Loading…
Loading…
Tender Value
₹2.3 L
Closing Date
14 Oct 2026, 3:00 pm
The Executive Engineer City-I (East) Bilaspur
Estimate for 11 KV Line Shifting to Rajendra C Kusum SSE/ElECT/Con/R,South East Central Railway at Near Railway Line ,Sec-B,Ind.Area Sirgitti Bilaspur U/n Sirgitti Zone City Dn. I (East) CSPDCL, Bilaspur. B43035250940
108178
EE/CITY DN - I /BSP/2026-27/ T-19
Chhattisgarh
24 Sept 2026
24 Sept 2026
14 Oct 2026
Materials for 11 KV LINE Estimate for 11 KV Line Shifting to Rajendra C Kusum SSE/ElECT/Con/R,South East Central Railway at Near Railway Line ,Sec-B,Ind.Area Sirgitti Bilaspur U/n Sirgitti Zone City Dn. I (East) CSPDCL, Bilaspur.
1535/07.08.2026 366,080.00 WITH GST WITHOUT GST
S.NO B43035250940 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
2 11KV cut point channel 2 NO 3,829.65 7,659.30 3245.47 6490.93
3 11KV 45KN DISC INSULATOR T&C TYPE (POLYM 6 NO 122.72 736.32 104.00 624.00
4 11 KV Strain hardware fittings. 6 NO 158.71 952.26 134.50 807.00
5 11KV 5KN PIN INSULATOR (POLYMER) 14 NO 135 1,890.00 114.41 1601.69
6 M S NUTS AND BOLTS: - 16x40mm 2 KG 87.55 175.10 74.19 148.39
7 M S NUTS AND BOLTS: - 16x65mm 5 KG 86.09 430.45 72.96 364.79
8 M S NUTS AND BOLTS: - 16x140mm 5 KG 84.63 423.15 71.72 358.60
10 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M 5 NO 149.25 746.25 126.48 632.42
12 G.I. WIRES: - Barbed wire. 4 KG 86.44 345.76 73.25 293.02
16 STAY SET WITHOUT STAY WIRE16mm Paint11KV 2 NO 585.42 1,170.84 496.12 992.24
18 Stay clamp LT/Pair 2 NO 334.5 669.00 283.47 566.95
19 ACSR CONDUCTOR 0.05 Sqmm (50 Sqmm Al q) 927 M 54.3 50,336.10 46.02 42657.71
INCIDENTIAL CHARGES 0.075 14033.57
TOTAL 201147.77
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
2 Tree cutting Km.
3 Approach Clearance Km.
5 Stay Pit digging No. 2 334.05 668.11 283.10 566.19
6 Transportation of pole from road side to pole pit for a lead of 1 Km. No. 6 691.15 4,146.88 585.72 3514.30
7 Shifting of materials to pole pits No. 6 70.18 421.09 59.48 356.85
8 Cross arm fixing complete with top clamp No. 1 103.67 103.67 87.86 87.86
9 Pole erection complete (including earthing) No. 2 1843.06 3,686.11 1,561.91 3123.83
10 Concreting of stay and poles Cft. 133.2 0.00 0.00 0.00 0.00
11 Stay erection complete No. 2 230.38 460.76 195.24 390.48
12 Insulator fixing with GI Pin No. 6 23.56 141.37 19.97 119.80
13 Anti climbing devices and danger board fixing No. 5 99.40 496.99 84.24 421.18
14 Painting of Pole, Cross arm and numbering of poles including steel pole. No. 5 115.19 575.96 97.62 488.10
15 Carpet guarding Span 0 1672.82 0.00 1,417.64 0.00
16 Twisting of jointing sleeves No. 0 74.03 72.16 62.74 0.00
17 Stringing of line (Rabbit) all three conductor No. 0.309 11519.11 3,559.40 9,761.95 3016.44
18 Dismentaling Charges LS 1 6000.00 6,000.00 5,084.75 5084.75
19 transportation charges LS 1 3700.00 3,700.00 3,135.59 3135.59
TENDER AMOUNT 225011.14
TOTAL BILL OF QUANTITY FOR MATERIAL TO BE PROVIDED BY THE CONTRACTOR
S.No Name of Work Estimate No. Work Order & Date Estimate Amount Tender Amount Diff Amount (E-H)
Material Services Total (F+G)
A B C D E F G H I
1 Estimate for 11 KV Line Shifting to Rajendra C Kusum SSE/ElECT/Con/R,South East Central Railway at Near Railway Line ,Sec-B,Ind.Area Sirgitti Bilaspur U/n Sirgitti Zone City Dn. I (East) CSPDCL, Bilaspur. B43035250940 1535/07.08.2026 366,080.00 201148 23863.37 225011.14 141,068.86
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.01 MB
259879-NIT_TD108178.pdf
pdf • 0.28 MB
259880-BOQ_TD108178.xlsx
xlsx • 0.02 MB
259881-TENDER_DOC_TD108178.pdf
pdf • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .