Loading…
Loading…
Tender Value
₹30.3 L
EMD Value
₹3.0 L
Closing Date
18 Jun 2026, 5:00 pm
EO
Ofiice NP Azmatgarh
Ward No-3 me Shree Ram Sharma Ke Ghar se Raju Rajbhar Ke Ghar Tak Nali Patiya CC Road Ka Kary
2026_DOLBU_1155206_3
350/NPAZ/2026-27
Open Tender
Civil Works
30 days
NP AZMATGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,570
Yes
EO
₹3.0 L
Yes
Ofiice NP Azmatgarh
29 May 2026
29 May 2026
19 Jun 2026
29 May 2026
18 Jun 2026
29 May 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Earth work in surface excavation exceeding 30cm in depth but exceeding 1.50m excavation earth up to 50m and lift up to 1.50m as directed by engineer in change dsr n0-2.1.1 for all kind of soil | - | cum | 94.55 | - | BI01010001010000000000000515BI0100001114 |
| 2 | carte earth work in foudation of structure as per instruction of | - | cum | 145 | - | BI01010001010000000000000515BI0100001126 |
| 3 | Providing and laying in position with well graded material for base of road (as per analysis) | - | cum | 4,960.02 | - | BI01010001010000000000000515BI0100001129 |
| 4 | brick work with cpmmon burnt clay f.p.s non modular bricks of class desination 7.50 in foudation and plinth in cememnt mortar 1:4 cement coarse sand as per | 1 | cum | 5,366.79 | ₹5,361.42 | BI01010001010000000000000515BI0100001129 |
| 5 | p/l 12mm thick plaster of mix of1:4 cement corse sand as per dsr | - | sqm | 260 | - | BI01010001010000000000000515BI0100001129 |
| 6 | providing and laying damp proof course 40mm thick with cement concrete 1:2:4 coarse sand derived from natural source | 1 | cum | 299.15 | ₹298.85 | BI01010001010000000000000515BI0100001129 |
| 7 | construction of granular sub base grade by providing well graded materials spreding in uniform layers 1.28 times compacting with smooth whel roller and others | - | cum | 3,150 | - | BI01010001010000000000000515BI0100001129 |
| 8 | providing and laying in position cement concrett of specified garde excluding the cost of cetring and el as per | - | qlt | 8,200 | - | BI01010001010000000000000515BI0100001129 |
| 9 | s/f reinforcement in rcc work including all cost complete | - | qlt | 6,200 | - | BI01010001010000000000000515BI0100001129 |
| 10 | providing and laying of foudation inauguration stone as per direction of engineer in change | - | cum | 12,000 | - | BI01010001010000000000000515BI0100001129 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.21 MB
BOQ_2164054.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid