Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹73,711.09Admitted-Fee/PreQual/Technical/Finance | -29.99% | ₹73,711.09 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹78,964.89+₹5,253.80 (7.13%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹78,964.89+₹5,253.80 (7.13%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹98,432.37+₹24,721.28 (33.5%)Admitted-Fee/PreQual/Technical/Finance | -6.51% | ₹98,432.37+₹24,721.28 (33.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 L
EMD Value
₹2,100
Closing Date
10 Aug 2026, 6:00 pmClosed
Executive Engineer I and FC Div Bla
Executive Engineer I and FC Div Bla
Raising of Existing Crate work b.w.o R/R Masonary wall near house of Arshid Ahmad Tanga and Others on Sangri Nallah.
2026_IFC_316368_13
e-Nit No.03 of 2026-27
Open Tender
Civil Works
Percentage
7 days
Baramulla
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Chief Engineer Kmr, I and FC Deptt. Srinagar
₹2,100
18 Aug 2026
16 Jul 2026
11 Aug 2026
16 Jul 2026
10 Aug 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 15.36 | Sqm | 24.12 | ₹370.48 |
| 2 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) | 11.52 | Cum | 7,677.35 | ₹88,443.07 |
| 3 | .Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 6.4 | sqm | 346.7 | ₹2,218.88 |
| 4 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand)
Flush/Ruled Pointing | 15.36 | Sqm | 297 | ₹4,561.92 |
| 5Carriage of material by Mechanical Transport including loading, unloading and stacking up to site of work. | |||||
| 5.1 | Quarry Stones for an average lead of 06 km. | 11.52 | cum | 254.59 | ₹2,932.88 |
| 5.2 | Sand Avg. lead 8 km | 4.63 | Cum | 247.72 | ₹1,146.94 |
| 5.3 | Cement for avg. lead 5 km | 1.14 | MT | 178.43 | ₹203.41 |
| 6Carriage of material 1.2 By Manual Labour including loading, unloading and stacking for lead 150 mtrs | |||||
| 6.1 | Quarry Stones | 11.52 | cum | 338.88 | ₹3,903.9 |
stage.html
html • 0.02 MB
finance_1031470.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1031470.xls
BOQ • 0.27 MB
corrigendumI.pdf
PDF • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .