Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-Finance | ₹17.5 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹18.7 L+₹1.2 L (6.92%)Accepted-Finance | ₹18.7 L+₹1.2 L (6.92%) | L2 | Accepted-Finance ACCEPT |
| 3 | L3₹18.9 L+₹1.4 L (7.74%)Accepted-Finance | ₹18.9 L+₹1.4 L (7.74%) | L3 | Accepted-Finance ACCEPT |
| 4 | L4₹22.2 L+₹4.7 L (27.1%)Accepted-Finance | ₹22.2 L+₹4.7 L (27.1%) | L4 | Accepted-Finance ACCEPT |
Tender Value
₹30.1 L
EMD Value
₹60,200
Closing Date
5 May 2026, 4:00 pmClosed
Executive Engineer I and FC Divsion Nowshera
Executive Engineer I and FC Divsion Nowshera
Construction of Flood Protection Work (Crates) at Left/Right banks along Niari Tawi, Mogla Tawi in Kalakote region.
2026_IFC_308718_3
e-NIT NO. 01 OF 2026-27
Open Tender
Civil Works
Percentage
45 days
Kalakote
As per NIT
4 documents required · 4 mandatory
₹1,500
Executive Engineer I and FC Divsion Nowshera
₹60,200
11 Jun 2026
27 Apr 2026
6 May 2026
27 Apr 2026
5 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 433.35 | cum | 187.3 | ₹81,166.46 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 1,350 | cum | 371.15 | ₹5,01,052.5 |
| 3 | Dumping stone excluding cost of stones in Horizontal on level | 9.6 | cum | 237.9 | ₹2,283.84 |
| 4 | Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates | 135 | cum | 81.4 | ₹10,989 |
| 5 | Supply of Stones | 1,155.66 | cum | 700 | ₹8,08,962 |
| 6 | Carriage of material av. 20 Km by M.T and 250 m by H.L | 1,155.66 | cum | 923.99 | ₹10,67,818.28 |
| 7 | Cost of K-wired crates of size (6m x 1.5m x 1.5m) with end lids. | 100 | No. | 5,000 | ₹5,00,000 |
| 8 | Carriage of crates from the store by avg distance of 180km by MT and 500m by HL to the actual site of work. (Avg. Weight of the crate is taken as 63 kg) i.e. calculations is as (no. of crates x weight of crate / 1000 ) x carriage rate | 6.3 | M T | 6,141.96 | ₹38,694.35 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1000160.xls
BOQ • 0.30 MB
Corrigendumcorrectionforcardrenewal.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .