DY CE(E)/IGWTP
IGWTP, MONIRAMPORE, BARRACKPORE
STRENGTHENING OF THE LEAKAGE STRETCH OF THE 62 INCH DIA MILD STEEL PRESURRISED PALTA TALLAH WATER TRANSMISSION MAIN OPPOSITE TO HALDIRAMS,BARRACKPORE WITHIN THE LAUT BAGAN CAMPUS
2026_KMC_1024479_1
KMC/WS/IGWTP/002/26-27, DT-08/05/2026
Open Tender
MECHANICAL
Percentage
75 days
IGWTP/BARRACKPORE
AS PER NIT
4 documents required · 4 mandatory
₹0
₹1.5 L
Office of the Dy.CE(E)/IGWTP
11 Jun 2026
16 May 2026
11 Jun 2026
16 May 2026
9 Jun 2026
25 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | PART-A | - | - | - | - |
| 1 | Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | - | Day | 202 | - |
| 2 | Hire and labour charges for 100 mm dia bamboo railing on Jhau / Eucalyptus post 1.40 m above G.L and 0.60 m below G.L tied strongly with bamboo railing with coir rope, digging holes for posts in any sort of soil or concrete surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer- incharge after removing the barricade. (Cost of restoration to be paid separately.) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah / Eucalyptus posts @1.80 m. apart (i) Railing with 4 rows. | - | M | 82 | - |
| 3 | Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x 100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap around the post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of the Engineer-in-charge. Payment of concrete and painting to be made separately. ii) 900 mm x 600 mm size of board | - | no | 813 | - |
| 4 | Hire & labour charges for diesel generating set for lighting including fuel, 300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period. | - | Day | 1,650 | - |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete, a) Up to 1.50 m below G.L. | - | %M3 | 11,927 | - |
| 6 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.4 | %M3 | 19,238 | ₹7,695.2 |
| 7 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required completec) (c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary | - | %M3 | 23,470 | - |
| 8 | Extra over the corresponding item of earth work for removing semi liquid mud or slushy earth by iron pans, buckets etc. | 0.4 | M3 | 2,658 | ₹1,063.2 |
| 9 | Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge). (a) Depth upto 1.5 m
/.((2x( L+B)xDeep)- ( Dx(deep- D)x2)) | - | SqM | 386 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
tecbid.pdf
Tender Documents • 2.04 MB
BOQ_2517743.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .