Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹14.4 L+₹29,054.80 (2.05%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹14.4 L
EMD Value
₹36,200
Closing Date
20 Feb 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer,Irrigation Division,Ernakulm,
Desilting
2020_Irrig_341873_1
42/EE/I/2019-20/S(RT)
Open Tender
Civil Works - Others
Item Rate
120 days
Chellanam
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,750
online
₹36,200
Yes
27 Aug 2020
7 Feb 2020
24 Feb 2020
7 Feb 2020
20 Feb 2020
7 Feb 2020
7 Feb 2020 - 20 Feb 2020
Amount
SCHEME 1 (CHAINAGE 0 -115 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 2 (CHAINAGE 115 - 220 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 3 (CHAINAGE 220 -322)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 4 (CHAINAGE 322 - 450)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 5 (CHAINAGE 450 -565 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 6 (CHAINAGE 565 -680)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 7 (CHAINAGE 680-860)
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 8 (CHAINAGE 860 - 1080)
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 9 (CHAINAGE 1080 - 1300)
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 10(CHAINAGE 1300 -1520)
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 11 (CHAINAGE 1520 -1740)
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 12 (CHAINAGE 1740 -1897)
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
QUBE CONSTRUCTION
Bidder Name
QUBE CONSTRUCTION
MUHAMMED ALSIFE K S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_478068.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .