Loading…
Loading…
Tender Value
₹87.7 L
EMD Value
₹1.8 L
Closing Date
27 Jul 2026, 12:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
S AND T
17 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Client certificate from other than Govt Organization should be duly supported by Form 16A/26AS generated through TRACES of Income Tax Department of India. Note: The balance sheet and all financial documents attested/certified by the Chartered Accountant (CA) to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN, Falling which the offer shall be considered as incomplete and will be Summarily rejected without any further reference
(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
(b) (i) In case of composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender,or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender,or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note b(i): Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria.
(b)(ii) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.
(b) (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tenderdocuments for evaluation of technical eligibility, shall be considered. The scope of work covered in otherremaining components shall be either executed by tenderer himself if he has work experience asmentioned in clause 7 (a) (ii) of Part-II of GCC or through subcontractor fulfilling the requirements as perclause 7 of Part-II of GCC or jointly i.e., partly himself and remaining through subcontractor, with priorapproval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of Part-II of GCC, with prior approval of Chief Engineer in writing.
Similar Nature of Work: Any work involving Outdoor or Indoor signalling work. Signalling Work:- All work which are directly related to the interlocking of the Core Signaling System. OR Any MACLS work involving outdoor & indoor work or alteration in existing Indoor/outdoor signaling system OR Any work involving outdoor/indoor signalling works including MACLS/ EI/ PI/RRI/IBS/IBH/LC Gate/ DAC / ELD and ELD for Signalling Cable, Quad Cable, Fuse Auto Change Over System etc.
21 conditions · 5 needing a document upload
The following documents should be specified for submission along with tender:
LOA and Final bill copy of completed work whose credential submitted vide special technical criteria must be uploaded.
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
The tenderers whether sole proprietor, a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement, receive money, witness measurements, sign measurement books, compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certified and refer all any disputes arbitration.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For those conditions for which standard formats have been given in the uploaded titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State , Central Govt. and any other local authority.
GST shall be applicable as per extant instruction on the subject.
Eligibility criteria for works tender in respect of partnership firms.
In case the tenderer is a partnership firms, the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as branch of trust and abandonment if the contract.
JOINT VENTURE will not be permitted for the tenders.
For standard Finance criteria and standard Technical - Tenderers are required to submitted authenticated certificate along with the tenders from officers of government or semi - government/public sector under takings under whom the work has been executed indicating there in the name of work executed, value of works/payment details and period during which completed. Such certificate should have signature and seal of the concerned officer. In the absence of such certificate the tender may not be considered.
Earnest Money and Tender Document Cost: Payment of Earnest Money deposit (EMD) & Tender Document Cost (TDC) in respect of e-tendering, should be accepted through net banking or payment gateway only
Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These form of Performance Guarantee could be either of the State Bank of India or of any of the Nationalized Banks.
Note for Commercial compliance :-
BOOKS OF REFERENCE : These tender documents are to be read with the followings books with versions updated/corrected/modified up to the date tender opening:1) E. C. Railway Engineering Department- Standard General Conditions of Contract April 2022 as amended by updated correction slips termed GCC 2022.
In case of items C. of Commercial Compliance, supportive documents/certificates from the organizations with whom they worked/are working should be enclosed.
Rehabilitation & reliability improvement of S&T gears in HJP-BCA Section.
SandT-SEE-E-OT-26-27-18
SandT-SEE-E-OT-26-27-18
Open
Works - General
6 Months
Saran, Bihar
₹0
₹1.8 L
27 Jul 2026
3 Jul 2026
13 Jul 2026
38 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 87,72,919.06 | ||
| — | — | — | Above/ 244975.05 Below/P | ||
| Filling earth around location box/signal post for a width of 0.5 m on all sides, upto a level of 150 mm below the foundation top. This work includes consolidation of earth by watering. (Note: Unit:- "Cum" should be understood Per Cu. Mtr.) | — | 1500.00 | — | — | |
| — | — | — | Above/ 44406.00 Below/P | ||
| "Casting, concreting and curing of foundation for Full size apparatus case (GKP Type) as per drg No. SGW/MGS/L1/91 including cost of all materials required for fixing holding down bolts, casting, concreting, erection and fixing of 'E' type lock. Note :i) The contractor will provide holding down bolts, ii) Bottom of apparatus cases should be filled with sand and the top surface covered with masonry work and neat cementing." | — | 10.00 | — | — | |
| — | — | — | Above/ 1841487.00 Below/P | ||
| Providing and laying in position cement concrete of 1:3:6 (1 cement : 3 Sand: 6 gradded stone aggregate 20 mm nominal size) including cement as per site requirement & as per instruction of site incharge. | — | 300.00 | — | — | |
| — | — | — | Above/ 13178.54 Below/P | ||
| Casting, concreting and curing of foundation for Main signal and as per DRG.No. SGW/MGS/S1/91 including cost of all materials required for casting and concreting and provision of holding down bolts & nuts. | — | 2.00 | — | — | |
| — | — | — | Above/ 39318.73 Below/P | ||
| Supply of FRP type TLJB (track lead junction box) fitted with 4-way ARA terminals with Angle iron of Size (1500 x 50 x 50)mm & 6mm thick to hold the junction box and for fixing cable entry pipe (40x 500) mm. as per Spec.No.- RDSO/SPN/151/1997or latest. (ARA terminal- RDSO, TLJB- consignee) | — | 50.00 | — | — | |
| — | — | — | Above/ 24590.75 Below/P | ||
| Installation of Track Lead Junction Box as per direction of site engineer incharge. | — | 50.00 | — | — | |
| — | — | — | Above/ 1374685.00 Below/P | ||
| — | 500.00 | — | — | ||
| — | :- Maintenance Cable. in work also includes will be | of Signalling The work organise by team disconnection/maintenance of should comprise of Signal any work as per supplied by the contractor. | Gates/Main/Tail signalling in disconnection, gates. The team to jointer(Tele)-1 no, and All T&P required | ||
| — | — | — | Above/ 2076543.43 Below/P | ||
| Supply, Transportation, Installation and Commissioning with OEM certification of SMPS-based Modular Power Supply Arrangement for VDU (42"-85") and Industrial PC (Embedded PC) with input and output redundancy arrangement with SPD for 2 input sources and hot-pluggable modules as per RDSO latest TAN for VDU/Embedded PC Power Supply Arrangement and as per attached Technical specification. (Inspection by RDSO) | — | 10.00 | — | — | |
| — | — | — | Above/ 827591.82 Below/P | ||
| Supply of INVERTER (3 KVA) of STATCON make as per RDSO Spec no. RDSO/SPN/ 165/2012 ver 3.0 or Latest (Inspection by RDSO) | — | 6.00 | — | — | |
| — | — | — | Above/ 76556.04 Below/P | ||
| Supply of TRANSFORMER (1000 VA) of STATCON make as per RDSO Spec no. RDSO/SPN/ 165/2012 ver 3.0 or Latest (Inspection by RDSO) | — | 4.00 | — | — | |
| — | — | — | Above/ 70800.00 Below/P | ||
| Wiring charges of above item no. 9 &10 | — | 10.00 | — | — | |
| — | — | — | Above/ 108006.73 Below/P | ||
| Laying cable of different sizes as per cable route plan approved by Railway and meggering of all main & tail cables as per technical specification of tender. (i) 2 core to 12 core signalling cable. | — | 13.00 | — | — | |
| — | — | — | Above/ 840796.75 Below/P | ||
| Providing brick masonry in ratio 1:6 cement and mortar including plastering with 1:4 cement and sand mixture both sides, 20 mm thick each with contractor's owned class II bricks, including excavation, curing, grouting , bolting etc. wherever required. Bricks, sand and cement to be supplied by the contractor. | — | 500.00 | — | — | |
| — | — | — | Above/ 733488.00 Below/P | ||
| Supply of additional ACDP panel of SMPS based STATCON make IPS systems with required inter connection cable and other accessories which is necessary for inter connection installation.(Block Diagram is enclosed in ANNEXURE-1) (Inspection by RDSO) | — | 2.00 | — | — | |
| — | — | — | Above/ 48311.00 Below/P | ||
| "Supply of 2 KVA UPS input 160 V to 260 V AC operating with battery and back up upto 2 hrs. & as per attached technical specification Make :- Powersafe or APC or Luminous, Microtek or higher. (Inspection by Consignee) Note:- Item must be approved by consignee & controlling officer before supply." | — | 1.00 | — | — | |
| — | — | — | Above/ 269568.00 Below/P | ||
| Excavation of trench in all kinds of soil and refilling of trenches (1 Mtr. Depth 300 mm width) | — | 5.00 | — | — | |
| — | — | — | Above/ 128043.00 Below/P | ||
| Hiring of JCB Machine ( in good working condition) for levelling and dressing ground/dismantling structures including disposal of debris through dumpers etc.with Contractor's Labour, JCB machine, Machine Operator, Fuel etc. The contractor shall arrange road permit for vehicle for all the States of operation, as all per instruction of Engineer-in-charge and vehicle shall not be more then three years old. Payment shall be made for actual working hours at site. | — | 150.00 | — | — | |
| — | — | — | Above/ 10573.22 Below/P | ||
| Transportation of less heavy materials & manpower by supply & running of one MUV to the sites of work as per requirement and direction of Engineer-in-charge along with driver. The rate includes all taxes, licence fee, road permit, driver wages, fuel, repair and maintenance cost etc, complete in all respects. | — | 492.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
I_CT_GCC-
ATTACHMENT
ACS1TO10.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
Full Notice
ATTACHMENT
IRCONHJP-
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22_1.pdf
ATTACHMENT
T-26-27-18FullNotice-IRCONHJP-BCAdeficiency.pdf
ATTACHMENT
T-26-27-18TenderDocument-IRCONHJP-BCAdeficiency_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .