Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Evaluated |
| 2 | Accepted-Technical COAL INDIA LIMITED | Accepted-Technical Technically Evaluated |
| 3 | Accepted-Technical BARDUBHI DHANBAD 828129 | DHANBAD | JHARKHAND | 828129 | Accepted-Technical Technically Evaluated |
Tender Value
₹1.9 L
EMD Value
₹2,355
Closing Date
27 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.K.Panja
Office of the Project Officer,WJ Area
Construction 2 no.ventilation stopping with door in XVI top seam, 7dip of 400 loco lat at Moonidih Colliery W.J Area .
2026_BCCL_353393_1
BCCL/WJA/MND/SUR/2025-26/72
Open Tender
Miscellaneous Works
Percentage
7 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹2,355
5 Mar 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
Construction 2 no.ventilation stopping with door in XVI top seam, 7dip of 400 loco lat at Moonidih Colliery W.J Area .
floor cleaning= A site, 5.10 x 0.50 x 0.30= 0.772m³ B site, 5 x 0.50x 0.30= 0.75 m³, total = 1.52 m³
recess cutting, rock in floor and coal in side A site, (a) sides ( 2.65 x 0.30 x 0.30 x 2 sides)= 0.48 m³. (b) floor ( 0.30+ 5.10+0.30) x 0.50 x 0.20= 0.57 m³ site B, (c) sides ( 2.70 x 0.30 x 0.30 x 2 sides)= 0.49 m³. (d) floor ( 0.30+ 5.00+0.30) x 0.50 x 0.20= 0.56 m³ total (site A+B) = 0.48+ 0.57 + 0.49 + 0.56= 2.10m³
Brick work (1:4)with FPS bricks CD-50 bricks in foundation & plinth. A site up to (a) floor level 5.70 x 0.38 x(0.20+0.25) = 0.43m3 (b) volume of 2 nos of colom, 0.38 x 0.38 x(1.5-.25) x 2colom= 0.36m³ (c) volume of wall, Lenght ( excluding colom and width of door) = (5.7 -0.38-0.38-1.7)= 3.24 m vol= 3.24 x0.25x (1.5-0.25) = 1.01 total volume = 0.97 + 0.36 + 1.01= 2.34m³. B site (a) floor level 5.60 x 0.38 x(0.20+0.25) = 0.96m3 (b) volume of 2 nos of colom, 0.38 x 0.38 x(1.5-0.25) x 2colom= 0.36 (c) volume of wall, Lenght = (5.6 -0.38-0.38-1.7)= 3.14 m vol= 3.14 x0.25x (1.5-0.25) = 0.98m³ total volume = 0.96 + 0.36 + 0.98= 2.30m3. total volume site a +b = 2.34 + 2.30= 4.64m³.
Brick work (1:4)with FPS bricks CD-50 bricks in super structure plinth level up to V-level in all shape & size. A site from (a) volume of 2 nos of colom, 0.38 x 0.38 x(2.65-1.5) x 2colom= 0.33 (b) volume of wall (1.5m to 2.65m including door excluding colom) remaining Lenght = (5.7 -0.38-0.38)= 4.94m vol= 4.94 x0.25x (2.65-1.5) = 1.42m3 (c) less volume for door = 1.7 x 0.25 x (1.7-1.5) = 0.09 total volume= (a+b-c)=0.33+1.42-0.09 =1.66m3. B site (a) volume of 2 nos of colom, 0.38 x 0.38 x(2.7-1.5) x 2 colom= 0.35m3 (b) volume of wall (1.5m to 2.65m including door excluding colom) remaining Lenght = (5.6 -0.38-0.38)= 4.84 m vol= 4.84 x0.25x (2.7-1.5) = 1.45 (c) less volume for door = 1.7 x 0.25 x (1.7-1.5) = 0.09 total volume (a+b-c)=0.35+1.45-0.09=1.71m3 total volume site a +b = 1.66 + 1.71= 3.37m3.
12 mm cement plaster, face of wall, in 2 face of every wall. site A (a) less area of door 1.7 x1.7 =2.89m2. (b) lenght of wall 5.1 +[((0.38-0.250/2)X4]=5.1+0.26=5.36 ht 2.65 area = 5.36x 2.65= 14.20m2 (c) perimeter of door face wall = 1.7+1.7+1.7 =5.1 area =5.1 x(0.25/2)= 0.64 m2 net area of 2 face =2x (b+c-a) =2 x (14.20+ 0.64 - 2.89)= 23.9m2. site B (a) less area of door 1.7 x1.7 =2.89m2. (b) lenght of wall 5.0 +[((0.38-0.250/2)X4]=5.0+0.26=5.26 ht 2.7 area = 5.26x 2.7= 14.20m2 (c) perimeter of door face wall = 1.7+1.7+1.7 =5.1 area =5.1 x(0.25/2)= 0.64 m2 net area of 2 face =2x (b+c-a) =2 x (14.2+ 0.64 - 2.89)= 23.9m² total area site A+ B =23.90 + 23.90=47.80m².
Providing two extra lead including loading,unloading, stacking and carrying of 1000 Bricks,(1 at surface + 1 in UG). carriage of brick,extra 1 number lead @ 436.90/1000, cost of 2 lead = (2x 436.90)/1000= 873.8/1000bricks=0.87/briks number of brick=4.64+3.37=8.01m³, @ 494bricks/m³,number of bricks=3956.94 say 3957
Providing two extra leadfor loading,unloading, stacking and carrying of sand,(1 at surface + 1 in UG) . carriage of sand,extra 1 number lead @ Rs234.05/m³, cost of 2 lead = (2x 234.05)/m³= 468.1/m³ Sand For B/W=8.01m³x 0.26=2.08m³ Sand for plastering= 47.80 m²x0.015=0.72m3 Total= 2.08 + 0.72m³= 2.80m³
Providing two extra lead forloading,unloading, stacking and carrying of cement, (1 at surface + 1 in UG). carriage of cement ,extra 1 number lead @ Rs135.55/te , cost of 2extra lead = (2x 135.55)/te= 271.10/te Cement For B/W=8.01m³x1.9=15.22 bags cement for plaster=(47.8m²x7.5)/100=3.59 bags Total = 15.22 + 3.59 =18.81 bags say 19 bags x50/1000=0.950 te
instalation of doors 02 nos (each dimantion 1.7m x1.7m) from surface to site A ( loading in surface, loawering pit bottom, transport to site, unloading ,position the door for installation and installation the door) 12 man shift is required
Transportation of meterials through winch/ haulage by mine car at 7th dip from Jn.of Loco lataral 400MH ,XVI(T) seam@ 500 bricks/Mine car, sand & other [email protected]/Minecar ,Cement@30bags/Minecar. therefore mine cars required For bricks=3957/500=7.91 Minecar For Sand = 2.80m3/2.20=1.27 Minecar For cement=19bags/30=0.63 Mine-car Total=7.91+1.27+0.63=9.81 say 10 Mine car.
Transportation of empty tubs through winch/ haulage at 4th dip of XVI(B)seam-500MH to Jn.of Loco lataral 500-MH of XVI(B) seam.=10 Mine car
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
CMPF, Pension and admin. Charge of Employee SemiSkilled
CMPF, Pension and admin. Charge of Employee Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_366185.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .