Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | +10.00% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.0 L+₹10,784.78 (1.82%)Admitted-Finance | +12.00% | ₹6.0 L+₹10,784.78 (1.82%) | L2 | Admitted-Finance |
| 3 | L3₹6.2 L+₹26,961.94 (4.55%)Admitted-Finance SNEHASISH GHOSH DEBIANA NIRSA DHANBAD 828205 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828205 | +15.00% | ₹6.2 L+₹26,961.94 (4.55%) | L3 | Admitted-Finance |
Tender Value
₹5.4 L
EMD Value
₹6,800
Closing Date
8 Jun 2026, 5:00 pmClosed
GM, MUGMA AREA.
OFFICE OF THE GENERAL MANAGER, MUGMA AREA.
Construction of Air crossing /foot bridge at - 3E/L12 Junction in M.S. Seam Haulage Line of Lakhimata Colliery.
2026_ECL_360284_1
ECL/GM/MA/SRV/26-27/1334/E-03 Dt.25.05.2026
Open Tender
Civil Works - Others
Percentage
60 days
ECL, MUGMA AREA.
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,800
24 Jun 2026
28 May 2026
10 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
29 May 2026 - 5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Description: | - | - | - | - |
| 2 | Cutting in stone by electrical & pnuemetric drilling blasting & Mucking manually for Air crossing. | 88.57 | cum | 2,518.68 | ₹2,23,079.49 |
| 3 | Complete Roof bolting for roof support. | 40 | Nos | 180 | ₹7,200 |
| 4 | Cutting in stone by hand air crossing bottom wall. | 1.56 | cum | 3,783.38 | ₹5,902.07 |
| 5 | 1st class brick work 1:6 Air crossing Bottom = 10.12 m3 Air crossing top = 5.37 m3 | 15.49 | cum | 5,265.59 | ₹81,563.99 |
| 6 | P/L R.C.C work (1:2:4) a) Roof = 2.10 m3 b) Beam = 1.12 m3 c) Stair case = 1.62 m3 2 Beam | 5.53 | cum | 6,046.76 | ₹33,438.58 |
| 7 | P.C.C. steps work 1:2:4 | 0.93 | cum | 6,046.76 | ₹5,623.49 |
| 8 | Provided M/S Reinforcement for R.C.C work (10 mm Rod) same as item No (a.b.c) 2.10 + 1.12 + 1.62 = 4.84 m3 @ 90 Kg/m3 435.60 Kg. Provided m?S reinforcement for R.C.C work (16 mm Rod) for Beam i) (5.00 x 4) x2 = 40.0 m ii) (4.60x4)x2 = 36.80 m Total = 76.80 mt @ 1.58 kg/mt = 121.34 Kg | 556.94 | kg | 44.17 | ₹24,600.04 |
| 9 | Centering and Shuttering for R.C.C work | 43 | sqm | 705.92 | ₹30,354.56 |
| 10 | 12 mm Cement plaster 1:6 | 97.96 | sqm | 385.82 | ₹37,794.93 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_373149.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .