| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC as per WO |
| 2 | L2₹3.0 L+₹5,878.70 (2.00%)Rejected-Finance | ₹3.0 L+₹5,878.70 (2.00%) | L2 | Rejected-Finance as per TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical as per TCR |
| Sl No | Description | Qty | Unit | SUMIT KUMAR ROY L1 | M/S NEW ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | (Part-A) Repairing & Rewinding of 03 nos. 55KW Induction Motor Cost of new copper wire 19,20 no Gage | 132 | kg | 875 ₹1,15,500 Lowest | 875 ₹1,15,500 Lowest |
| 2.00 | Cost of insulating Material | 3 | Nos | 5,775 ₹17,325 Lowest | 5,775 ₹17,325 Lowest |
| 3.00 | Repairing of Bearing housing (DE) | 3 | Nos | 2,500 ₹7,500 Lowest | 2,500 ₹7,500 Lowest |
| 4.00 | Repairing of Bearing housing (NDE) | 3 | Nos | 2,500 ₹7,500 Lowest | 2,500 ₹7,500 Lowest |
| 5.00 | New making of joint box | 3 | Nos | 3,200 ₹9,600 Lowest | 3,200 ₹9,600 Lowest |
| 6.00 | Connection Lead 4mm | 12 | Mtr | 400 ₹4,800 Lowest | 400 ₹4,800 Lowest |
| 7.00 | Replacement of Ball Bearing 6317 | 3 | Nos | 14,109 ₹42,327 Lowest | 14,109.32 ₹42,327.96 |
| 8.00 | Labour Cost | 3 | Nos | 10,227.25 ₹30,681.75 Lowest | 10,277.65 ₹30,832.95 |
| 9.00 | Less Scrap Value 60% of New copper wire | 3 | Nos | 23,100 ₹-69,300 Lowest | 23,100 ₹-69,300 Lowest |
| 10.00 | contractor profit | 3 | Nos | 8,296.8 ₹24,890.4 Lowest | 8,296.8 ₹24,890.4 Lowest |
Tender Value
₹3.5 L
EMD Value
₹4,500
Closing Date
2 Feb 2026, 6:00 pmClosed
PE(EnM) Officer SND-D Project
PE(EnM) Office SND-D Project
Repairing of 03 Nos. of 55KW and 01 No. 75KW Motor, 550V,1140 RPM of Saunda-D Colleiry.
2026_CCL_351583_1
PE(EnM)/SND-D/e Tender/25-26/14
Open Tender
Electrical and Maintenance Works
Item Wise
15 days
Saunda-D Project
please refer Tender document
2 documents required · 2 mandatory
₹4,500
25 Mar 2026
21 Jan 2026
3 Feb 2026
22 Jan 2026
2 Feb 2026
22 Jan 2026
22 Jan 2026 - 26 Jan 2026
(Part-A) Repairing & Rewinding of 03 nos. 55KW Induction Motor Cost of new copper wire 19,20 no Gage
Cost of insulating Material
Repairing of Bearing housing (DE)
Repairing of Bearing housing (NDE)
New making of joint box
Connection Lead 4mm
Replacement of Ball Bearing 6317
Labour Cost
Less Scrap Value 60% of New copper wire
contractor profit
(PART-B) Repairing & rewinding of 01 no. 75 kw induction Motor Cost of new copper wire 16,17 No. Gage
Cost of insulating Material
Repairing of Bearing housing (NDE)
Repairing of Motor Slot
Connection Lead 6mm
Replacement of Roller Bearing NU316
Replacement of Ball Bearing 6316
Labour Cost
Less Scrap Value 60% of New copper wire
contractor profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_364345.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .