Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹42.5 L+₹8.3 L (24.2%)Admitted-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L2 | Admitted-Finance | |
| 3 | L3₹43.3 L+₹9.0 L (26.3%)Admitted-Finance 5 9 35 HAZARHAT KALITALALANE HOWRAH 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | L3 | Admitted-Finance | |
| 4 | Rejected-Technical 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | - | Rejected-Technical Administrativeve reason |
| Sl No | Description | Qty | Unit | ASSOCIATE ENGINEERS L1 | TECHNO ENGINEERING L2 | S D CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Overhauling of Burner & coal Pipe | ||||||
| 1.01 | Coal & Oil Burner work (100%) | 1 | Lumpsum | 7,16,000 ₹7,16,000 Lowest | 8,87,433 ₹8,87,433 | 9,02,457 ₹9,02,457 |
| 1.02 | Replacement of Insulation
cover plates of wind box after Fabrication. | 1 | Lumpsum | 1,36,000 ₹1,36,000 Lowest | 1,69,515 ₹1,69,515 | 1,72,385 ₹1,72,385 |
| 1.03 | Replacement/Repair of MPO
MDV & Transition Piece | 72 | pieces | 6,905 ₹4,97,160 Lowest | 8,556 ₹6,16,032 | 8,701 ₹6,26,472 |
| 1.04 | Replacement of Coal Pipe Orifices | 28 | pieces | 6,905 ₹1,93,340 Lowest | 8,556 ₹2,39,568 | 8,701 ₹2,43,628 |
| 1.05 | Replacement of Mill Outlet Elbow | 24 | pieces | 8,000 ₹1,92,000 Lowest | 10,029 ₹2,40,696 | 10,199 ₹2,44,776 |
| 1.06 | Servicing of Rockwell Coupling | 48 | pieces | 12,100 ₹5,80,800 Lowest | 15,037 ₹7,21,776 | 15,292 ₹7,34,016 |
| 1.07 | Replacement of CCP Bends like Ceramic Bend & Offset Bend etc. | 18 | pieces | 8,000 ₹1,44,000 Lowest | 10,029 ₹1,80,522 | 10,199 ₹1,83,582 |
| 1.08 | Replacement of Straight Coal Pipe | 200 | Meter | 4,053 ₹8,10,600 Lowest | 5,021 ₹10,04,200 | 5,107 ₹10,21,400 |
| 1.09 | Hanger Support Servicing | 1 | Lumpsum | 28,050.75 ₹28,050.75 Lowest | 34,755 ₹34,755 | 35,434 ₹35,434 |
Tender Value
₹36.0 L
EMD Value
₹72,100
Closing Date
13 Feb 2026, 2:00 pmClosed
GM(K)
GM bldg, KTPS, Mecheda, Purba Medinipur 721137
Service contract for overhauling of Coal Burner and Coal Pipe during overhauling of Unit 6 under BM dept
2026_WBPDC_990410_1
GMOH(6K)/CC/BM/3775/E3711
Open Tender
Support/Maintenance Service
Item Rate
Tender Opening Halll, GM bldg, KTPS, Mecheda
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹72,100
Yes
Conference Hall, GM bldg, KTPS, Mecheda, Purba Me
12 Aug 2026
20 Jan 2026
17 Feb 2026
20 Jan 2026
13 Feb 2026
29 Jan 2026
27 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Overhauling of Burner & coal Pipe | |||||
| 1.01 | Coal & Oil Burner work (100%) | 1 | Lumpsum | - | - |
| 1.02 | Replacement of Insulation
cover plates of wind box after Fabrication. | 1 | Lumpsum | - | - |
| 1.03 | Replacement/Repair of MPO
MDV & Transition Piece | 72 | pieces | - | - |
| 1.04 | Replacement of Coal Pipe Orifices | 28 | pieces | - | - |
| 1.05 | Replacement of Mill Outlet Elbow | 24 | pieces | - | - |
| 1.06 | Servicing of Rockwell Coupling | 48 | pieces | - | - |
| 1.07 | Replacement of CCP Bends like Ceramic Bend & Offset Bend etc. | 18 | pieces | - | - |
| 1.08 | Replacement of Straight Coal Pipe | 200 | Meter | - | - |
| 1.09 | Hanger Support Servicing | 1 | Lumpsum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_2420902.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .