Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹4,654
Closing Date
7 Oct 2026, 11:00 am7d left
The Assistant Engineer
The Assistant Engineer, LSGD Section, Karalam Grama Panchayat
CONSTRUCTION OF WELL
2026_LSGD_874192_1
T1/AE/LIDEW/KRLM/2026-27
Open Tender
Civil Works - Roads
Item Rate
240 days
KARALAM GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,654
Yes
29 Sept 2026
29 Sept 2026
8 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1consruction of well | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 53.55 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 117.13 | cum | - | - |
| 1.003 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 7.69 | cum | - | - |
| 1.004 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 128.11 | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 269.04 | kilogram | - | - |
| 1.006 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 13.67 | cum | - | - |
| 1.007 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 7.91 | sqm | - | - |
| 1.008 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 12.6 | kg | - | - |
| 1.009 | OD114650/2026-2027:Filling with broken pieces of MP tiles/brick bats in the sides of the rings of the well | 1.71 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.24 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_1483337.xls
BOQ • 0.30 MB
pre.pdf
Tender Documents • 0.25 MB
sbd.pdf
Tender Documents • 1.83 MB
fot.pdf
Tender Documents • 0.24 MB
aff.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .