Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2Accepted-Finance | ₹2 | L1 | Accepted-Finance L1 |
| 2 | L2₹4Rejected-Finance | ₹4 | L2 | Rejected-Finance L2 |
| 3 | L3₹5Rejected-Finance | ₹5 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | A.G Horizon Pvt. Ltd. L1 | 4D ENGENEERING CONSULTANTS L2 | WATER RESOURCES DEPARTMENT, ASSAM L3 |
|---|---|---|---|---|---|---|
| 1.00. | ||||||
| 1.01 | % Percentage fo the project cost | 1 | Job | 2 ₹2 Lowest | 4 ₹4 | 5 ₹5 |
| 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | 10 | Nos | - | - | - |
| 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 1,500 | Nos | - | - | - |
| 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | 12 | Nos | - | - | - |
| 1.05 | b) CI bend 22.5° (250mm dia) | 1 | Nos | - | - | - |
| 2.00 | Construction of chamber for 100mm sluice plates | 1 | Nos | - | - | - |
| 3.00 | Construction of chamber for 100mm sluices valve | 1 | Nos | - | - | - |
| 4.00 | Supplying, Conveying and fixing spls. Including ea | 1 | Nos | - | - | - |
| 5.00 | Supplying, Conveying and fixing spls. Including eart | 1 | Nos | - | - | - |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
7 Feb 2026, 9:00 amClosed
Chief Engineer (P and D), WRD
O/o the Chief Engineer (P and D), WRD Chimpu, Itanagar- 791113
Transaction Advisory Services for Flood Management and River Erosion Mitigation at multiple locations identified under the Schemes of the Government of Arunachal Pradesh
2026_APWRD_2919_1
WRD/CE/WZ/TENDER-FMP/01
Open Tender
Consultancy
Item Rate
180 days
Chimpu, Itanagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
SBI ITANAGAR
₹1 L
Chimpu, Itanagar
16 Feb 2026
31 Jan 2026
7 Feb 2026
31 Jan 2026
7 Feb 2026
2 Feb 2026
31 Jan 2026 - 2 Feb 2026
2 Feb 2026
% Percentage fo the project cost
Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete
Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete
Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in
b) CI bend 22.5° (250mm dia)
Laying and Jointing PVC Pipe. Heading
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using
Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
SBD.pdf
Tender Documents • 36.50 MB
BOQ_3120.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].