| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.8 L+₹16,760 (1.58%)Rejected-AOC NEAR DFO OFFICE VIDYA NAGAR MEHAM ROAD BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.1 L+₹46,800 (4.40%)Rejected-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹16.4 L+₹5.7 L (54.0%)Rejected-AOC LANE NO 03 PRAGATI VIHAR RISHIKESH | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
28 Apr 2023, 1:00 pmClosed
SE O and M Roorkee
SE O and M PTCUL 26 CIVIL LINES ROORKEE
WORK OF PREVENTIVE MAINTENANCE AMC OF 220/132/33 KV EQUIPMENTS AT 220 KV SUBSTATION SIDCUL HARIDWAR
2023_PTCUX_56815_1
T-43/SEOANDM/CR/2022-23
Open Tender
Electrical Works
Item Rate
365 days
SIDCUL Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
SE O and M Circle Roorkee
₹30,000
Yes
7 Sept 2023
29 Mar 2023
29 Apr 2023
29 Mar 2023
28 Apr 2023
29 Mar 2023
Amount
Following Work to be carried out for preventive maintenance of 2 No. 160 MVA T/F (220/132 KV), 2 No. 80 MVA T/F (132/33 KV), 1 No. 50 MVA T/F (220/33 KV & 1 No. 25 MVA T/F (220/33 KV) (Two times in a year 6 x 2 times = 12). 1. Checking of Oil level in main & OLTC conservator tank & bushings. 2. Attending minor Oil leakage/ seepage from main body/conservator tank/radiator of transformer by tightening. 3. Tightening of all bushing clamps & replacement of damage/defected clamps & connectors. 4. Rectification of electrical fault of auto/ manual operation of cooling fans by replacement of electrical equipment like contactor, MCB, relay etc. 5. Tightening of neutral & main body earthling. 6. Cleaning & washing of transformer main tank/ radiator etc. 7. Tightening of all electrical connections in Transformer Marshalling Box & apply CRC on all connections/ connectors/relays etc. 8. Testing of WTI & OTI and Buchholz relay & PRV. 9. Checking of earth resistance. 10. Replacement of Jumpers of conductor including clamps, cutting/drilling in holes in clamps. 11. Work of special maintenance on breakdown/crisis basis/fault tracing & removal or any other work as per site requirement or as per direction of site incharge. .
Following work to be carried out for Preventive maintenance of 220 KV, 132 KV, 220/132 KV, 220/33 KV Isolators (Two times in a year 28 x 2 times = 56). 1. Tightening of clamps and connectors & replace if found damage/defective. 2. Cleaning of porcelain insulators by CTC and checking of damage. 3. Replacement of rusted nut/bolts of Isolator/ hardware fittings. 4. Tightening of male and female contacts and replace if found damage/defective. 5. Apply petroleum jelly between male/female contacts. 6. Tightening of earth link and its jaws. 7. Alignment of isolator and earth link. 8. Lubrication of all moving parts. 9. Testing of drive motor in cubical. 10. Tightening of all connections in Bay Marshalling Box. 11. Apply CRC on all connections in cubical. 12. Replacement of Jumpers of conductor including clamps, cutting/drilling in holes in clamps. 13. Work of special maintenance on breakdown/crisis basis/fault tracing & removal or any other work as per site requirement or as per direction of site incharge.
Following work to be carried out for Preventive maintenance of 220 KV Bay, 132 KV Bay, 220/132 KV Bay & 220/33 KV Bay Equipments. i.e. CB/CT/PT/CVT/LA/Wave Trap (if installed) (Two times in a year 78 x 2 times = 156 ). 1. Top up of oil after checking of oil level in CT/PT/CVT. 2. Checking of oil leakage and rectification if found. 3. Checking and tightening of clamps & Connectors etc. 4. Replacement of rusted nut/bolts if found damage in hardware fitting. 5. Checking and tightening of equipments earthling. 6. Checking the healthiness of surge arrester. 7. Filling of SF-6 Gas in Circuit Breaker under breakdown/preventive maintenance including shifting of SF-6 gas cylinder. 8. Replacement of Jumpers of conductor including clamps, cutting/drilling in holes in clamps. 9. Work of special maintenance on breakdown/crisis basis/fault tracing & removal or any other work as per site requirement or as per direction of site incharge.
Taking specific gravity of individual cell (110 cells) of battery set and record in battery register & checking level of electrolyte in the cell and filling of distilled water by making of distill water in distill water plant as per requirement.
Cleaning of bettery terminals and apply petrolium jelly on the terminals & cleaning of battery set rack.
Cleaning & maintenance of distill water plant by replacement of heating element, switches & cabling etc.
Checking of voltage of individual cell after turning off the battery charger of each battery set.
Chirag Construction company
M/s Singhal and Co
KOTHARI ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .