| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC KERALA KL | KOZHIKODE | KERALA | 612906 | L1 | Accepted-AOC Higher rate and hence not admitted | |
| 2 | L2₹5.5 L+₹51,690 (10.4%)Rejected-AOC THAVANOOR OMASSERY KOZHIKODE | KOZHIKODE | KOZHIKODE | KERALA | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | VIJAYAN V K L2 | AHAMMED KUTTY P L1 |
|---|---|---|---|---|---|
| 1.00Well construction | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.73 | cum | 3,372 ₹9,192.07 | 2,800 ₹7,632.8 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 39.03 | cum | 236 ₹9,212.02 | 210 ₹8,197.14 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 20.38 | cum | 120 ₹2,445.84 | 80 ₹1,630.56 Lowest |
| 1.00 | OD243930/2025-2026:Sinking well in all soils other than rock to lines and levels and plumb by scooping out from inside and below the stiening including the use of dredgers or any other appliance,hire and labour for kentledge ,jetting dewatering blasting vibrating or any other method including removal of obstacles and dumping the spoil within a distance of 150m -well 4m to 5.5m dia(outer)- 1st depth up to 3m below spring level.( STANDARD PWD DATA 1965 SI NO 703) (rate per meter depth from spring level) | 2 | metre | 25,098 ₹50,196 | 600 ₹1,200 Lowest |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 62.74 | sqm | 283 ₹17,754.57 Lowest | 360 ₹22,585.32 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 9.6 | sqm | 926 ₹8,889.6 | 860 ₹8,256 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 21.98 | sqm | 700 ₹15,386 | 660 ₹14,506.8 Lowest |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 6.27 | cum | 8,500 ₹53,329 Lowest | 8,600 ₹53,956.4 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 6.37 | cum | 12,346 ₹78,619.33 | 11,500 ₹73,232 Lowest |
Tender Value
₹5.6 L
EMD Value
₹13,990
Closing Date
19 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT ENGINEER
O/o Assistant Engineer, LID and EW , Omassery GP
CIVIL WORK
2025_LSGD_796574_3
E TENDER-5/2025-26/AE/LID EW/OMY
Open Tender
Civil Works - Others
Item Rate
180 days
Omassery Grama Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,235
Yes
₹13,990
Yes
5 Dec 2025
12 Sept 2025
22 Sept 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
Amount
Well construction
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD243930/2025-2026:Sinking well in all soils other than rock to lines and levels and plumb by scooping out from inside and below the stiening including the use of dredgers or any other appliance,hire and labour for kentledge ,jetting dewatering blasting vibrating or any other method including removal of obstacles and dumping the spoil within a distance of 150m -well 4m to 5.5m dia(outer)- 1st depth up to 3m below spring level.( STANDARD PWD DATA 1965 SI NO 703) (rate per meter depth from spring level)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
VIJAYAN V K (BID ID -2346228)
Bidder Name
VIJAYAN V K
AHAMMED KUTTY P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1318560.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .