Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
25 Sept 2026, 6:00 pm
add.city.engineer (amc met/Hospital, East Zone)
PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR, VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
340522
EZ 03/30-2026-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
31 Aug 2026
31 Aug 2026
31 Aug 2026
25 Sept 2026
31 Aug 2026
2 TOTAL ESTIMATED COST ₹
3 EARNEST MONEY ₹
In DEMAND DRAFT FROM
BANK ACCEPTABLE TO THE AMC
4 VALIDITY PERIOD 120 DAYS FROM THE DATE OF
OPENING OF THE TENDER.
5 SECURITY DEPOSIT 5% OF SANCTIONED TENDER AMOUNT
IN FORM OF CASH / DEMAND DRAFT /
BANK GUARANTEE.
6 RETENTION MONEY 2% FROM EACH RUNNING BILL WILL BE
RETAINED AND WILL BE RELEASED
AT THE TIME OF FINAL BILL
7 TIME ALLOWED FOR
COMPLETION OF THE WORK 12 Months
FROM THE DATE OF WRITTEN
ORDER TO COMMENCE WORK
8 TENDER FEE Rs. -- ₹ 900 TENDER CLASS -- E2
In DEMAND DRAFT
BANK ACCEPTABLE TO THE AMC
Contractor's Name :-
Contractor's Address :-
Contractor's Register Number / Renewal Year / class :-
Contractor's Bank, Branch Name :-
Bank Account Number :- Banks MICR Number-
8 DOWN LOAD DATES FOR
TENDER FROM WEB SITE 25-Sep-26 6.00 PM
9 DATE ON OR BEFORE WHICH
THE TENDER MUST REACH
THE OFFICE 28/Sep/26 4.00 PM
10 OPENING DATE OF THE
TENDER BY THE OFFICE 28-Sep-26 5.00 PM
11 LOCAL COMPETITIVE BIDDING
-- TENDER CLASS -- E2
12 MODE OF SENDING THE IN SEALED COVER BY REGISTERED
TENDER POST OR IN PERSON.
TENDER SENT BY ORDINARY POST
WILL BE REJECTED OUTRIGHT.
CONDITIONAL TENDER WILL BE
REJECTED OUTRIGHT.
13 DESCRIPTION ESSENTIAL TO NAME OF THE WORK.
BE MADE ON SEALED COVER TENDER No.--
DATE OF RECEIVING TENDER BY
14 MODE OF QUOTING RATES IN PERCENTAGE RATE IN FIGURES AS
SCHEDULES OF RATES. WELL AS IN WORDS.
TENDER SHALL BE SUBMITTED IN
DUPLICATE.(EXCEPT E-TEDER)
NAME OF WORK --
PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR,
VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
TENDER NOTICE No. -- 3 TENDER No. --
LOCAL COMPETITIVE BIDDING -- TENDER CLASS -- E2
Time Limit (Months)
Issue Date 25-Sep-26 Last Date of 28-Sep-26 Opening 28-Sep-26
of Tender --- 6.00 PM Receiving of 4.00 PM Date of 5.00 PM
From - To Tender --- Tender-
The Municipal Commissioner of Ahmedabad Municipal Corporation, invites Percentage
rate tender for the above works from the contractors registered with Municipal
Corporation of Ahmedabad in Class E2 or registered with Government of Gujarat
in Class E2 or from contractors registered in similar class with any other
State Government of India who have the financial capability and technical ability to
carry out the work. Also Private pre qualified reputed experience builders can also
apply. Experience in carrying out works of comparable nature is essential.
Filled up tender shall be received by Asst. Manager, East Zone Zonal Office, Ahmedabad
Municipal Corporation, Harubhai Maheta Bhavan, Viratnagar Char Rasta, Nikol, Ahmedabad -
382415 on or before last date of receiving tender with Tender Fee and E.M.D.as per information
in memorandum above.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
SPECIAL GENERAL INSTRUCTIONS TO TENDERERS
NAME OF WORK --
PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR,
VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
1 The work is to be completed in all respects within 12 months reckoned
from the date of written order to commence the work.
2 The tender shall be valid for acceptance for a period of 120 days from the date of
opening of tenders.
3 Each tender must be accompanied by a receipt for a deposit as Earnest Money
of ₹ 10000.00 in Pay order, Demand Draft, Bank Guarantee or Cheque from
bank acceptable to the AMC.
4 Tender deposit is accepted as detailed out in Ahmedabad Municipal Corporation, Section B-
1, Engineering Department, percentage Rate Tender and General condition's of Contract for
Works here in afterwards referred as Form- B-1.
5 An overall schedule of the "Work Plan "of the project based "Network Technique Method"
Programmer Evaluated and Review Technique (PERT) / Critical Path Method (CPM) for
appreciating his method of planning, scheduling and control of project execution should be
submitted by the contractor.
6 After the demand of R.A. Bills by contractors, work shall be verified by the Engineer in charge of
AMC or the Architect / Consultant will give his certificate, whether the work has been executed
according to the standard norms and approved designs and the workmanship is of
acceptable quality. Also the progress of work shall be according to the construction programme
approved by AMC or the Architect /Consultant. On recommandations of Engineer in charge of
AMC or Architect / consultant , R.A. Bills will processed for the payment.
7 2% FROM EACH RUNNING BILL WILL BE RETAINED AND SHALL BE RELEASED
AT TIME OF FINAL BILL
8 In the circumstances of dispute, the decision of Add. City Engineer ( Zones) shall be final &
bound for the contractor. In case, in the detailed specifications of materials and code of
practice specifications of Index Nos. are found missing thus they must be referred to the of
specification of materials and code of practice.
PAYMENT CONDITIONS TO CONTRACTOR
9 Without proper Refilling, compaction and watering no payment shall be given to
contractor for excavation, refilling and or earth filling items.
10 Contractor shall have to submit a demand letter for running bill as well as final bill..
11 If progress of work is not in proportion to the time limit, otherwise penalty will be imposed.
MATERIAL PROCUREMENT
12 All material like Cement, M. S. Bars / Tor steel reinforcement and structural steel, Bitumen
etc. required for this work shall be procured by the contractor from the open market.
13 No difference in rates of cement and steel prevailing in the market in Ahmedabad at a later date
shall be paid /Recovered by A.M.C.(as the case may be) to / from contractor for the procurement
of Cement and Steel from open market in Ahmedabad. Contractor will not be paid for any
transport, handling & storage expenses separately and he should quote for the works
14 Test certificate for all materials like Cement , Steel, Bitumen and other important materials shall
be obtained and submitted by contractor. Contractor shall have to produce test certificates for
all procurement of Cement , Steel, Bitumen and other important materials
INSTRUCTION TO THE TENDERER
15 ALL INSTRUCTIONS TO TENDERERS, SPECIAL INSTRUCTIONS FOR
CONTRACTORS, DOCUMENTS, RULES FOR GRANT OF ADVANCES, CLAUSE FOR
ARBITRATION, GENERAL SPECIFICATIONS, PROJECT INFORMATION
GENERAL,PAYMENT CONDITION TO THE CONTRACTOR, DEFINITION OF TERMS
EARNEST MONEY, SUBMISSION OF TENDERS, GENERAL RULES AND
DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS AND
CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER
STANDARD PERFORMA OF AHMEDABAD MUNICIPAL CORPORATION OF
ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER
CONTRACTOR MUST HAVE THIS DOCUMENT AND SHALL BOUND FOR THE SAME.
I HAVE READ AND VERIFIED ABOVE DOCUMENT AS WELL AS P.W.D.
GENERALTECHNICAL SPECIFICATIONS , CONDITIONS, CLAUSES, INSTRUCTIONS ETC.
AND AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH CONDITIONS AND CLAUSES OF FORM B -1 AND
AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS
AND AGREE TO ABIDE BY THEM.
IN THIS TENDER THERE ARE MANY POSSIBILITIES OF ADDITIONAL AND ALTERATION
ITEMS HENCE MANY ITEMS ARE LIKELY TO BE DROPPED OR THERE QUANTITIES ARE
LIKELY TO BE VARY UP TO ANY EXTENT AND HENCE FOR THIS CONTRACTOR
WILL NOT CLIAM FOR ANY EXTRA AMOUNT OR COMPENSATION FOR THE SAME I
AGREE TO ABIDE BY THEM.
GENERAL RULES & DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS AND
CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER STANDARD
PROFORMA FOR TENDER OF AHMEDABAD MUNICIPAL CORPORATION OF
ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER .
CONTRACTOR MUST HAVE THIS DOCUMENT.
Dated Signature Of Contractor Dy. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
16 DECLARATION FORM :- TENDER No
Name of the work for which the Tender is under consideration-
PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR,
VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
1 I / We hereby declare that I / We have visited the above site & fully acquainted my self / our
selves with the local situation regarding materials, labour and other factors pertaining to the work
before submitting this tender.
2 I / We hereby declare that I / We have carefully studied
the conditions of contract, sections
and other tender documents of this work and agree to execute the same accordingly.
3 I / We hereby declare that I / We shall not charge any costs towards the visit of site for
preparing the tender for submission accordingly.
4 I / We hereby declare that My / Our near relatives are not working in A.M.C. as City
Engineer, Add. City Engineer, Dy. City Engineer, Asst. City Engineer, Assistant Engineer,
Add. Assistant Engineer, Technical Supervisor, Assistant Manager, Accountant, Store Keeper or
any such category. If yes, then, the names should be submitted.
Dated Signature Of Contractor
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL SPECIFICATION
1 The work shall be completed with in 12 months time limit.
2 The details of reinforcement of R.C.C. work shall be as per design and instruction of Add. City
Engineer or his representative and his order will be considered final. The contractor shall
have to maintain account of steel, cement and other materials, that may be brought by him on
site. This account shall be regularly maintained and kept open for inspection by municipal
staff. Watering of all the items shall be done as per instructions. Mixing of concrete shall
be done by concrete mixer machine.
3 Arrangements of bringing vibrator for R.C.C. works if required shall have to be made by the
contractor othervise concrete work shall not be allowed.
4 The contractor shall remain responsible for workman's compensation of any accident that may
occur. The contractor shall arrange for lights at night and fencing and security guard and
shall be responsible for any damage of life and property if any happen, during the execution of
work in case of dispute for unseen or over looked items, the decision of the Add. City Engineer or
his representative shall be final. The contractor shall have to clean all rubbish on completion of
work and hand over the building with final finishing as directed. All the rejected materials shall
be removed from site with in 24 hours by contractor at his risk and cost.
5 For mixing mortar either for masonry or for plaster; or for any other purpose contractor shall
have to prepare trough of bigger size and mix the mortar in the required proportion in
case he shall be allowed to mix the mortar either on solid floor or any finish surfaces.
6 The contractor shall have to make his own arrangement for water required for the work
7 If any extra item crops up during the progress of work, the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add. City Engineer or his
representative as per the rate analysis based on current market rates and as per prevailing
circular of AMC..
8 If in the interest of the Corporation it is necessary to change either any site or the design of the
proposed work, the contractor shall carry out the same at his quoted rates without charging any
extra and the contractor will have to carry out the works and he will be paid at the rates quoted
by him in the tender and no claim for extra charges entertained.
9 The cubical contents of the cement bag shall be taken as 1.25 cft. or 0.035 cmt. / bag and the
contractor shall have to prepare the measure box according to this measures.
10 Retention money at the rate of 2% shall be deducted from every running bill of the contractor
and which will be paid at the time of final bill.
11 Contractor will be fully responsible for compliance of the various provision under contract
Act. 1970 and rules framed there under.
12 The tender for the work shall remain valid for a period of 120 days from the date of
opening of the tenders for this work and that the Tenderer shall not be allowed to withdraw
or modify the offer on his own during this period. If any Tenderer withdraws or makes any,
modifications or additions in the terms and conditions of tender. His tender will not be
acceptable to the Municipal Corporation. The Municipal Corporation ,without prejudice to any
right or remedy be at liberty to forfeit the Earnest Money Deposit.
13 No Materials shall be supplied by A.M.C. The contractor have to make their own
arrangement for procurement of materials from open market. But the contractor shall
have to give necessary test certificates for different materials as per relevant I.S. code
before using the same in the work at his cost in presence of AMC Engineers..
14 As per circular No MGR 2176(96),2418 (ii)GHH dated 31-3-77 issued by Government of Gujarat
contractors are requested to procure their quarry materials required for construction work
through legal sources i.e. Only from the quarry lease. holders permit holder or middleman who
satisfies the contractor as the legality of the source of purchase by him on these materials.
15 If the work is not carried out within the specified time limit12 months from the date
order to start the work. Penalty shall be recovered at the rate of 10% on the amount of the
non completion of the remaining work for delay in allotted,/ extended time limit and shall be
recovered from the immediate bills payable to the Contractor.
16 The contractor shall have to take labour License of the work as per Labour act. The
contractor shall have to follow Child Labour act. The Tenders are to be submitted in
duplicate except E-Tender without which the tenders are liable to be rejected. Conditional tender
will not be accepted.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
TECHNICAL SPECIFICATIONS FOR MATERIALS AND ITEMS
NAME OF WORK -- Tender No.
PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR,
VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
GENERAL AND STANDARD TECHNICAL SPECIFICATIONS FOR WORK.
1 In the specifications “as directed” / “ approved shall be taken to means "'directed” / “approved”
by the Engineer-in-charge.
2 Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same inforce on the date of agreement.
3 In“Mode of Measurement”in the specification wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points or aspects in
the relevant Indian Standards shall be referred to.
4 All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height) 0.01 meter.
(ii) Areas 0.01 Sq. Mt.
(iii) Cubic Contents 0.01 Cu. Mt.
In recording dimensions of work, the sequence of length, width, and height (depth) or
thickness shall be followed.
5 The distance which constitutes lead shall be determined along the shortest practical route and
note necessarily the route actually taken. The decision of the Engineer-in-charge
in this regard shall be taken as final.
6 Where no lead is specific, it shall mean “all leads".
7 Lift shall be measured from plinth level.
8 Up to “floor two level” means actual height of floor (Maxi. 4 M) up to 3 Mt. Above plinth level.
9 Definite particulars covered in the items of work, though not mentioned or included in it
specifications shall be deemed to be included therein.
10 Reference to specifications of Materials as made in the detailed specification of the items of
works is in the form of a designation containing them number of the specification of the
Materials and prefix ‘M’ e.g. "M-5"
11 Approval to the samples of various Materials given by the Engineer in charge shall not absolve
the contractor from the responsibility of replacing defective Materials brought on site or
Materials used in the work found defective at later date. The contractor shall have no claim to
any payment or compensation whatsoever on accounts any such Materials being rejected by
the Engineer-in-charge.
12 The contract rate of the item of work shall be for the work completed in all aspects.
13 No collection of Materials shall be made on site before it is got approved from the
Engineer-in-charge.
14 Collection of approved Materials shall be done at site of work in a systematic manner. Materials
shall be stored in such manner as to prevent damage ,deterioration of intrusion of foreign
matter and to ensure the preservation of their quality and fitness for the work.
15 Materials , if and when rejected by the Engineer - in - charge, shall be immediately removed
from the site of work.
16 No Materials shall be stored prior to, during and after execution of a structure in such a way as
to cause or lead to damage or overloading of the various components of the structure.
17 All works shall be carried out in a workman like manner as per the best techniques for the
particular item.
18 All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the work during execution shall kept in sufficient
numbers and in good working condition on the site of the work.
19 The mode, procedure and manner of execution shall be such that it does not cause damage
or overloading of the various components of the structure during execution or after completion of
20 Special modes of construction not adopted in general Engineering practice, if proposed
to be adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy
construction and completion of work to the required strength and quality. Acceptance of the
same by the Engineer- in- charge shall not, however, absolve the contractor of the responsibility
of any adverse effects and consequence of adopting here in the course of execution or
completion of the work.
21 All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
22 The contractor shall be responsible for observing the rules and regulations imposed under
the “ Minor Minerals Act ”, and such other laws and rules prescribed by Government
from time to time.
23 All necessary safety measures and precautions (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, Materials and machinery
on the works as also of the work itself.
24 The testing charges of all Materials shall be borne by the Contractor.
25 Approval to any of the executed items for the work does not in any way relieve the
contractor of his responsibility for the correctness, soundness and strength of the structure
as per the drawings and specifications.
26 I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATION FOR THE ITEMS AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND AGREE TO
ABIDE BY THEM. (ALSO AVAILABLE ON AMC WEB SITE)
27 IN CASE OF WHERE THERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER IN CHARGE SHALL BE
FOLLOWED. AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
SUMMARY OF COST AND
SCHEDULE OF QUANTITIES AND RATES
_ SUMMARY OF COST AND RECAPITULATION SHEET
_ SCHEDULE OF QUANTITIES & RATES
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
1 The schedule of quantities and rates are to be read for the purpose of pricing in conjunction
with instructions to tenderers, technical specifications, drawings and general conditions of
contract for civil works.
2 The Price quoted in the summary of costs; sheet of schedule of quantities and rates shall be
in all inclusive value for the work described including all costs and expenses which may be
required in and for the execution of the work described together with all general risks, liabilities
and obligations set forth or implied in the document on which the tender is based.
3 The quantities furnished are approximate. In the event of actual quantities varying from those
furnished herein below or items deleted or added, the Rates quoted for the entire work shall
remain firm and no extra claims in this respect will be entertained. The payment shall be
made based on the actual quantities in the completed work.
4 All works shall be carried out strictly as per detailed specifications whether actually specified
or not. If not specified, as per directions of Engineer in charge
5 Rates quoted by Tenderer shall be firm even if the contract is split. If tenderer does not agree to
keep his quoted Rates valid under such a condition he shall clearly state so in his bid.
6 Rates and the total amount entered in the summary of cost sheet of schedule of
6 Rates and the total amount entered in the summary of cost sheet of schedule of
quantities and rates shall be written in ink and shall be entered both in figures and words.
7 If Tenderer need any clarifications, they should obtain the same in writing from owner/
Engineer. No notice will be taken of any verbal discussion in such matter.
1 Rate and amount shall be written both in figures and words.
2 Refer Schedule of quantities for items of Works & Estimated Quantities.
3 Plans are available with Asst. City Engineer. Tenderers are instructed to see them
during office hours in his office before quoting tender.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL TENDER CONDITIONS
1 After sanctioning of tender, a work order will be issued to the contractor. In response contractor
shall have to arrange for Security Deposit within 10 days for works up to 10 lacks of tender
amount and 15 days for works above 10 lacks of tender amount. The time limit shall be counted
after 10 days for works up to 10 lacks of tender amount and 15 days for works above 10 lacks of
tender amount after issuance of work order. The contractor shall be fined 4% of interest per year
for delay in submission of S.D. and shall be deducted from contractor’s bill. Security Deposit of
5% of sanctioned tender amount shall be deposited by pay order / demand draft / cheque or Bank
Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract paper
2 In case of earnest money cheque bounce back, contractor’s tender shall treated as cancelled and
the contractor shall not be given any tender, offer, quotation work in AMC for one year.
3 Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which
tender to be accepted and awarded.
4 Specification of tender items shall be as per PWD manual in general / AMC’s norms and B-1 form
conditions shall be applicable. In case of controversy, Addl.C.E.’s decision shall be final.
5 If watering is not done as per norms/specifications or if debris is not removed within 24 hours,
then without notice, AMC shall have a right to execute that work at contractor’s risk and the
amount shall be recovered from the bill.
6 Contractor shall have to work in such a system that there shall be no damage to any service line
of electric, telephone, gas, any type of service cable, drainage or water lines etc. In case of
damage to service line, the contractor will be responsible for damage and shall have to
repair/reinstate the damaged existing services. The contractor shall have to safe guard the
labours against any accident or damage of lives or public property if any.. In case of police
complain, Contractor shall be held responsible for negligence. In case of soil/land collapse,
contractor shall be held responsible for not supporting the soil with shoring, strutting and
shuttering. Contractor shall safeguard the labour before allowing labour to enter in excavated pit
or other hazardous site. In case of accident to labours, contractor shall be held responsible for
police complain against him. AMC’s staff will not be responsible for any accident at the site of the
7 Contractor shall take insurance of his all labour and supervisory staff.
8 Only registered contractor shall quote the tender, if the contractor is registered with government
then they shall have to apply for registration in AMC within 180 days from the date of work order.
9 AMC’s general condition and Form-B-1 shall be binding to the contractor B-1 Form is put up on
AMC’s web site.
10 Payment of running bill, final bill shall be as per policy of AMC in force at time of payment.
11 Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
12 As per site conditions/requirement of site, there shall be increase or decrease in tender item
quantities. In such case contractor shall not have right to any price rise. In case of decrease in
any tender item quantity, contractor shall not ask for compensation.
13 If any construction material brought to site by contractor is not as per specification, or any inferior
quality material brought to site, then such rejected material shall be removed from the site within
24 hours, otherwise AMC can throw away such material at any place and recover the amount for
such removal work from contractor bill. In this case contractor shall not be entitled for
14 Cost of testing of material shall be borne by the contractor. He shall provide vehicle for taking
material / staff from site to testing laboratory / manufacturing site and contractor shall be bear the
cost of transportation of staff and material.
15 Contractor shall work as per labour Act. Contractor shall not be given any payment if labour act
rules are not followed or insurance of labour is not taken for work.
16 Contractor shall deposit the material on site in such a way that it should not become obstruction
to any one in any way.
17 All type of taxes(e.g. sales tax, surcharge, vat etc) to be borne by the contractor.
18 If asked by AMC Engineering staff, contractor shall take photograph of site of work / before start
of work, during work and after the completion of work, with digital camera and deposit to AMC
office or transfer photograph from camera to AMC computer. No additional cost shall be paid.
19 In case of cancellation / rejection of tender, contractor shall not be entitled for any compensation
20 In case of extra item, AMC circular no. 9 Dt.08.05.12 shall be follwed in general If item is not
available in SOR, then market rate shall be derived by the Eng. dept by rate analysis. Contractor
shall not ask for the rates as per his rate analysis. This should be clearly understood and taken in
to consideration while quoting the tender by the contractor.
21 During execution of work, contractor shall take safely measures like protection by ropes, drums,
danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement & instruction of
Egg.- in –charge. In case of accident due to lack of protection, contractor shall responsible for
police complains, compensation etc AMC staff shall not be held responsible for contractor’s
22 If instructed by AMC officials, contractor shall have to keep daily progress register and get it
signed by Ass. City Engineer. Contractor shall maintain record of daily No.of labours employed,
work done. If rectification work is not done by contractor within 24 days, the contractor shall be
finned Rs.250/- per day for delay & shall be recovered from the contractors bill.
23 Contractor shall not be entitled for any type of compensation or right for the cancellation of tender
or tender items by any means.
24 Deduction from bills shall be done as per rules prevailing or the rules which shall come in to force,
by State or Central Govt.
25 1% amount shall be deducted for labour welfare fund as per state Govt. order.
26 All the above conditions shall over rule the conditions given in Form B-1.
27 Specifications are placed on AMC website www.egovamc.com for tender items, PWD manuals
should be followed in general.
28 Contractor shall have to register the work as per labour act & as per building safely act, 1906 with,
Dy.Director building safety act., Shram Bhavan, 5th floor labour commissioner office, Khanpur,
29 In case, at the time of submitting tender copy in duplicate, if single copy of tender bid is quoted by
contractor then it shall be treated as cancelled at the time of opening ( except E-Tendering).
30 At the time quoting tender, if tender fee or EMD is not deposited then tender shall be treated as
cancelled at the time of opening of tender.
31 In case of the bank detail are not given then EMD return procedure shall be delayed.
32 In case of water pipe line work, If materials are not available from AMC central stores, then the
time limit delay of providing materials by central stored shall be given to the contractor.
33 In case of road grouting work tender, if at the time of resurfacing paver work, If paver gets
stucked in grouting work then contractor shall have to rectify the poor grouting work without any
34 Before quoting the tender contractor should know that, he has seen the site understood the item
of works, site conditions. He should be in a positions to provide labours at the time of festivals like
Holi, Diwali, Navratri, Marriage season, rainy season or any other time of the year Contractor
cannot say that he has no labours due to festivals.
35 Running bill amount should be restricted to 90% sanctioned tender amount and remaining 10%
amount shall be paid in final bill after completion of work..
I have read all above conditions carefully and ready to work as per above conditions.
Contractor’s Name and seal Add. City Engineer
Mobile No. EAST ZONE
Address Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
Of PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR,
Work VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
RECAPITULATION SHEET Months
Sr.No DESCRIPTION AMOUNT
MAIN ESTIMATED TENDER COST
C.F. THIS TOTAL FROM TENDER ABSTRACT SHEET --
AMOUNT ( A ) IN ₹.
(1) WRITE HOW MUCH PERCENTAGE HIGHER
OR LOWER IN FIGURES _______________ % LOWER / HIGHER
(Strikeout which ever is not applicable)
(2) WRITE HOW MUCH PERCENTAGE HIGHER or LOWER IN WORDS -
(Strikeout which ever is not applicable)
(3) AMOUNT ( B ) IN ₹.
TOTAL AMOUNT (C) IN
TOTAL AMOUNT (C) IN
IF PERCENTAGES QUOTED IS HIGHER THAN ADD AND SUM IT. ( i.e. C=A+B) OR IF
(4) WRITE TOTAL TENDER AMOUNT IN WORDS - ₹
Dated Signature Of Contractor Dy. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
PROVIDING & FIXING M.S SIGN BOARD AS DIRECTED AT, VIVEKA NAND NAGAR,
VINOBABHAVENAGAR RAMOL HATHIJAN WARD EAST ZONE. (arc)
sr DESCRIPTION QTY. RATE PER AMOUNT
Providing and fixing MS grill gate elevation element of
decorative pattern with MS channel flat medium grade
Ms pipe square or round bars with heanded bolts
nutsor by screw incl applying on coat zinc primer and
two coats of oil paint comp (The Item include
Supplying, cutting, fabaricating, transporting,
painting and erection of society board made up as
2 Vertical post of 3”x3” square pipe of 3 mm thick 3200.00 75.00 Kg
(height approx.20 ft), board from 20 guage sheet
with frame made up with 1”x1” or 1.5”x1.5” squre
pipe of 2 mm thick as shown in drawings. Rate
should also include the erection charges of board
with the help of labor or machinery whatever
required….as directed by Engg.in charge.)
Lettering and lettering charges and
3 printing Muni.corporation symbol with 84.00 2000.00 No
help or skilled artist including colour cost
Prismatic grad reflective sheeting with
super high performance durable micro
prismatic material confirming to type XI
4 as per ASTM-D 4956-09 & cutting 89.44 3600.00 Smt
pesting letter according to IRC Standard
in Singal language with micro prismatic
confirming to type XI
Excavation of pit of manually necessary
labour of size 0.6*0.6*0.6 m for as per above
MS Structure foundation of pole for any
size. The grade of concrete should be M20 the item
rate include carting, filling,
with available earth and should be proper
be level up to ngl,as directed by Engineer
Painting and lettering the board on both
side of MS sheet with a thickness of
mm gauge and letters by oil paint
6 confirming with 2 coats of red oxide and 60.00 3500.00 Smt
oil paint Item includes necessary staging
carting and transportation or as directed
by engineer in charge(app.rate)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TND-30 bord e-tender no 3-.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].