Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹1.3 L
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R and B) Division, Navsari
MMGSY (Vanbandhu Kalyan Yojana - 2) (Earthen to Bitumen) : 2026 - 2027 Construction of Various Roads in Khergam Taluka District Navsari Package No.39 [Total 3 Roads & Km.3.95] [1] Achavani Bandhad Falia to Ruzavani Road. [2] Debarpada Gamtal to Gauri Road. [3] Bhairvi Mandir Falia to Dukan Falia to Primary School Road. Taluka : Khergam. District : Navsari.
335724
01 of 2026-27
Open
Civil Works - Roads
Works
Navsari
7 documents required · 7 mandatory
₹3,600
Executive Engineer, Panchayat (R and B) Division, Navsari
₹1.3 L
16 Aug 2026
16 Aug 2026
16 Aug 2026
24 Aug 2026
16 Aug 2026
Memorandum showing items of work to be carried out
Quantities Estimated Rates Total
estimated Amount
but may Item of work Unit according to
be more In words estimated
or less quantities
1 0.79 Hect. Clearing and Grubbing Road land including 34889.39 Rupees Thirty Hect.
uprooting rank vegetation, grass brushes,
shrubs, saplings and trees girth up to 300mm Eighty Nine
removal of stumps of trees cut earlier and and Paise
disposal of unserviceable materials By Thirty Nine
mechanical means in area of All type of
2 2912.00 Cu.mt. Earth work in cutting in all sorts of soil and 106.81 Rupees One Cu.mt.
soft murrum including conveying and putting Hundred Six
the stuff in spoil bank maintaining minimum Eighty One
distance of five meter between top edge of Only
cutting and top of spoil bank Earth to be
deposited in side shoulders. [For Road side
3 112.50 Rmt. Supplying fixing & joining reinforced concret 1968.38 Rupees One Rmt.
Heavy Duty Non Pressure Pipe carrying
indian railway standard with collars for Eight and Paise
culverts carring heavy traffic as per Indian Thirty Eight
railway standard specification including Only
setting and joining the pipe in cement mortar
1:2 watering or laying (to level and slope) of
I.S.class NP-3 600mm dia internal
4 1635.00 Cu.mt. Earthwork for Embankment for including 173.67 Rupees One Cu.mt.
breaking clods, dressing with all lead and lift Hundred
including watering rolling & consolidation of and Paise Sixty
subgrade in layers at O.M.C. to required dry Seven Only
density including filling the depression
which occurs during the process using power
roller 8T to 10T. From Borrow area with all
5 11850.00 Sq.mt. Scarifying Gavelled macadam or Bitumen 41.74 Rupees Forty Sq.mt.
macadam surface 6 cm to 10 cm depth One and Paise
including stacking useful materials on road Only
side and disposing of remaing stuff.
6 237.00 Cu.mt. Supplying, Stacking, Spreading & Rolling of 684.58 Rupees Six Cu.mt.
Hard Murrum on road side for hard side Hundred
shoulder of work as per specification and Paise Fifty
including filling the mesure boxes of Eight Only
standard size etc. complete.
7 1727.00 Cu.mt. Construction of Granular Sub Base by 674.13 Rupees Six Cu.mt.
providing coarse graded machine crushed B.
T. material satisfying MOST Specification of and Paise
Grading - I using 53 mm to 26.5 mm @ 35% Thirteen Only
(M.C. Metal), 26.5 mm to 4.75 mm @ 45%
(M.C. Metal), 2.36 mm below @ 20% (Stone
Dust) including spreading in uniform layer
with motor grader on prepared surface,
mixing by mix in place method with
rotavator at OMC and compacting with
vibratory roller to achieve the desired
density with C.B.R. > 30% etc. complete.
8 1609.00 Cu.mt. Providing, laying, spreading and compacting 747.09 Rupees Seven Cu.mt.
graded stone aggregate to Wet Mix Macadam Hundred Forty
specification including premixing the Paise Nine Only
Material with water at OMC in mechanical
mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with
paver in sub- base / base course on well
prepared surface and compacting with
vibratory roller to achieve the desired
9 14885.00 Sq.mt. Providing and applying evenly Priming Coat 97.58 Rupees Ninety Sq.mt.
with Emulsion Asphalt at the rate of 7.50 Kg. Paise Fifty
/ 10 Sq.mt. on road surface using Emulsion Eight Only
SS-1 (Hincol Made) pressure sprayer etc.
complete including the cost of Asphalt.
10 1228.00 M.Ton. Providing & laying 37.50 mm thick 3752.21 Rupees Three M.Ton.
Compacted Bituminous Macadam with using
RS1 Emulsion for tack coat at 2.50 Kg / 10 Fifty Two and
Sq.Mt. using stone aggregate as per gradation Paise Twenty
and asphalt grade VG-30 at 3.40 % by weight
of total mix hot laid process with drum mix
plant including consolidation with vibrating
roller including operating plant and
machinery cost of asphalt, fuel, oil, lubricant
and labour charges etc. complete.
11 401.90 M.Ton. Providing and laying Seal Coat with B.T. 4408.56 Rupees Four M.Ton.
aggregate as specified using aggregate at the
rate of 0.18 Cum. / 10 Sqm. and bitumen VG - and Paise Fifty
30 grade for mixing with aggregate at the Six Only
rate of 4.5% i.e. 45.00 Kg. / M.T. of total mix
including heating and mixing in hot / drum
mix plant and transporting and spreading the
same by paver finisher and consolidation
with vibratory roller including necessary
firewood, oil, lubricants, labour charges
using contractor's own hot / drum mix plant,
machineries and equipment, tools etc.
complete in accordance with the
requirement of specification.
12 14884.50 Sq.mt. Providing and laying Asphalt Painting on B.T. 46.63 Rupees Forty Sq.mt.
Surface with bitumen V.G. 30 at rate of 5 Kg. Six and Paise
/ 10 Sq.mt. including spreading stone dust on Only
painting surface at the rate of 0.03 Cu.mt. /
13 6.00 No. Providing and fixing ordinary Kilometer 704.33 Rupees Seven No.
Stone of precast C.C. 1:2:4 including Hundred Four
necessary reinforcement as per I.R.C. type Thirty Three
design in C.C. 1:4:8 including lettering and Only
painting etc. complete.
14 17.00 No. Providing and fixing Hectometer Stone as per 356.50 Rupees Three No.
I.R.C. type design including lettering and Hundred Fifty
painting etc. complete. (I) Fixing in C.C. Fifty Only
Rupees One Crore Twenty Four Lakhs Three Thousand Four Hundred Eighty Four and Paise Forty
Deputy Executive Engineer, Executive Engineer,
Panchayat ( R & B ) Sub Division, Panchayat ( R & B ) Division,
Chikhli. Navsari.
I / we am / are willing to carry out the work at ___________________________ % Above / Below percent (Should be
writing in figures & words) of the Estimated Rates mentioned above. Amount of my / our Tender works out as under :
* Estimated Amount * Estimated Amount
Put to Tender Rs. 12403484.48 Put to Tender Rs.
Deduct ______ % Below Rs. _________ Add________ % Above Rs. _________
Net Rs. _________ Total Rs. _________
Note 1. All works shall be carried out as per Public Works Department Handbook and other specifications of the Division or as
Note 2. All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
contractor under his signature.
Note 3. Rates quoted include clearance of site (Prior commencement of work and at its close) in all respects and hold good for work
under all conditions, site moisture, weather etc.
Note 4. To be continued on additional sheets, If found necessary.
Signature of the Contractor Signature of the Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4. SBD - MMGSY (VKY-2) Er to Bt - Package No.39 - 3 Rd.pdf
6. All G.R.pdf
8. Schedule B - MMGSY (VKY-2) Er to Bt - Package No.39 - 3 Rd.pdf
9.2 Specification - MMGSY (VKY-2) Er to Bt - Package No.39 - 3 Rd.pdf
11. Drawing - MMGSY (VKY-2) Er to Bt - Package No.39 - 3 Rd.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .