Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.2 LAccepted-AOC VILL RUNGTA COLLIRY P O RUNGTA COLLIRY DISTT SHAHDOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical NEAR BHARTIYA VIDYA MADIR CHURCHA DISTT KOREA CHHATTISGARH 497339 | CHURCHA | KOREA | CHHATTISGARH | 497339 | - | Rejected-Technical L4 | |
| 3 | Rejected-Technical AT PO CHURCHA DIST BAIKUNTHAPUR KOREA C G PIN 497335 | KOREA | CHHATTISGARH | 497335 | - | Rejected-Technical L2 | |
| 4 | Rejected-Technical | - | Rejected-Technical L3 |
Tender Value
Refer Docs
EMD Value
₹31,200
Closing Date
21 Nov 2022, 5:00 pmClosed
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 24 Nos. PCC ventilation stopping in 13 East Panel and 95L East Panel of East Block of Churcha Mine (RO).
2022_SECL_261210_1
SECL/BKP/SO(M)/22-23/CE/eT/46 Dt.03.11.2022
Open Tender
Civil Works - Others
Item Rate
365 days
East Block of Churcha Mine (RO)
Please refer Tender document
3 documents required · 3 mandatory
₹31,200
6 Jan 2023
4 Nov 2022
23 Nov 2022
5 Nov 2022
21 Nov 2022
5 Nov 2022
5 Nov 2022 - 14 Nov 2022
Amount
Item Description/ Heading (Work period - 365 days).
Groove cutting in roof / floor / side for Stopping & Manhole by using chisel & hammer in Coal (both sides and roof).
Groove cutting in roof / floor / side for Stopping & Manhole by using chisel & hammer in hard stone in floor.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).
12 mm cement plaster of mix : 1:6 (1 cement : 6 fine sand).
Loading of materials into tub at surface.
Unloading the materials at destination point in UG.
Lead for transportation of materials for every 15 mtrs. or part by head load up to 50.0 m.
Malma Cleaning/removal of debris from UG galleries & cleaning of belt roadway and stacking / loading within 50 m.
Total impact of GST for the purpose of CTC
SARVADEO YADAV
SUCHCHA SINGH
M/S D P LAHIRI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_270258.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .