Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹1.8 Cr+₹2,856.26 (0.02%)Rejected-Finance | ₹1.8 Cr+₹2,856.26 (0.02%) | L2 | Rejected-Finance DISQUALIFIED |
| 3 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| 4 | Rejected-Technical LINE JEEVANGARH AMBARI DISTT DEHRADUN | - | - | Rejected-Technical DISQUALIFIED |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹1.8 Cr
EMD Value
₹4.2 L
Closing Date
13 Feb 2024, 5:00 pmClosed
SANJAY RAJ
Office of Superintending Engineer Irrigation Works Circle, Uttarkashi
Flood Protection Work in Kumola khadd of Block Purola in Distt- Uttarkashi Under SDMF .Reach Right Bank of Kumola khad between Km 0.00 to 0.800 Km and Left Bank 0.00 to 0.050 Km. (Job -1)
2024_IRDCE_68586_1
11/SE/2023-24
Open Tender
Civil Works
Item Rate
180 days
PUROLA
AS PER STANDARD BIDDING DOCUMENT
4 documents required · 4 mandatory
₹5,900
Executive Engineer Irrigation Division
₹4.2 L
Office of Superintending Engineer Irrigation Works
16 Mar 2024
31 Jan 2024
14 Feb 2024
31 Jan 2024
13 Feb 2024
1 Feb 2024
3 Feb 2024
Amount
E/w in Excavation in all types of soils and rocks including lead, lift and disposal of surplus material required for proper completion of work.
Nominal mix CC 1:3.6 including supply of all material, labour, T&P etc. required for proper completion of the work.
Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.
RR Stone Masonry laid in dry including supply of all material, labour, T&P etc. Required for proper completion of work.
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
H.P.S.Filling/Back filling behind R/w & B/W. including supply of all material, labour, T&P etc. required for proper completion of the work.
JABAR SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .