Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.5 LAccepted-Finance S A 6 149 D 3 SHIV BIHAR COLONY AKTHA PAHADIYA VARANASI | AMBEDKAR NAGAR | UTTAR PRADESH | 224122 | L1 | Accepted-Finance First Lowest | |
| 2 | L2₹60.0 L+₹41,325.39 (0.69%)Accepted-Finance 494A RAILWAY COLONY 829104 KARGALI BERMO BOKARO JHARKHAND 829104 INDIA | BOKARO | JHARKHAND | 829104 | L2 | Accepted-Finance Second Lowest | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Ramesh Tiwari L1 | ANIL KUMAR SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M. | 13.2 | Cum. | 621 ₹8,197.2 Lowest | 623 ₹8,223.6 |
| 2.00 | Dismantling brick or stone work in line or cement mortar including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M. | 138.9 | Cum. | 293.75 ₹40,801.88 Lowest | 294 ₹40,836.6 |
| 3.00 | Earth work in excavation in foundation in ordinary/sandy loam, clay or sand including lift up to 1.5 m. and lead up to 30.00m. and including filling, watering, ramming of excavated earth in to the trenches or up to the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc. | 580.6 | Cum. | 99.75 ₹57,914.85 Lowest | 100 ₹58,060 |
| 4.00 | Providing and laying of local sand filling of below of concrete including cost of all labour, material, T&P, etc. | 62.5 | Cum. | 1,347.5 ₹84,218.75 Lowest | 1,348 ₹84,250 |
| 5.00 | C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 20 – 40 mm including all material, labour, T&P etc. | 100.9 | Cum. | 6,000 ₹6,05,400 Lowest | 6,020 ₹6,07,418 |
| 6.00 | C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and Brick ballast 20 – 40 mm including all material, labour, T&P etc. | 9.9 | Cum. | 4,253 ₹42,104.7 Lowest | 4,253.25 ₹42,107.18 |
| 7.00 | Shuttering & Centering for slab and bed block including all material, labour, T&P, etc. | 904.6 | Sqm. | 731.75 ₹6,61,941.05 Lowest | 732 ₹6,62,167.2 |
| 8.00 | Reinforcement work in slab and bed block with cutting, bending, placing, binding including all material, labour, binding wire, T&P etc. | 19.23 | M. T. | 90,000 ₹17,30,700 Lowest | 91,050 ₹17,50,891.5 |
| 9.00 | R. C. C. with M-20 (1:1.5:3) in slab and bed block with cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size with mechanically mixed and mechanically compaction including all cast of material, labour, T&P etc. | 239.4 | Cum. | 8,925 ₹21,36,645 Lowest | 9,000 ₹21,54,600 |
| 10.00 | Wearing coat and Trough floor with M-20 (1:1.5:3) in cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size mm with mechanically mixed including all cast of material, labour, T&P etc. | 8.8 | Cum. | 8,700 ₹76,560 Lowest | 8,750.05 ₹77,000.44 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
8 Sept 2025, 2:00 pmClosed
SE Irrigation Works Circle Varanasi
SE Irrigation Works Circle Sigra Varanasi
Reconstruction of R.C.C. Box Culvert at Km. 25.600 of Chandauli Main Canal
2025_UPIDC_1069058_5
02/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Village Bhagwanpur Post Seruka Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.2 L
24 Sept 2025
2 Sept 2025
8 Sept 2025
2 Sept 2025
8 Sept 2025
2 Sept 2025
Amount
Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M.
Dismantling brick or stone work in line or cement mortar including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M.
Earth work in excavation in foundation in ordinary/sandy loam, clay or sand including lift up to 1.5 m. and lead up to 30.00m. and including filling, watering, ramming of excavated earth in to the trenches or up to the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc.
Providing and laying of local sand filling of below of concrete including cost of all labour, material, T&P, etc.
C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 20 – 40 mm including all material, labour, T&P etc.
C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and Brick ballast 20 – 40 mm including all material, labour, T&P etc.
Shuttering & Centering for slab and bed block including all material, labour, T&P, etc.
Reinforcement work in slab and bed block with cutting, bending, placing, binding including all material, labour, binding wire, T&P etc.
R. C. C. with M-20 (1:1.5:3) in slab and bed block with cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size with mechanically mixed and mechanically compaction including all cast of material, labour, T&P etc.
Wearing coat and Trough floor with M-20 (1:1.5:3) in cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size mm with mechanically mixed including all cast of material, labour, T&P etc.
Earthwork in filling back side of abutment, wing wall and other structure with manual compection and dressing including cost of all labour, T&P ect.
C.C. with M-15 (1:2:4) in curtain wall, energy disipetor and base of aproch slab with cement, coarse and F.M. above and crushed stone grit 10-20 MM and 4.75-10MM size with mechanically mixed including all cost of material, labour,T&P, etc.
Double flat brick lining in bed of canal with one part of cement and three part of coarse sand FM 1.5-2 mortar including all cost of material, labour,T&P, etc.
Deep struck pointing on top of Double flat brick lining surface one part cement and two part of coarse sand FM 1.5-2 mortar including all cost of material, labour,T&P, etc.
Finishing wall with water proof cement paint of approved make such as super snowcat of required shade on new wall surface two coat over one coat primer. with this paint to give an even shade after thoroughly brushing the surface to remove all, dirt and remains loose powdered materials including curing and cost of all materials. including cost of all Material, labour T&P etc. required for proper completion
Supplying and fixing of wheel guard stone including cost of all material, labour, t&p etc.
Earth work in correcting external section of canal by J.C.B. machine including partial compaction in layers with total lead up to 1.00 km. by Tractor Trolly and lift of 5.0 m including cost of all labour t&p etc.
Earth Work in dismantling of Diverted Road by J.C.B./Porcelain machine including side slope cutting at required slope with lead lift in all types of soils with disposal on daula and top and outer slope of banks as per directed by site in charge, including spreading and partial dressing including cost of all labour t&p etc.
Fabrication and Supplying of Sign board on angle iron framed 40x40x6 mm and 25x5 mm flat and 16 SWg M. S. sheet board size 1200 x 900 with one coat red oxide primer and two coat approved synthetic enamel paint and lettering, transporting, fixing, of Sign board at head of canals with fixing by M-10 C. C. including cost of all material, labour as, T&P, etc. as per directed by Engineer-in-charge.
ANIL KUMAR SINGH (BID ID -5518055)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .