Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
31 Aug 2023, 2:00 pmClosed
GENERAL MANAGER
U.P. STATE SUGAR CORPORATION LTD., UNIT MOHIUDDINPUR, DISTT. MEERUT, U.P., PIN-250205
Equipment /Machinery, Dismantling at U.P. sugar and cane development corporation Ltd. Unit- munderwa (Basti) site, Loading and TransportationThroughvehicle (own source), unloading of Transported Equipment along with removal of old existing Sulphur fu
2023_UPSSC_830109_1
MOH/PD/2023-24/533 Dt. 16-08-2023
Open Tender
Miscellaneous Services
Item Wise
90 days
MOHIUDDINPUR (MEERUT)
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹590
U.P. State Sugar Corporation
₹25,000
4 Sept 2023
18 Aug 2023
1 Sept 2023
18 Aug 2023
31 Aug 2023
18 Aug 2023
Dismantling of Equipment/Machinery details as under
Sulphur furnace batch type. Capacity 200Kg/Hr. with all accessories (complete set). with all Instruments for Automation if available & controlling panels with F.R.P SO2 Pipe Fitting, Acid Drain & Structures etc. (For Juice Sulphitor) (01 Set)
Sulphur furnace batch type capacity 100 Kg/Hr. with all accessories (complete set). with all Instruments for Automation if available controlling panels with F.R.P SO2 Pipe & valves Fitting & Structures etc. (For Syrup Sulphitor)
E-boiler for Sulphur furnace complete set with controlling panel (Complete set) with Heaters, Leval Transmeters E.T.C, Along with Extra Heaters & other spares & Structures, In Coming Supply Switch Gear ACB Panels & Cobles etc. if Can be dismentalled
E-boiler condensate pump, Make KSB RPM-2865, Cap-6.92 Cu meter/Hr. motor-1.5 K.W RPM-2840. Complete set for SO2 Furnace & foundation bed & Structures etc.
Air blower for Juice & syrup side furnace, Make KAY international Pvt. Ltd speed-1329 RPM, Cap- 894 Cub. meter/Hr. back press. -1.0 Kg Sq Cm, Motor- CE make, 45KW, RPM-1475 with pipe line and fitting Along with air dryer if available.
Syrup Sulphitor cap.-120HL, Syrup Receiving vessel-01 No, Grit catcher-02 Nos. Pumps-02Nos, Motor-02Nos, pumps & Motor details- capacity-80 Cubic meter/Hr. Head-30 mtr, RPM-1450, KW-18.5 Motor RPM-1475 with Automated Brix Meter Installations Complete with all automation systems & Structures req for re errection, it may be dismentalled from munderwa unit. (01 Set)
Light vertical Multistage centrifugal pump, model-CDL211, Cap-2.0 CU mtr/Hr. Kw-1.1, RPM-2900, Head-82m with all accessories like electrical control panel foundation structure etc.
Dismantling of Perlins G.I Sheeting at munderwa unit for taking out syrop sulphitor & Sulphur furnaces Equipment from its Strutures & foundation for dragging up to loading point.
After talking out Syrup Sulphitor, Sulphur furnace etc. from its foundation & structure at munderwa unit perlins & G.I Sheeting will be refitted.
Dismantled above mentioned Equipments is to be loaded in truck at munderwa site. To be transported from munderwa (district Basti U.P.) to unit- mohiuddinpur (District Meerut) approx. distance 785K.M & to be unloaded at Mohiuddinpur site.
Dismantling & shifting of 3 nos. batch type Sulphur furnaces with all accessories along with 2 nos. air blowers & clearing all obstructions like pipe lines & structures etc. at that place, Making way for installation of trafferred equipment to keep at decided foundation & structures by dismantling existing pipelines & structures along with strengthening of foundation, platfarm & structures in view of errection of transferred equipments from munderwa unit at our site. For installations, new structure & foundation may be fabricated existing dismentalled pipeline & structure should be refitted in view of coming crushing season 2022-23. existing process pipelines & structures will be disturbed only with the consent of outsourcing party officers & unit responsible officers. After dismantling old equipments it should be shifted in scrapyard as directed by chief engineer unit.
Errection & Commissioning of above all transferred equipments at our site including structure fabrication for syrup sulphiter alongwith necessary modifications in the Equipments if require as per our Crushing requirement during season 2023-24 & related pipelines etc. & giving satisfactory trials.
If any work is left and found necessary for the successful commissioning of Suphur furnace and gas Line which is not mentioned in tender should also be done without making any additional Payment other then order Valve will be in the Scope of party (Contactor)
All the Civil work with Material will be in the Scope of Party (Contactor).
EVERANT TECHNOLOGIES
S.P.S. ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .