Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC PLOT NO 729 INDUSTRIAL AREA PHASE 2 | ₹27.9 L | L1 | Accepted-AOC LOA |
| 2 | L2₹31.8 LRejected-Finance B 1703 MODERN INDUSTRIAL ESTATE BAHADURGARH HARYANA 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹31.8 L | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | Hemcool Engineers L2 | PRINCE AIRCON L1 |
|---|---|---|---|---|---|
| 1.00 | [23.22.1.9]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.9. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 6 amp to 100 amp , 25 KA [Through Rate] | 1 | Each | 25,000 ₹25,000 | 13,000 ₹13,000 |
| 2.00 | [23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate] | 4 | Each | 23,000 ₹92,000 | 12,500 ₹50,000 |
| 3.00 | `Inverter based VRF System -
`Supply, installation testing and commissioning of Air Cooled VRV/VRF units with Rotary /scroll Compressor capable of modulating capacity ,i,e it should be able to vary speed of the compressor as per the varying load conditions and works on R410A with heating and cooling both.The outdoor unit shall be a factory assembled unit housed in a sturdy weather proof casing constructed form rust-proofed mild steel panels coated with powder coated finish. Each ODU should have variable compressors. Each unit shall be equipped, with an oil separator to ensure stable operation with long refrigerant piping.Note:- Variable refrigerant flow modular type air- conditioning system suitable for Cooling/Heating by inverter driven capacity control compressor Outdoor unit having minimum COP at 100% Load to be ) 3.5 as per ARI Conditions complete in all respect upto entire satisfaction Engineer in charge of work. The manufacturer of ODU and compressor shall be same. i.e the make of compressor shall be identical of the ODU. Makes: Mitsubishi Electric, O General, LG .
Outdoor units. 22HP | 1 | Each | 4,90,000 ₹4.9 L | 4,10,000 ₹4.1 L |
| 4.00 | `4 WAY CASSETTE INDOOR -
`Supply, installation testing and commissioning of indoor units with evaporator coil, fan and fan motor drain pump drain pan and Grille pannel. The units shall be of following capacities :Makes: Mitsubishi Electric, O General, LG, Hitachi .
4.5 TR
` ` | 1 | Each | 55,000 ₹55,000 | 51,500 ₹51,500 |
| 5.00 | `4 WAY CASSETTE INDOOR( 2X2) - EXTRA ITEM
`Supply, installation testing and commissioning of indoor units with evaporator coil, fan and fan motor drain pump drain pan and Grille pannel. The units shall be of following capacities :Makes: Mitsubishi Electric, O General, LG, Hitachi - 2 TR
` ` | 10 | Each | 46,000 ₹4.6 L | 44,600 ₹4.5 L |
| 6.00 | `AHU 13.0 TR-5200 CFM -
`Supply, installation testing and commissioning of indoor units with 6 Row Deep evaporator coil, fan and fan motor drain pump drain pan and Grille pannel. The units shall be of following capacities :Makes: EDGETECH/ZECO
13 TR `
` ` | 3 | Each | 2,30,000 ₹6.9 L | 2,28,000 ₹6.8 L |
| 7.00 | `AHU 4.0 TR-1600 CFM -
`Supply, installation testing and commissioning of indoor units with 6 Row Deep evaporator coil, fan and fan motor drain pump drain pan and Grille pannel. The units shall be of following capacities :Makes: EDGETECH/ZECO
4 TR `
` ` | 3 | Each | 1,10,000 ₹3.3 L | 1,02,500 ₹3.1 L |
| 8.00 | `SITC of Remotes (Corded) `
` ` | 18 | Each | 2,000 ₹36,000 | 1,590 ₹28,620 |
| 9.00 | `SITC of REFNETS `
` ` | 14 | Each | 5,000 ₹70,000 | 4,400 ₹61,600 |
| 10.00 | `SITC of Refrigerant Piping of
`Interconnecting refrigerant pipe work with (19mm/13 mm thick) closed cell elastomeric nitrile rubber tubular insulation betweeneach set of indoor and outdoor units as per specifications, all piping inside the building shall be properly supported with MS hanger complete in all respect upto entire satisfaction Engineer in charge of work. Make: Mandev, Maxflow, Totaline.
41.3 mm OD (19mm insulation) `
` ` | 10 | Metre | 1,800 ₹18,000 | 1,780 ₹17,800 |
Tender Value
₹28.6 L
EMD Value
₹57,260
Closing Date
8 Jan 2026, 5:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Upgradation of VRF System in Shri Krishna Museum in Distt. Kurukshetra (Pdg. Additional Air Conditioning work for Auditorium block).
2026_HRY_494313_1
20262D6CB143 9D62 465E 8F99 2A434F0B7C68663BAR
Open Tender
Civil Works
55 days
Ambala
Upgradation of VRF System in Shri Krishna Museum in Distt. Kurukshetra (Pdg. Additional Air Conditioning work for Auditorium block).
2 documents required · 2 mandatory
₹5,000
₹57,260
Yes
31 Mar 2026
1 Jan 2026
9 Jan 2026
2 Jan 2026
8 Jan 2026
2 Jan 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer Electrical Division PWD B&R Br., Ambala Cantt
Name of Work: Upgradation of VRF System in Shri Krishna Museum in Distt. Kurukshetra (Pdg. Additional Air Conditioning work for Auditorium block).
Estimated Cost Rs. 28.63 lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. HSR Items / Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 [23.22.1.9]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.9. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. 4 pole MCCB 6 amp to 100 amp , 25 KA [Through Rate] BI01010001010000000000000515BI0100001113 Each Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_572755.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid