL, spare parts and accessories required to keep dredger in running condition, maintenance of dredgers, T&P & cess etc including building in the island by providing geo tubes and accessories or by tin sheets for formation of bund for dumping of dredged material with all lead and lift including all taxes etc. and excluding GST as per the direction of the Engineering – in – charge. The job includes all pre and post dredging surveys for payment purpose. The area of disposal of dredged materials should be arranged by the agency at his own cost, own risk and responsibility, Govt. land is taken into first priority. | 2,03,575.95 | Cum | 347 | ₹7,06,40,853.26 |
| 5 | Earth work in excavation of drain by mechanical means in all kind of soil including stoney earth, gravel moorum etc. interspread with boulders upto 1/2 cum size with all leads, lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials including loading, unloading and transportation by mechanical means with an initial lead of 1 Km from the place of excavation including levelling and rough dressing as per the specification and design with cost of hire charges at all machineries T & P, operations maintenance cost with all leads, lifts and delifts etc complete with all taxes, labour cess T&P etc. complete with all cost incidental to the work as per the drawing specification and direction of the Engineer-in-charge. (Measurement to be taken on initial and final level basis). | 20,732.76 | Cum | 81.93 | ₹16,98,635.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TenderSchedulePuriRatnachira.pdf
Tender Documents • 1.52 MB
BOQ_609104.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .