Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹72,800Accepted-AOC BHAGWATI NAGAR JAMMU | 1 | Accepted-AOC 1 | |
| 2 | 2₹75,100+₹2,300 (3.16%)Rejected-AOC BHAGWATI NAGAR JAMMU | 2 | Rejected-AOC 2 | |
| 3 | 3₹78,400+₹5,600 (7.69%)Rejected-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 3 | Rejected-AOC 3 |
Tender Value
₹80,000
Closing Date
22 Nov 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Repair/maintenance of 100KVA capacity Voltage stabilizer installed at LIS Quasbabala
2021_IFC_147456_1
MID/AN/88
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
RAJAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
Exempted
Akhnoor
18 May 2022
11 Nov 2021
23 Nov 2021
11 Nov 2021
22 Nov 2021
12 Nov 2021
15 Nov 2021
180 days
Repair/maintenance of 100KVA capacity Voltage Stabilizer installed at LIS Quasbabala by way of disconnecting of Voltage Stabilizer from main power cables, opening and removing of panel of stabilizer, loosening top cover nuts & bolts. Extraction of damaged windings of two phases (coils) out of oil tank, complete re-winding of the coils using copper wire of superior quality, placing these re-winded coils in oven for sufficient time to remove moisture from them. Repairs to the regulators of the stabilizer by dismantling the regulator from frame. P/F of new Bakelite plate of suitable rating and thickness, boring and finishing of plate as per sample of the regulator and P/F of new contacts G.M. duly faced and turned 08 No. tapings/points, connecting leads & checking with the meters. Boiling of transformer oil by draining out of the tank and heating with the heater at least for two to three days to make it completely moisture free, cleaning & drying of the tank and re-filling with boiled oil. Also topping up 50 litres of new transformer oil, re-fitting of stabilizer frames and coils with regulators after necessary updating including insulations of DC wire strips. Connecting regulator & transformer by replacing old/ worn out insulation with new one and P/F of sleeves, new volt meters (0-500v)-2nos.(01 for input, 01 for output). Shifting and lowering the complete unit very carefully in the tank after P/F of shock proof gasket and body bolts with nuts, including checking/replacement of the fuses/indicators, connecting power cables and testing commissioning etc. Complete Job includes cost of material, transportation/to & fro charges, hire charges of tools and tackles required if any including skilled & semi-skilled labour etc.
BEE AAR ENTERPRISES
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .