| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-Finance | 1 | Accepted-Finance L1 LOWEST BIDDER | |
| 2 | 2₹7.4 L+₹77,623 (11.7%)Rejected-Finance | 2 | Rejected-Finance RATES ARE ON HIGHER SIDE | |
| 3 | 3₹8.5 L+₹1.8 L (27.6%)Rejected-Finance FLAT NO S 30 93 SHIVPUR SHIVPUR SHIVPUR VARANASI UTTAR PRADESH 221003 UDYAM UP 75 0007051 | VARANASI | UTTAR PRADESH | 221003 | 3 | Rejected-Finance RATES ARE ON HIGHER SIDE |
Tender Value
₹11.2 L
EMD Value
₹11,500
Closing Date
29 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC AZAMGARH
220KV S/S COLONY HAFIZPUR AZAMGARH
REPLACEMENT OF GASKET OF 160 MVA T/F-II AT 220 KV S/S RASARA UNDER ETD, BALLIA.
2023_UPTCL_861506_1
79/AETC/2023-24
Open Tender
Electrical Works
Item Wise
60 days
BALLIA
UTR SLIP OF EMD TENDER FEE PAN CARD GST CERTIFICATE WORK EXPERIENCE etc.
2 documents required · 2 mandatory
₹590
SE ETC UPPCL AZAMGARH
₹11,500
5 Dec 2023
10 Nov 2023
30 Nov 2023
10 Nov 2023
29 Nov 2023
10 Nov 2023
10 Nov 2023 - 29 Nov 2023
Amount
Dismantling & safe stacking of Mulsifire air pipe line,water pipe line and proper stacking.
Drain out of the T/F oil from 160 MVA tank into empty oil drums/oil tanker including opening of valve and filling in empty oil drums and proper stacking.
Dismantling of 160 MVA T/F HV/LV/Neutral Bushing and its turret opening of all pipe line 6",4" & 2" inlet,outlet valve,diverter switch inspection cover,Bucholz relay,PRV for replacement of gasket.
Replacement of old and damaged gasket of 160 MVA T/F make of good quality premium nitrile bonded rubberized cork sheet as per site requirement at following details below. Providing and making of HV Turret Gasket
Providing and making of HV Bushing Gasket
Providing and making of LV Turret Gasket
Providing and making of LV Bushing Gasket
Providing and making of gasket of replacement cover
Providing and making of 6" Butterfly valve
Providing and making of Radiator pipeline 6" dia
Providing and making of C.T. inspection cover HV/LV
Providing and making of C.T. inspection cover TV
Providing and making of C.T. inspection cover Neutral
Providing and making of 1'' Dia pipeline Gasket
Providing and making of Surge relay gasket
Providing and making of Gasket Buchholz Relay
Providing and making of gasket of PRV
Providing and making of OLTC diverter switch plate
Providing and making of 1'' Dia valve Gasket
Providing and making of 4'' Dia valve Gasket
Providing and making of 3'' Dia valve Gasket
Providing and making of Top rubber ball of TV Bushing
Providing and making of TV Bushing Gasket
Providing and making of N Bushung Gasket
Providing and making of flow indicator gasket
Providing and making of gasket of oil pump
Providing and making of gasket 3" dia valve
Providing and making of gasket WTI/OTI pocket
Providing and making of gasket of OLTC tank
Providing and making of nylon washer of radiator bushing,air releasing plugs
Providing and making of gasket of NRV
Providing and making of gasket of MOG
Replacement of different nut & bolts of main tank oil pipe line
Erection of turret hv/lv/tv side and erection of bushing,oil pipe line 6" & 4"3',Gear box,OLTC Pipe line,pump,flow meter,inspection cover etc. for complete of work
Complete evacuation of 160 MVA Transformer main tank and filling of Dry air/Dry nitrogen of dew point -50 deg celcius or better in vaccum upto pressure of 0.25 kg/cm2 and then again evacuating Transformer tank after required time interval(approx 12/24 hours) using centrifusing machine.The work shall include connecting pipe of machine as required measuring Due point values of N2 after every cycle till the required value is achieved.
Cleaning and flushing of T/F core winding in main tank with hot T/F oil through centrifuging machine.
Overhauling of diverter switch,removal of the divertor switch from chamber cleaning by hot oil,remove dirty oil and proper cleaning and fixing in original shape.
Create vaccum inside the tank and filling the T/F oil.
Re-centrifuging of T/F oil already filled in oil tanker taking IR/BDV Value of T/F oil at an interval of 6 hrs as per norms of T/F maufacturer.After achieving the desired value,top up the centrifuged T/F at required level(machine shall be provided by the contractor)(approx 54 kL).
Erection of emulsifier system air/water pipr line proper replacement of Gasket and tilting nut and bolts.
Safe Carriage of 02 no 20 kL T/F oil tank from 400 kv S/S,Sarnath & 01 no 20 kL T/F oil tank on private vechile from 400 kv S/S,Kasara including loading & unloading with hydra to 220 kV Rasra substation including returning back of T/F oil tank.
Meena Elect & Engg. Works
RISHAB OIL RECLAIMATION PRIVETE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .