| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹29.4 CrAccepted-AOC PLOT NO 6 TOWER C 7 FLOOR TECH BOULEVARD SECTOR 127 NOIDA U P | NOIDA | UTTAR PRADESH | ₹29.4 Cr | Ist | Accepted-AOC Ist Lowest |
| 2 | IInd₹29.5 CrRejected-AOC 504 5TH FLOOR 58 SAHYOG BUILDING NEHRU PLACE SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹29.5 Cr | IInd | Rejected-AOC High Rate |
| 3 | IIIrd₹29.9 CrRejected-AOC 7TH FLOOR TOWER B BHUTANI ALPHATHUM SECTOR 90 NEPZ POST OFFICE NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201305 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201305 | ₹29.9 Cr | IIIrd | Rejected-AOC High Rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical UnQualified |
| 5 | Rejected-Technical RZ 486 C 2 KH NO 601 G F GALI NO 20 SADH NAGAR PALAM COLONY PALAM SOUTH DELHI SOUTH WEST DELHI DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | - | - | Rejected-Technical Unqualified |
Tender Value
₹30.3 Cr
EMD Value
₹60.5 L
Closing Date
18 Mar 2026, 3:00 pmClosed
CE BDA
CE Office BDA Bareilly
Ram Ganga Nagar awasiye yojna ke sec-12 me utsav bhawan ka nirman/vikas karye
2026_BDAUP_1117921_1
T-09/2026/14
Open Tender
Civil Works
Percentage
365 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹40,000
Vice Chairman, Bareilly Development Authority
₹60.5 L
Bareilly Development Authority
6 Apr 2026
19 Feb 2026
19 Mar 2026
19 Feb 2026
18 Mar 2026
19 Feb 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. ((DSR -2.8.1)) | 2,457.99 | Cum | 191.8 | ₹4,71,442.48 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil
1.5M - 3.0M ((DSR -2.26)) | 589.35 | Cum | 129.2 | ₹76,144.02 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. ((DSR -2.25)) | 760 | Cum | 524.6 | ₹3,98,696 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. ((DSR -2.27)) | 189.57 | cum | 1,600.6 | ₹3,03,425.74 |
| 5 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration ((DSR -2.35.3.1)) | 888 | Sqm | 229.4 | ₹2,03,707.2 |
| 6 | Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc.:
With Chlorpyriphos/ Lindane E.C. 20% with 1%
concentration ((DSR -2.35.2.1)) | 108.7 | Rmt | 35.4 | ₹3,847.98 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ((DSR -4.1.8)) | 135.62 | Cum | 5,144.9 | ₹6,97,751.34 |
| 8 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) ((DSR -4.1)) | 57.07 | Sqm | 305.6 | ₹17,440.59 |
| 9 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7Kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. ((DSR -4.13)) | 85.61 | Sqm | 105.5 | ₹9,031.86 |
| 10 | "Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland
Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in
design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the
cost of extra cement." All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum ((DSR -5.33.1.1)) | 932.04 | cum | 7,180.6 | ₹66,92,606.42 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_2077512.xls
BOQ • 1.13 MB
TenderDocuments.pdf
Tender Documents • 22.27 MB
letter224.pdf
PDF • 0.50 MB
convention.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .