| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹2.1 Cr+₹99,126.97 (0.47%)Rejected-Finance KUTTIYIL MANGAMKUZHY | PATHANAMTHITTA | KERALA | 689694 | ₹2.1 Cr+₹99,126.97 (0.47%) | L2 | Rejected-Finance Highest |
Tender Value
₹2.0 Cr
EMD Value
₹50,000
Closing Date
14 Feb 2023, 6:00 pmClosed
Superintending Engineer HECC
Superintending Engineer, Harbour Engineering Central Circle, Corporation Building, Paramara Road, Ernakulam North, Kochi-18
GENERAL-Upgradation of Coastal roads in Alappuzha district -Road from Bakery palam to LC Jetty ward no. 3 and 4 of Kainakary Panchayath in Kuttanad LAC-General Civil Work
2023_HED_555673_1
HED/CEHED/TR/123/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
450 days
Kainakary Panchayath
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,515
Yes
₹50,000
Yes
25 May 2023
4 Feb 2023
17 Feb 2023
4 Feb 2023
14 Feb 2023
4 Feb 2023
Amount
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
Miscellaneous works
OD3084/2022-2023:Filling with Quarry Muck <br> Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD2851/2022-2023:Random rubble masonry with hard stone in foundation and plinth including levelling up to plinth level with:<br>Cement mortar 1:6 (1 cement : 6 coarse sand) Details of cost for 1 cum<br>MATERIAL
OD2969/2022-2023:60.1.1 RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
OD2902/2022-2023:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata bellow bed level including cost conveyance, labour charges etc complete.(Based on 60.64.1)
OD3088/2022-2023:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end.
Box Culvert
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>V. R.C.C. grade M 25
12.5.4:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> IV. R.C.C. grade M 25
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
RETAINING WALL Top belt
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Retaining wall & Inauguration stone
16.86.1:Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20 mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-charge.Area less than 0.50 sqm.
16.21:Engraving letters in hard stone
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
SIBI FRANCIS
Bidder Name
SIBI FRANCIS
ANIL KUMAR R
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_816743.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .