Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
30 Sept 2026, 6:00 pm3d left
Superintending Engineer Public Health Circle GWSSB, Ahmedabad
Providing Supplying Lowering Laying Fixing MS Pipeline and Replacement of old MS pipeline in WTP,Valve Galary at Kuvadara WTP,Providing and Installation of Pumping machinery of Kuvadara WTP and other repairing work Under M and R to SSW G3 RWSS Ta. Mansa District. Gandhinagar.
342941
11/2026-27
Open
Civil Works - Water Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹3,600
Executive Engineer, Public Health Works Division, GWSSB,Gandhinagar
₹1.3 L
9 Sept 2026
9 Sept 2026
9 Sept 2026
30 Sept 2026
9 Sept 2026
Estimated Cost:- Rs.
Gujarat Water Supply & Sewerage Board
VOLUME – III – PRICE BID
2.0 BID FORM (WITH PRICE)
SUMMARY OF - Grand Summary of Schedules (Covering
Schedule – A Nil
Schedule – B Providing Supplying Lowering Laying
Fixing MS Pipeline and Replacement of
old MS pipeline in WTP,Valve Galary at
Kuvadara WTP,Providing and Installation
of Pumping machinary of Kuvadara WTP
and other repairing work Under M & R to
SSW G3 RWSS Ta:- Mansa District:-
Schedule of Payment for Works
1. Name of work:- Providing Supplying Lowering Laying Fixing MS Pipeline and Replacement
of old MS pipeline in WTP,Valve Galary at Kuvadara WTP,Providing and Installation of
Pumping machinary of Kuvadara WTP and other repairing work Under M & R to SSW G3
RWSS Ta:- Mansa District:- Gandhinagar.The bidder shall quote his firm and fixed price
for the entire work under this Contract, defined in more details in various sections of this bid
2. The rates and prices shall be submitted in the electronic formats given by n-procure which
is called Schedule-B (Schedule B1, Schedule B2....,), rates and prices received in any
other formats will be rejected and the Bids will be disqualified.
3. It will be entirely at the discretion of the Employer to accept or reject the bidder’s proposal,
without giving any reasons whatsoever and the bidder shall not be permitted to withdraw
his bid on this account.
supplied from the by client.
5. In Schedule-B the Bidder shall quote prices for the items percentage rate as called for
against the BOQ item.
6. In Annexure-A the bidder has to Procure and must supply at site free of cost and has to
hand over to Engineer in-charge within one month from date of work order given as under.
B only will be considered for price evaluation & shall form a part of the Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and evaluation.
9. Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
10. Each item is to be individually priced online and the amounts shall be added up to arrive at
except where the item description requires the item to be priced on "as applicable” basis.
The item shall not be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item description is for
subject matter guidance only; clause references are indicative only and all other relevant
clauses shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the bidder shall be
deemed to have covered the cost of execution of such items (according to the requirements
of the bid document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for by the
Employer when executed and shall be deemed to be already covered by other items and
rates listed in the price sheets No extra payment shall be given for any item which is
required to complete and perform the project.
Schedule B-1 and Schedule-C of the successful bidder shall be corrected accordingly. Only
financial evaluation of the bid.
13. Schedule - D gives the basis of interim payment for construction of civil works.
14. The bidder shall be deemed to have allowed in his price for provision, maintenance and final
removal of all temporary works of whatsoever nature required for construction including
temporary bunds, diverting water, pumping, de-watering etc. for the proper execution of
works. The rates shall also be deemed to include any works and setting out that may be
required to be carried out for laying out of all the works involved.
15. Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to be
taken as mutually explanatory of one another.
17. The bidder shall interpret the data furnished and carry out any additional survey work, or
investigation work required at his own cost.
18. The prices quoted shall also include the cost of materials utilized for testing.
19. The bidder should acquaint himself with the site conditions including the access to Work site.
The successful bidder shall have to make suitable access to work sites at his own cost.
These accesses will be used by the other contractors working for GWSSB.
shall include all the equipments / materials / accessories and services required as per the
21. 1% of the value of work will be deducted from the Running bill against labour cess which is
non refundable.
22. Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the same
will be borne by GWSSB.
23. Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to misinformation
shall be recovered from the contractor.
24. The rates quoted shall be exclusive of GST, but inclusive of all other taxes, duties which shall
not be paid extra. While GST will be paid for admissible part of actual work done at the
approved tender rates and tender conditions of price variation. GST shall be paid as per
prevailing rates at the time of payment. The TDS shall be deducted at source as per provision
of IT rules and GWSSB policy.
25. The rates should be quoted exclusive of GST, but inclusive of all other taxes as per Volume-
1(B), General Conditions of Contract, Clause No-47.
26. The process requires that the bidder shall quote his price for the work components contained
entire period of performance of the contract except price variation allowed for supply of
MS/DI/PVC/HDPE pipe as per Volume-I(B), General Conditions of Contract.
27. Payment shall be made for the components for which lump sump prices are quoted, as per
the schedule of payment. Total cost will be worked out on the basis of work done of individual
items and rates quoted against those particular items only.
28. Agency shall have to take Insurance policy and intimate to GWSSB along with the evidence
within time limit. In case of non compliance entire responsibility shall be rest with the agency
and required amount shall be recovered from any due amount of the agency.
29. GWSSB can recover penalty amount from the agency for not taking the insurance. Though
the penalty amount is recovered, responsibility of the agency for taking insurance shall be
continued and will not be escaped from the responsibility.
30. The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be open for
the Board to ask for original invoices, lorry receipt, weigh bridge slips, payment details and
such other documents as may be required for the purpose.
The claim of contractor regarding GST shall have to be backed by documentary evidence
substantiating the actual payment of tax duly certified by the competent tax authority. The
final decision regarding the quantum of claim amount to be recovered or reimbursed shall be
of the competent authority of the GWSSB and shall be binding on the contractor.
31. The contractor shall dismantle and remove the existing MS Clariflocculator Bridge. All
dismantled materials shall be handed over to the department. No separate payment shall be
made for this work.
Signature of Contractor Executive Engineer,
PH Works Division
2. BID FORM (WITH PRICE)
Bidders are required to fill up all the blank spaces in this Bid Form.
SUB : Name of work:- Providing Supplying Lowering Laying Fixing MS Pipeline and Replacement
of old MS pipeline in WTP,Valve Galary at Kuvadara WTP,Providing and Installation of
Pumping machinary of Kuvadara WTP and other repairing work Under M & R to SSW G3
RWSS Ta:- Mansa District:- Gandhinagar.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda / Amendments to the above, for the execution of the above Contract, we
the undersigned offer to Design, Engineer, Procure, Construct, Complete, Commission,
operate, maintain and Run the whole of the said works for 6 (six) Months from the date of
commissioning including defects liability period as given in Conditions of Contract and in
conformity with the drawings, conditions of Contract, specifications, Preamble to Price
Nos.____________________ (insert numbers) for Lump sum fixed price of
for Construction including free trial run for One months or such other sum as may be
ascertained in accordance with the conditions.
2. I / We agree that
(a) If we fail to provide required facilities to the Employer’s representative or any other
person / Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
(b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver pure water of required quantity according to the conditions /
stipulations of the Contract, the Engineer will be at liberty to take any action including
termination of Contract and impose at his absolute discretion any penalties, and / or
reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract with in 6 Months, inclusive of monsoons, from the date or receipt of Letter of
Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the last date of submission of
bid and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance Security in the forms and of value
specified in the Clause 1 of Volume-IB, General Conditions of Contract.
7. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
NAME OF WORK:- Providing Supplying Lowering Laying Fixing MS Pipeline
and Replacement of old MS pipeline in WTP,Valve Galary at Kuvadara
WTP,Providing and Installation of Pumping machinary of Kuvadara WTP
and other repairing work Under M & R to SSW G3 RWSS Ta:- Mansa
District:- Gandhinagar.
Schedule showing the materials to be supplied to the contractor by GWSSB
from store specified below for the work Free of Cost.
Sr.No. Particulars Quantity in Mts. Rate Unit Place of Delivery
1. Contractor shall have to buy bring ordinary Portland cement as per IS-812/1989
and IS-12269/1987 or its latest revision with ISI mark and steel FE-415 as per
approved Board vendor list and produce the bill of purchase along with necessary
test certificate at the time of claiming running account bills. Cement shall be use
2. All materials except shown in schedule-A req. for the work shall be provided by
3. Cement to be brought and used by contractor as per approved board vendor list.
4. The Contractor shall arrange lifting & carting of materials from departmental store to
the site of work, which includes loading, unloading & proper stacking of materials.
5. Any materials required for item other than labour charges item in schedule-B and
materials not included in schedule-A but available with department will be issued on
request of the contractor at department issue rate/market rate which ever is more.
6. Water and electricity required for the construction and execution of works will be
arranged by the contractor at his own cost.
7. Contractor shall have to procure the all pipes, specials, joints, valves, water meter,
etc. from approved manufacturer or approved by Engineer in Charge.
8. Contractor shall have to read the tender in details & quote the rates accordingly
necessary all taxes admissible by Govt, shall be deducted from the bill.
Signature of Contractor Executive Engineer,
Public Health Works Division,
Name of Work :- Providing Supplying Lowering Laying Fixing MS Pipeline and Replacement of old MS
pipeline in WTP,Valve Galary at Kuvadara WTP,Providing and Installation of Pumping machinary of
Kuvadara WTP and other repairing work Under M & R to SSW G3 RWSS Ta:- Mansa District:- Gandhinagar.
Qty Unit Item Rate Per Amount
Providing , installing & comissioning Flash
mixer impeller with motor, gear
1.00 No. arrangement & electrical cable , 77371.00 No.
connections control panels etc. (size as
per design) 5hp
M.S.Bridge with Floculator & Scraper
Providing fabricating, fixing/installing &
commissioning clarifier M.s. BrIDGE WITH
27.00 rmt RAILS and wheels rotating arrengement incl. 27467.00 rmt
peripheral trolley , central bearing
etc.complete size as per design . Should be of
1.00 set Motors And Gearboxes : For clari Bridge 106385.00 set
Applting Anti corrosive chemical treatment
food grade for exposed surface of
42.60 sq.mt m.s.structure/ pipe grade for exposed 242.00 sq.mt
surfaces of m.s stuctures / pipe and smooth
and applying treatment in two coats.
P &L 24''*24'' vitrified 8 mm thick tile flooring
over 20 mm(average) base of cement mortar
1:6 (1 cement:6 coars sand) on new surface
1116.75 sq.mt or fixing on existing flooring and jointed with 1318.04 sq.mt
color cement slurry including finished with
flush pointing & cleaning the surface etc.
complete for light shade.
Providing and laying white glazed tiles 6mm
thick in skrting risers of steps and dedo on
732.00 Sqmt 10mm thick cement plaster 1:3 (1-cement : 3- 1116.32 Sqmt
coarse sand) and jointed with white cement
Providing and laying polished Kota stone slab
flooring over 20mm (Average) thick base of
cement mortar 1:6 (1-cement : 6-coarse sand)
392.00 Sqmt 1120.04 Sqmt
or L.M. 1.1.5 laid over and jointed with grey
cement slurry including rubbing and polishing
etc. complete. (B) 30 mm thick
Providing and laying broken chine mosaic
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
1368.41 sq.mt tempered to bring mortar crème out upto 771.98 sq.mt
surface using white cement including
rounding off junction and extending them upto
15 cm along the wall , cleaning with water and
oxalic acid etc. as directed.
Dismentling doors, windows, ventilators etc.
(wood or steel) shutters including chowkhats
50.00 NO. architraves, holdfasts and other attachment 261.29 NO.
etc. complete and stacking them within all
lead and lift.(ii) Exceeding 3 Sq.M. in area.
Providing and fixing 25 mm thick shutters for
cupboards etc . Including black enamelled
2.10 sq.mt M.S. butt hinges with necessary screws 2900.79 sq.mt
.(A)Indian teak Wood (iii) partly panelled and
Providing and fixing FRP frame size 125x65
mm and 35mm thick FRP shutter having extra
reinforcement on sides & edges in polish
finish. The core of the shutter & frame is to be
filed up with injected polyurethene foam done
in situ alongwith embedded wooden pieces
19.73 Sq.mt for stiffening & also taking hinges & fintures. 2589.15 Sq.mt
The whole FRP frame & shutter is to be water
proof weather proof, termite proof &
resistance to mild acid/alkali. Rates are to be
inclusive of S.S hinges with necessary screws
& alluminium S.S fixtures & fastenings &
fastener sleeve.
Providing and laying chequered terrazo tiles
22mm thick with marble chips of sizes upto
6mm in floors on 25mm thick bed of Lime
mortar 1:1.5 (1-Lime putty : 1.5 coarse sand)
192 Sqmt or C.M. 1:6 (1 - cement : 6 - coarse sand) 856.64 Sqmt
jointed with neat cement slurry mixed with
pigment to match the shade of the tiles
including rubbing and polishing complete. (B)
Dark shades using ordinary cement
Providing and fixing window having extruded
aluminum Colour anodized section frame
main outer size 63.50 x 38.10 x 1.95 mm,@
Wt 1.094 Kg / Rmt, horizontal two track
member size 61.85 mm x 31.75 mm x
1.20mm @ wt.of 0.695 Kg/mt, vertical
member of size 61.85 mm x 31.75mm x
mm @ wt.of 0.659 Kg/mt with sliding shutters
75.00 Sq.mt of horizontal member size 40mm x 18mm x 1696.73 Sq.mt
1.29mm @ wt.of 0.456Kg/mt, vertical member
of size 40mm x 18mm x 1.29mm @ wt.of
0.456Kg/mt, @ Wt. 0.457 Kg/mt with 5 mm
thick transparent bronze colour tinted float
glass with powder coated aluminum fittings
and fixtures and transparent silicon sealant
glass fixing to frame as per details etc
complete for window.
Removing and scraping of old deteriorated
plaster of any thickness fromm wall / R.C.C
5347.37 sq.mt member including stacking of serviceable 20.35 Sq.mt
material and disposal of unserviceable from
site of work with all lead and lift
Cement Plaster 20 mm thick in c.m. 1:2 using
5347.37 sq.mt water proofing compound of approved 202.00 sq.mt
quantity including finishing etc. complete.
Dismentling steel work including distempering
1988.00 KG and stacking the materials with all lead and 3.81 KG
Providing and fixing 25 mm x 5.2 mm MS
railing with three horizontal rows and posts of
angles iron of size 65 mm x 65 mm x 8 mm
RCC 150 mm and 1.15 meter height and
placed at 1.85 mt c/c including painting two
coats and anchorage in cc etc complete
Providing and fixing 0.50 mt height Y- shape
M.S. angle post 40mm x 40mm x 6mm and oil
painting 3 coats fixed at 2.5 mt c/c with fove
700.00 Rmt horizontal line and two diagonal of galvanised 388.05 Rmt
steel barbed wire wt. 9.38 Kg.per 100 mts.
Strained and fixed to post with G.I. staples
incl. fixing the post on top of the wall.
Steel work, welded in built up sections framed
work including cutting, hoisting, fixing in
position and applying a priming coat of red
52.49 Quintal 8750.00 Quintal
lead paint. (A)In beams and joists, channels
angles Tees, flats, with connecting plates or
angle cleats as in main and cross beams. Hip
and jack rafters, purlins conneted to common
rafters and the like
RCC circuler spiral staircase with central
circular in M-20 as per design including M.S.
reinfrocement , centering , suttering , form
50.00 Step work , scaffolding , finishing and curing 1000.00 Step
including providing and fixing balusters of
m (work below G.L. for column and footing will
be paid extra )for 1m radius and 20 cms rise.
Laboratory Instruments (a) Digital PH meter
1 NO. Providing and supplying micriprocessor based 7217.00 NO.
digital pocket PH tester.
(b)Digital TDS meter Providing and supplying
1 NO. micriprocessor based digital pocket TDS 7506.00 NO.
(c) Fluoride Test Kit (Digital ) Providing and
supplying fluoride spot test kit.
Supply of V-wire under drain system for RSF
beds made from made from stainless steel
screen with base pipe of HDPE pipes with
other accessories for one bed having two
compartment & size of each bed is 6 m x 4 m
96.00 sq.mt . The system shall consist of required length 31275.00 sq.mt
of laterals , each having MOC SS 304 with
300 micron slot screen based on 3" HDPE
pipe . The air distribution shall be done
uniformly and shall cover all laterals
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
240.00 cu.m materials and disposing off the excavated 155.60 cu.m
stuff upto 50 Meter lead.(B) Dense or Hard
Providing and casting in situ mass cement
concrete in grade M-10 (approx. corresp. To
240.00 cu.m prop. 1:3:6) using granite trap metal of size 12 3393.00 cu.m
mm to 25 mm incl. consolidation curing etc.
Providing and fixing pre-cast concrete kerb
stone of gray cement based concrete block
30cm length,30cm height and 15cm thick of
140.00 Sq.mt M250 grade concret as per approved design 371.21 Sq.mt
and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.
Providing and fixing pre-cast Rubber Dye /
steel Dye inter locking concrete block 60mm
thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as
1200.00 Sq.mt per approved design Confirming to IS 15658 : 699.90 Sq.mt
2006 including 35 mm Sand layer for levelling
and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-
2018 etc. Complete.
Excavation for foundaion upto 1.5 mt. depth
incl. sorting out and stacking of useful
materials and disposing off the excavated
stuff upto 50 mt. head. Loose or soft soil
Providing and laying cement concrete 1:4:8
(1-Cement : 4- coarse sand : 8- hand broken
60.00 Cum stone aggregates 40 mm nominal size) and 2732.02 Cum
curing complete excluding cost of formwork in
(A) Foundation and Plinth
Providing H.Y.S.D. Bar reinforcement for
R.C.C. work including bending, binding and
placing in position complete upto floor two
Providing and laying cement concrete work
1:2:4 (1-Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and
60.00 Cum curing complete excluding cost of formwork 4101.80 Cum
and reinforcement for reinforced concrete
work in (D) Columns, Pillars posts and struts
upto floor two level.
Brick work using common burnt clay building
brick having crushing strength not less than
35 Kg/cm2 in foundation and plinth in cm 1:6(
1 cement: 6 fine sand)
Providing 15 mm thick cement plaster in
single coat on brick / concrete work for interior
80.00 Sqmt 183.57 Sqmt
plaster upto floor two levels and finish even
and smooth in cement mortar 1:3
Finishing wall with water proofing cement
paint of on wall surface (two coat) to give an
approved brand and manufacture and
80.00 Sqmt required shape even shade after throughly 59.71 Sqmt
brushing the surface to remove all dirt and
remains of loose powered materials
Supplying & erecting Galvanized M.S pipe
post "B" class 88.9 mm O.D 6 mtr. Long duly
painted with two coats of aluminium paint
8 EACH. 4397.00 each
complete with metallic base-plate of 300 mm x
300 mm x 4mm thick for using as a compound
light pole with appгох. weight 47 Kg.
Point wiring for independent PLUG with
following size mains earth wire of 1.5 sq.mm
(green) both are of ISI marked 1.1 KV grade
FRLS PVC insulated multi strand copper
wires upto 10 mt length, in following below of
pipe erected complete with ISI marked 3/5 Pin
35 point socket and tissino type switch erected with 310.00 point
earth continuity connection erected on Metal/
PVC/Wooden box covered with 3 mm thick
PC(Polycarbonate) /Acrylic/Laminated sheet
(A)with medium class Rigid PVC pipe and
accessories erected flushed on wall/ceiling
providing and erecting Halogen tube
43 EACH. 137 Each.
Watt./1000 Watt.(cat.3)
(Rupees One Crore Twenty six lacs Sixty seven thousand Four hundred Fifty Seven and
twenty paisa only)
I/We am/are willing to carry out the work at ______ %
above / below _____
Percent (should be written in figures and words )
Below/above the tendered rate
mentioned at above amount of my /our tender comes as
Estimated Amount put to Estimated Amount put to
Tender Rs. ______________ Tender Rs. __________
Deduct Rs. Add. Rs.
Net Rs. Total Rs.
In words. In words.
Executive Engineer
SIGNATURE OF CONTRACTOR P.H.Works Division
LIST FOR EQUIPMENTS/INSTRUMENTS REQUIRED FOR OFFICE WORK.
Agency has to Procure and must supply at site free of cost and has to hand over
to Engineer in-charge Within one month from date of work order given as under.
No Description Nos. Of
One Laptop not less than 15 inch Display, core i5, 1.0No
10thGeneration, 8 GB RAM, 512 GB SSD, with windows
andoffice2019bothpreinstalledfrombrandDELL,HP,Lenovo
asapproved by Engineer in-Charge
Multifunction Printer cum scanner with 28 PPM speed 1.0 No
2 from brand like Canon, HP or equivalent with all necessary
accessories etc. complete.
Note:- all above item must be provided by Agency at free of cost.
Signature of Contractor Executive Engineer
P H Works Division
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the total
costs of the concerned item as whole. A head titled (any other item(s)) is included in each
breakdown of schedule and the tenderer shall at the time of tendering indicate any additional
items which he considers necessary but cannot be covered by any of the heads indicated in
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’ s scheme and design and he should take this into account while quoting his lump
sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in
the measurement books in the form and by the method approved by the Employer's
Representative, and signed jointly by both the parties.
BREAK UP FOR INTERIM PAYMENTS
Percentage Payment to be
Item Description of Items
1 All Mechanical – Electrical Equipment & all civil
work shall have following three stages of payment
viz. On completion of Supply, on completion of
Erection / Installation & on completion of Testing &
Commissioning as per weight age specified above.
a On Supply of Equipment at Site 75 % of Weight age (Amount)
b After Installation / Erection of Equipment 15 % of Weight age (Amount)
c After Successful Testing & Commissioning of 10 % of Weight age (Amount)
Equipment (On Completion of Stipulated Trial
Executive Engineer
P H Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Vol 1A Technical Bid.pdf
VOL 1B GCC.pdf
Vol II specification.pdf
VOL III Price Bid.pdf
Annexure_1 DMO 2941 01- Apr-2026_744.pdf
Annexure 2 Purchase Policy.pdf
Ann 3 shramyogi GR.pdf
Ann 4 Royalty GR .pdf
Ann 5 DOC-20230131-WA0039 240625 162832.pdf
Annexure 6 Vigilance_ Insurance Dt 19 03 12 GR .pdf
Annexure 7 Min labour wages.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .