| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹3.0 L (2.64%)Admitted-Finance | ₹1.2 Cr+₹3.0 L (2.64%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ASHISH ELECTRIC DECORATORS L2 | BHASKAR JYOTI (INDIA) (OPC) PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:-
a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730- Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 17.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency.
c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required.
Pannel make - TATA, Vikram, Adani, Saatvik, Renesys, Waaree
Inverter make - Sungrow, Growatt, Waaree, Polycab, ABB | 225 | KWp | 48,970 ₹1,10,18,250 | 46,500 ₹1,04,62,500 Lowest |
| 2.00 | All in one comprehensive Operation & Maintainance of solar plant system including cleaning three times in a month, JVVNL related work, maintain register & etc. for 5 years. | 13,500 | Job per KWp per month | 39 ₹5,26,500 Lowest | 54 ₹7,29,000 |
| 3.00 | DISCOM charges including meter tasting, Charges related to electrical inspector,LTCT tasting, stamp paper/notery etc. | 1 | Job | 1,48,000 ₹1,48,000 Lowest | 2,00,000 ₹2,00,000 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
25 Aug 2023, 6:00 pmClosed
Mr. Dharmendra Kumar Soni
BIDA, BHIWADI
As per td
2023_BIDA_358370_1
ONLINE NIT-10/2023-24 WORK 9
Open Tender
Civil Works
Item Rate
90 days
BIDA BHIWADI
As per td
2 documents required · 2 mandatory
₹2,360
C.E.O. BIDA
₹2.7 L
Yes
8 Sept 2023
16 Aug 2023
28 Aug 2023
16 Aug 2023
25 Aug 2023
16 Aug 2023
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Terms_and_conditions.pdf
Tender Documents • 0.35 MB
BOQ_636926.xls
BOQ • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .