Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹56.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹58.8 L+₹2.2 L (3.89%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹66.1 L+₹9.5 L (16.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹71.2 L+₹14.5 L (25.7%)Admitted-Fee/PreQual/Technical/Finance VILL SUBHASNAGAR P O KAKDWIP P S KAKDWIP NOW HARWOOD POINT COASTAL DIST SOUTH 24 PARGANAS WEST BENGAL INDIA | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹71.5 L+₹14.9 L (26.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹74.5 L
EMD Value
₹1.5 L
Closing Date
30 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
6 Strand Road, Kolkata 700001
FACELIFTING AND RENOVATION OF THE NEW GUEST HOUSE and CHAMARI BLDG. IN BAHARAMPUR OUTSIDE and INSIDE THE OFFICE PREMISES AND OTHER MISCELLANEOUS WORKS.
2026_KoPT_901472_1
SMPA/KDS/CIV/T/3029/06
Open Tender
Civil Works
Percentage
270 days
Berhampore, under Kolkata Section
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,770
Yes
SMPA
₹1.5 L
Yes
2 Apr 2026
6 Mar 2026
31 Mar 2026
6 Mar 2026
30 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary).(Payment to be made on area cleared). | 5,000 | Sqm | 11 | ₹55,000 |
| 2 | Surface Dressing of the ground inany kind of soil including removing vegetation inequalities not exceeding 15cm depth and disposal of the rubbish within a lead upto 75m as directed. | 100 | Sqm | 10 | ₹1,000 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed.The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of the excavation not exceeding 1500mm. | 50 | Per 100 Cum. | 11,927 | ₹5,96,350 |
| 4 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. | 12 | Cum | 447 | ₹5,364 |
| 5 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. upto 150 mm. thick. | 7.5 | Cum | 939 | ₹7,042.5 |
| 6 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish, as directed within a lead of 75 m. including stacking of steel bars. In ground floor including roof. | 5 | Cum | 1,956 | ₹9,780 |
| 7 | Earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm Including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation. | 15 | Per 100 Cum. | 7,754 | ₹1,16,310 |
| 8 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supplyof sand. (payment to bemade onmeasurement of finished quantity). | 100 | Per 100 Cum | 93,621 | ₹93,62,100 |
| 9 | R.C. shelves (1:1.5:3) either precast or cast in situ with stone chips and necessary reinforcement upto 1% (0.8% main and 0.2% distribution bars), shuttering etc. and 10 mm. thick cement plaster (1:4) including neat cement finishing and cutting chase fitting and fixing in position, mending good damages as necessary complete. 50 mm. Thick panels. In ground floor. JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL | 10 | Sqm | 1,131 | ₹11,310 |
| 10 | Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed. (Payment to be made on measurement of portion of roof or wall removed). | 215 | Sqm. | 41 | ₹8,815 |
stage.html
html • 0.03 MB
finance_947527.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.91 MB
3029.pdf
Tender Documents • 2.89 MB
BOQ_947527.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .