Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,018Accepted-AOC VILLAGE BALHI DHAVER P O DHANGOTA BARSAR TEHSIL DHATWAL DISTT HAMIRPUR H P 176040 | HAMIRPUR | HAMIRPUR | HIMACHAL PRADESH | 176040 | ₹87,018 | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹88,797.80+₹1,779.80 (2.05%)Rejected-AOC VILLAGE TATORI P O NIHRI TEHSIL NIHRI DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | ₹88,797.80+₹1,779.80 (2.05%) | L2 | Rejected-AOC Other than lowest |
| 3 | L3₹89,638+₹2,620 (3.01%)Rejected-AOC HIMACHAL PRADESH HP | UNA | HIMACHAL PRADESH | 177202 | ₹89,638+₹2,620 (3.01%) | L3 | Rejected-AOC Other than lowest |
| 4 | L4₹89,975.90+₹2,957.90 (3.40%)Rejected-AOC VILL TIUKRI P O KUNIHAR TEHSIL ARKI DISTT SOLAN H P 173207 | SOLAN | HIMACHAL PRADESH | 173207 | ₹89,975.90+₹2,957.90 (3.40%) | L4 | Rejected-AOC Other than lowest |
| 5 | L5₹90,259+₹3,241 (3.72%)Rejected-AOC VILLAGE DHAR P O DASHERA TEH BALH REWALSAR DISTT MANDI HP 175036 | REWALSAR | MANDI | HIMACHAL PRADESH | 175036 | ₹90,259+₹3,241 (3.72%) | L5 | Rejected-AOC Other than lowest |
| Sl No | Description | Qty | Unit | KHEM SINGH L7 | SURESH CHAND L2 | DALIP KUMAR L4 | Yograj L8 | HUKAM SINGH L6 | GHANSHYAM L3 | CHUNI LAL L5 | Devender Kumar L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumPer work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sidesand bed stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as Per the direction and to the entire satisfaction of the Engineer-in-charge. | 5.94 | Cum | 250 ₹1,485 | 220 ₹1,306.8 | 280 ₹1,663.2 | 300 ₹1,782 | 200 ₹1,188 Lowest | 200 ₹1,188 Lowest | 250 ₹1,485 | 300 ₹1,782 |
| 2.00 | Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for in-situ reinforced concretre and plain concrete work in all leads and lifts in :- Vertical surface such as walls(any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like. | 32.4 | Sqm | 275 ₹8,910 | 270 ₹8,748 | 340 ₹11,016 | 300 ₹9,720 | 250 ₹8,100 Lowest | 250 ₹8,100 Lowest | 260 ₹8,424 | 250 ₹8,100 Lowest |
| 3.00 | Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in retaining wall/ breast wall complete in all respect and as Per direction and to the entire satisfaction of the Engineer-in-charge. | 16.07 | Cum | 6,200 ₹99,634 | 4,900 ₹78,743 | 4,810 ₹77,296.7 | 6,500 ₹1,04,455 | 5,500 ₹88,385 | 5,000 ₹80,350 | 5,000 ₹80,350 | 4,800 ₹77,136 Lowest |
Tender Value
₹1.5 L
EMD Value
₹2,940
Closing Date
2 Aug 2025, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Sunderagar
CO protection wall for treatment units
2025_HPIPH_110895_1
EE JSD SNR TA etender 2025-5001-35 dt. 24.07.2025
Open Tender
Civil Works - Water Works
Item Rate
90 days
Nihri
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹2,940
2 Sept 2026
24 Jul 2025
4 Aug 2025
24 Jul 2025
2 Aug 2025
24 Jul 2025
Amount
Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumPer work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sidesand bed stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as Per the direction and to the entire satisfaction of the Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for in-situ reinforced concretre and plain concrete work in all leads and lifts in :- Vertical surface such as walls(any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like.
Providing and laying cement concrete 1:5:10 (1 cement: 5 sand: 10 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in retaining wall/ breast wall complete in all respect and as Per direction and to the entire satisfaction of the Engineer-in-charge.
SURESH CHAND (BID ID -540877)
GHANSHYAM (BID ID -539515)
DALIP KUMAR (BID ID -540786)
CHUNI LAL (BID ID -540965)
HUKAM SINGH (BID ID -541004)
KHEM SINGH (BID ID -540670)
Yograj (BID ID -540338)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .