| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC 154 GANDHI MARKET AMBALA CANTT HARYANA 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹6.0 L+₹1.3 L (26.7%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | Esha Engineers L1 | MM Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes, for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and directed. | 86 | Cubic Metre | 200 ₹17,200 | 90 ₹7,740 Lowest |
| 2.00 | Returning, filling in, in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. | 55 | Cubic Metre | 40 ₹2,200 | 15 ₹825 Lowest |
| 3.00 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | 30 | Cubic Metre | 40 ₹1,200 | 15 ₹450 Lowest |
| 4.00 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable ) complete all as specified and directed. | 25 | Cubic Metre | 450 ₹11,250 Lowest | 450 ₹11,250 Lowest |
| 5.00 | Material and labour for bricks, common burnt clay, sub class "B', old size, laid perpendicular direction to cable as cable protection complete all as specified and directed. | 2.5 | Per 1000 Nos | 4,000 ₹10,000 Lowest | 5,500 ₹13,750 |
| 6.00 | Material and labour for cement concrete (1:3:6) type C-1 using 20mm graded crushed stone aggregate as in coping of panel base / pole and strut, stay around the pole and making good the distrubed surface etc complete all as specified and directed. | 2 | Cubic Metre | 3,000 ₹6,000 | 2,990 ₹5,980 Lowest |
| 7.00 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete all as specified and directed. (Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately). | 60 | Running Metre | 20 ₹1,200 Lowest | 65 ₹3,900 |
| 8.00 | Material, labour, connecting and testing of XLPE underground cable insulated, and overall sheathed with aluminium conductor heavy duty 1100 volts grade 50 sqmm 3.5 core laid in trenches/ on pole/road crossing or passing through existing/new pipe under road crossing clamping on wall etc including taking down of Old LT PVC cable complete all as specified and directed.
Note : (i) Earth work, sand, bricks removing, returning filling will be paid seperately.
(ii) Cost of laying electrical cable through new/existing pipe under road, buildings, railway tracks, highways are incl in the quoted rates.
(iii) All equiments, machinery or tool if required for laying electrical cable through new/existing pipes are provided by the contractor without any extra cost. | 180 | Running Metre | 350 ₹63,000 Lowest | 370 ₹66,600 |
| 9.00 | All as per Ser item No 8.00 here in before but for 3.5 core150 Sqmm.
Note : It is a provision to enhence the Electrical network hence no taking down (Credit ) for this particular item considered. | 160 | Running Metre | 870 ₹1,39,200 Lowest | 970 ₹1,55,200 |
| 10.00 | Material and labour for HDPE double wall corrugated pipe 50mm bore with all fittings, laid under roads, drain, paths, fixed to poles/walls with suitable mild steel clamps, bolts, nuts and washers complete all as specified and directed.
Note:- Excavation, earth work & PCC shall be encluded in quoted rate. | 60 | Running Metre | 90 ₹5,400 | 75 ₹4,500 Lowest |
Tender Value
₹6.5 L
EMD Value
₹13,100
Closing Date
1 Jun 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
ADDITIONS AND ALTERATIONS OF LT ELECTRIC NETWORK SYSTEM WITH ALLIED WORKS AT DEO UNDER GE UTILITY AMBALA CANTT
2026_MES_764478_1
CA NO GE U AMB 40 OF 2026-27
Open Tender
Civil Works
Item Rate
120 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE UTILITY AMBALA CANTT
₹13,100
22 Jun 2026
9 May 2026
3 Jun 2026
9 May 2026
1 Jun 2026
25 May 2026
9 May 2026 - 16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes, for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and directed. | 86 | Cubic Metre | - | - |
| 2 | Returning, filling in, in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. | 55 | Cubic Metre | - | - |
| 3 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | 30 | Cubic Metre | - | - |
| 4 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable ) complete all as specified and directed. | 25 | Cubic Metre | - | - |
| 5 | Material and labour for bricks, common burnt clay, sub class "B', old size, laid perpendicular direction to cable as cable protection complete all as specified and directed. | 2.5 | Per 1000 Nos | - | - |
| 6 | Material and labour for cement concrete (1:3:6) type C-1 using 20mm graded crushed stone aggregate as in coping of panel base / pole and strut, stay around the pole and making good the distrubed surface etc complete all as specified and directed. | 2 | Cubic Metre | - | - |
| 7 | Disconnecting & taking out defective underground cable from trenches, pole, pipe, floor, wall etc and locate the fault, rectify the defect and relaying the XLPE cable underground PVC insulated and overall sheathed aluminum conductor heavy duty 1100 volts including connecting and testing for any size complete all as specified and directed. (Excavation/earth work & sand cushioning, bricks and joint shall be measured & paid for separately). | 60 | Running Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_856270.xls
BOQ • 0.60 MB
Tender.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .