Loading…
Loading…
Tender ID
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
1 Jun 2026, 12:00 pmClosed
Executive Engineer
Rubble Pitching Restoration work of Baldeva Irrigation Scheme.
297979
1 of 2026-27
Open
Civil - All
Works
Narmada
9 documents required · 9 mandatory
₹6,000
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹3.1 L
1 May 2026
1 May 2026
1 May 2026
1 Jun 2026
1 May 2026
BILL OF QUANTITIES
(ATTACHED SEPARATELY)
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender ( Upto INR 50 Cr.)
Item Description of Item(with brief Quantity Unit Rate In Amount
No. specification and reference to figures
book of specifications)
Dismantling the existing Riprap and 29090.00 SQMT. 194.10
1. the layers of filter material stacking
and/or using the material as directed
including clearing the slope of earth
dam for zero leads and lifts etc
complete. With Filter Layer (45 CM)
Quarrying suitable materials from
2. approved borrow areas transporting 8727.00 CMT. 142.10
the same and spreading the same
material and respective zone in
uniform layers of specified thickness,
dressing ,breaking clods, removing
oversize material, roots etc. (Without
Compaction) with lead up to 1 km and
(B) Casing zone/ S.P. zone
Compaction of selected soil/hard
3. murrum/soft murrum in even 8727.00 CMT. 57.80
thickness of 15 to 20 cms including
watering, temping with suitable hand
rammer etc. complete as directed.
Quarrying transporting suitable filter
4. materials specified gradation from 4363.50 CMT. 885.10
approved borrow pit area/stock piles,
spreading the materials in specified
thickness dressing removing oversize
materials roots etc. watering up to
saturation rolling with suitable type of
roller for all lifts etc. complete. (A)
Quarrying transporting suitable filter
5. materials specified gradation from 4363.50 CMT. 826.60
approved borrow pit area/stock piles,
spreading the materials in specified
thickness dressing removing oversize
materials roots etc. watering up to
saturation rolling with suitable type of
roller for all lifts etc. complete. (B)
Quarrying and transporting suitable
6. rubbles stone spauls of specified size 20363.00 SQMT. 767.10
from approved quarries and or stock
pile and laying hand placed rip-rap of
specified thickness as per approved
drawing using header stones (rough
through stones) in a grade of 1.5m x
1.5m after trimming and / or dressing
the slopes including hand packing the
stones using the light hammer driven
stone wedges into gaps around stone
into for all lifts etc. comp.
(C) Thickness 45 CM
Re-arranging the disturbed rubble rip
7. rap on upstream slope of earthen dam 8727.00 SQMT. 68.00
in correct slope in following thickness
including necessary packing to the
required depth etc. complete.
(b) Thickness 45 cm
I/We/am/are willing to carry out the work at… ................. %above/below percent (Should
Be written in figures and words)of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)………………………………
(C)Net Tendered Amount (A-B) (in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. as stated in S.O.R .therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Sign of Contractor Deputy Executive Engineer Executive Engineer
Dholi Irrigation Subdivision Irrigation Project Division No.4
Rajpardi Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Baldeva.pdf
SBD Baldeva Rubble Pitching.pdf
Item Wise specification Baldeva Rubble Pitching.pdf
NIT Baldeva.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .