Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.7 L+₹5,232.50 (1.44%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.8 L+₹13,850.70 (3.81%)Admitted-Finance BADHAWAL KHAS BHOJAPUR SAKALDIHA CHANDAULI CHANDAULI UTTAR PRADESH 232108 | CHANDAULI | UTTAR PRADESH | 232108 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI SAI TRANSMISSION CONSTRUCTION L2 | S. P. ELECTRICAL CO L3 | M/S PRABHU NARAIAN CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00Centralised Materials- A | ||||||
| 2.00 | PCC POLE 8.5 M LONG | 42 | No. | - | - | - |
| 3.00 | LT AB Cable (3.5x50) sq mm | 150 | Mtr. | - | - | - |
| 4.00 | LT AB Cable (3x95+1x70+1x16) sq mm | 172 | Mtr. | - | - | - |
| 5.00 | LT AB Cable (3x120+1x95+1x16) sq mm | 90 | Mtr. | - | - | - |
| 6.00 | ACSR Weasel Conductor | 3,677 | Mtr. | - | - | - |
| 7.00 | 11 KV V Type Cross Arma | 20 | No. | - | - | - |
| 8.00 | 11KV Tee off Channel | 19 | No. | - | - | - |
| 9.00 | Stay Complete | 39 | No. | - | - | - |
| 10.00 | Earthing Complet | 29 | No. | - | - | - |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
20 Nov 2025, 4:00 pmClosed
Superintending Engineer
EDC-Chandauli
Work of shifting of high tension wires and LT lines passing over primary and govt. higher primary schools, secondary and higher secondary schools within the areas of EDSD-Chandauli,Jivnathpur,Saiyadraja under the Deposit Scheme.
2025_PVVNV_1089682_1
55/EDC(C)/2025-26
Open Tender
Repair and Maintenance Works
Lump-sum
180 days
Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC, Chandauli
₹4,000
24 Nov 2025
11 Nov 2025
21 Nov 2025
11 Nov 2025
20 Nov 2025
11 Nov 2025
Amount
Centralised Materials- A
PCC POLE 8.5 M LONG
LT AB Cable (3.5x50) sq mm
LT AB Cable (3x95+1x70+1x16) sq mm
LT AB Cable (3x120+1x95+1x16) sq mm
ACSR Weasel Conductor
11 KV V Type Cross Arma
11KV Tee off Channel
Stay Complete
Earthing Complet
11KV Pin Insulator with Pin
11 KV Disk Inulator With Fitting
11KV Corss Arm
Distribution Box
Decentralized Materials- B
F-Bracket for Fitting top insulator with Bolt & Nuts
Stone Pad
X-Arm Clamp
Danger Board
Eye-Hook
Suspension Clamp with I Hook
Dead End Clamp
Dead End Clamp with I Hook
3 Phase Distribution Boxs
LT Connector
LT Connector Type A (Line to Line)
LT Connector Type A (Line to DB)
LT Bare Nutral Connector
MID SPAN Joint Connector
MS Clamp for I Hook
Nut Bolt & Washer
Clamp for Distribution Box
Concreating of Pole
Concreating of Stay
Clamp for T-Off
Alluminium Cable for Distribution Box
Clamp for Double Pole
Connetor for LT ABC Cable 3x95+1x70+1x16 sqmm
11KV T-Off Channel / X-Arm Holding Clamp with N/B
Labour & Maintainance charges - C
Work of Carriage of 8.5 meter PCC Pole from store centre Sahupuri/Rajatalab to site with loading & unloading.
Work of Erection of 8.5 meter PCC Pole with Digging & Fitting of Fixtures as per RESSPO standard. with All Accessories (Pin, Disc, T-Off, V-Cross, Holding Clamp, Suspencen Clamp, Dead End Clamp, Ms Clamp, Clamp for DB, Clamp for DP, Nut & Bolt, Danger Board, Stone Pad, F-Bracket etc.)
Work of Carriage & Erection of ACSR Weasel Conductor with All Accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site.
Work of Carriage & Erection of LT AB Cable (3x120+1x95+1x35) sqmm Fitting with All Material (Eye Hook, 3 Phase Districution Box, LT Connector, MID Span, Joint Connector, Al. Cable for DB etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard.
Work of Carriage & Erection of LT AB Cable (3x95+1x70+1x16) sqmm Fitting with All Material (Eye Hook, 3 Phase Districution Box, LT Connector, MID Span, Joint Connector, Al. Cable for DB etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard.
Work of Carriage & Erection of LT AB Cable (3x50+1x35+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard.
Work for LT Line Dismentaling & Carriage O&U Material form Site to centre Sahupuri/Rajatalab to site.
Work for 11KV HT Line Dismentaling & Carriage O&U Material form Site to centre Sahupuri/Rajatalab to site.
Work of Carriage & Erection of Earthing Complete with loading & unloading from store centre Sahupuri/Rajatalab to work site.
Work of Carriage & Erection of Stay Complete with loading & unloading as per RESSPO standard.
Work of Pole Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard.
Work of Stay Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard.
SHRI SAI TRANSMISSION CONSTRUCTION (BID ID -5688342)
S. P. ELECTRICAL CO (BID ID -5688352)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
TN55.rar
Tender Documents • 0.30 MB
BOQ_2000645.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .