| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC ADMITTED | |
| 2 | L2₹4.7 LSame as L1Rejected-AOC | L2 | Rejected-AOC REJECTED |
Tender Value
₹4.2 L
EMD Value
₹10,580
Closing Date
3 Feb 2024, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
OFFICE OF ASSISTANT EXECUTIVE ENGINEER LID EW AZHUTHA BLOCK PANCHAYAT
Annual Plan-SCP 2023-24-274 CONSTRUCTION OF POND IN MANCHUMALA THAVAARANA OF VANDIPERIYAR PANCHAYATH-General Civil Work
2024_LSGD_650111_5
ET 35-BP/2023-24/AE/LID EW/AZHUTHA
Open Tender
Civil Works - Others
Item Rate
120 days
AZHUTHA
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,580
Yes
19 Mar 2024
27 Jan 2024
5 Feb 2024
27 Jan 2024
3 Feb 2024
27 Jan 2024
Amount
CONSTRUCTION OF POND IN MANCHUMALA THAVAARANA
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting)
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD184336/2023-2024:Providing and Fixing of good quality granite name board with lettering including of all cost,conveyance,labour charges etc complete
VARGHESE SELVARAJ
Bidder Name
Vinod.S
VARGHESE SELVARAJ
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .