Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.5 L
EMD Value
₹50,000
Closing Date
24 Oct 2026, 6:55 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Managing Director KPHCC
KPHCC HEAD OFFICE, CSN STADIUM, PALAYAM, TVPM
ASUMP 2026 27 Information Technology Establishment of District Training Centre Muttathara Thiruvananthapuram
2026_KPHCC_881033_1
NIT No.70/KPHCC/2026-27
Limited
Civil Works - Buildings
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
₹50,000
17 Oct 2026
17 Oct 2026
26 Oct 2026
17 Oct 2026
24 Oct 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing works | |||||
| 1.001 | 15.7.2:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar with old mughal bricks | 7.22 | cum | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.54 | cum | - | - |
| 1.003 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 30.88 | sqm | - | - |
| 1.004 | 15.41:Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead. | 30.88 | sqm | - | - |
| 1.005 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge | 3.36 | sqm | - | - |
| 1.006 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | 16.8 | kg | - | - |
| 1.007 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 87.83 | sqm | - | - |
| 1.008 | OD133017/2026-2027:Disposal of debris, rubbish and unserviceable waste material from the site to an approved dumping / disposal location by lorry, including collection loading of waste material into lorry transportation, unloading the disposal at the designated location including labour, lorry hire charge, fuel, loading and unloading charges all leads and lifts and incidental expences,complete as directed by engineer in charge. | 1 | Day | - | - |
| 1.009 | OD133259/2026-2027:Providing and fixing 12 mm dia HYSD/TMT reinforcement bars by lock setting/chemical anchoring into the existing RCC slab for slab extension, including drilling holes of required diameter and depth in the existing concrete, cleaning/blowing the drilled holes, applying approved chemical anchoring/epoxy adhesive, inserting and fixing the reinforcement bars to the required embedment depth, maintaining proper alignment and spacing, including all necessary tools, labour, consumables and incidental works, complete as directed by the Engineer-in-Charge. | 50 | no | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 0.70 MB
tenderdocument2023.pdf
Tender Documents • 2.25 MB
BOQ_1498559.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .