| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC Agreement executed with Sri. P Noushad |
| 2 | L2₹4.1 LRejected-AOC | ₹4.1 L | L2 | Rejected-AOC SECOND LOWEST |
| 3 | L3₹4.5 LRejected-AOC | ₹4.5 L | L3 | Rejected-AOC THIRD LOWEST |
| Sl No | Description | Qty | Unit | NOUSHAD POOVATHINGAL L1 | MUHAMMED SHAFI P.A. L3 | MOHAMMED MUSTHAFA P. L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix . A | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 400 | sqm | 13.53 ₹5,412 | 17 ₹6,800 | 15.4 ₹6,160 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 25 | cum | 1,156.5 ₹28,912.50 | 1,450 ₹36,250 | 1,316.2 ₹32,905 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 245.5 | cum | 191.67 ₹47,054.99 | 240 ₹58,920 | 218.14 ₹53,553.37 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9 | cum | 5,902.07 ₹53,118.63 | 7,500 ₹67,500 | 6,717.09 ₹60,453.81 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 32 | sqm | 624.66 ₹19,989.12 | 723 ₹23,136 | 710.93 ₹22,749.76 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 16 | cum | 6,375.44 ₹1.0 L | 7,400 ₹1.2 L | 7,255.83 ₹1.2 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.82 | cum | 6,871.56 ₹12,540.60 | 8,800 ₹16,060 | 7,820.45 ₹14,272.32 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 80 | sqm | 255.78 ₹20,462.40 | 300 ₹24,000 | 291.1 ₹23,288 |
| 1.01 | OD15675/2025-2026:Engaging labor for cleaning pump house and surroundings and slipped earth and other floating materials in canal during distribution etc. including direction of departmental officers at site. | 110 | no | 805.14 ₹88,565.40 | 900 ₹99,000 | 759.56 ₹83,551.60 |
Tender Value
₹5.1 L
EMD Value
₹12,704
Closing Date
9 Mar 2026, 3:30 pmClosed
Assistant Executive Engineer
Office of the AEE, MI Subdivision, Shoranur
GENERAL-Annual Maintenance 2025-26- Annual Maintenance works to LIS Naripottakkunnu in Parudur PanchayathGeneral Civil Work
2026_Irrig_842534_1
IRR/IA/TR/3517/2025_5_7_6/1
Open Tender
Civil Works - Lift Irrigation Schemes
270 days
Paruthur
Please refer tender documents.
7 documents required · 7 mandatory
₹1,120
₹12,704
16 May 2026
2 Mar 2026
12 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Appendix . A
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD15675/2025-2026:Engaging labor for cleaning pump house and surroundings and slipped earth and other floating materials in canal during distribution etc. including direction of departmental officers at site.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1421588.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
viewsbd.pdf
Tender Documents • 2.15 MB
BOQ_1421588.xls
BOQ • 0.30 MB
affidavitformandepayment.pdf
Additional Documents • 0.08 MB
formoftender.pdf
Other Document • 0.18 MB
integritypact.pdf
Other Document • 0.05 MB
Download all tender documents and submit your bid