Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance AT MAIN ROAD PO LAMTAPUT PS LAMTAPUT DIST KORAPUT PIN 764081 | KORAPUT | ODISHA | 764081 | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹24,444.36 (0.20%)Admitted-Finance | ₹1.2 Cr+₹24,444.36 (0.20%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹7.6 L (6.09%)Admitted-Finance | ₹1.3 Cr+₹7.6 L (6.09%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non furnish of document |
| Sl No | Description | Qty | Unit | BALAKRISHNA DASH L2 | Nishakara Sharma L3 | ASHOK KUMAR SAHU L1 |
|---|---|---|---|---|---|---|
| 1.00Laying of pipe line ,Head works, Other Balance Works | ||||||
| 1.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection, installation of submersible pump with motor in deep Tube well ,Repair and painting of OHR & pumphouse etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to E). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 87,11,380 ₹87,11,380 | 92,23,814 ₹92,23,814 | 86,94,300.26 ₹86,94,300.26 Lowest |
| 1.02 | ELEVATED STORAGE RESERVOIR (150 KL capacity R C C elevated storage reservoir 15 m Staging )
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 150 KL capacity with necessary staging height of 15 mtr of shaft wall and circular dome using CC M-25 , Raft foundation as per approved drawing,supplying, fitting & fixing of 150mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR, and Aluminium ladder inside the ESR of 5.50 mtr length X0.45m width,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor with copper conductor, water level indicator, with MS gate in the wall of shaft wall with 5 nos. of ventilators of size min 0.25X0.50mtretc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR /Paralamaharaja Engineering College,Berhampur at his own cost). | 1 | Nos | 37,55,995.9 ₹37,55,995.9 | 39,76,936 ₹39,76,936 | 37,48,631.28 ₹37,48,631.28 Lowest |
Tender Value
₹1.2 Cr
Closing Date
7 Jun 2021, 5:00 pmClosed
Superintending Engineer, RWSS Division, Berhampur
Near Jarada Bunglow, Berhampur
PWS to Takarada under Sheragada Block.
2021_RWSS_68421_3
EERWSSBAM- 03 ( A ) / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
365 days
PWS to Takarada under Sheragada Block.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
7 Sept 2021
13 May 2021
8 Jun 2021
13 May 2021
7 Jun 2021
13 May 2021
13 May 2021 - 1 Jun 2021
Amount
Laying of pipe line ,Head works, Other Balance Works
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection, installation of submersible pump with motor in deep Tube well ,Repair and painting of OHR & pumphouse etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to E). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
ELEVATED STORAGE RESERVOIR (150 KL capacity R C C elevated storage reservoir 15 m Staging ) Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 150 KL capacity with necessary staging height of 15 mtr of shaft wall and circular dome using CC M-25 , Raft foundation as per approved drawing,supplying, fitting & fixing of 150mm dia medium grade GI pipe Tata/Jindal/Sail/Nezone make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR, and Aluminium ladder inside the ESR of 5.50 mtr length X0.45m width,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor with copper conductor, water level indicator, with MS gate in the wall of shaft wall with 5 nos. of ventilators of size min 0.25X0.50mtretc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR /Paralamaharaja Engineering College,Berhampur at his own cost).
BALAKRISHNA DASH
Nishakara Sharma
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 1.62 MB
Tendernotice_3.pdf
PDF • 1.62 MB
BOQ_353418.xls
BOQ • 0.28 MB
A03Takarada.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .