| Sl No | Description | Qty | Unit | M FAIZAL L2 | N.Satheesan L1 |
|---|---|---|---|---|---|
| 1.00Construction of canal road | |||||
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 441 | sqm | 33 ₹14,553 | 31.74 ₹13,997.34 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 66.27 | cum | 8,450 ₹5.6 L | 8,306.83 ₹5.5 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 49.8 | sqm | 340 ₹16,932 | 347.31 ₹17,296.04 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 34.8 | cum | 3,700 ₹1.3 L | 3,591.73 ₹1.2 L |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 210 | sqm | 17 ₹3,570 | 16.36 ₹3,435.60 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 4.8 | cum | 250 ₹1,200 | 231.71 ₹1,112.21 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.35 | cum | 8,300 ₹44,371.80 | 7,707.08 ₹41,202.05 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 7.29 | sqm | 340 ₹2,478.60 | 309.2 ₹2,254.07 |
| 1.01 | 5.26:Providing and filling in position, blow bitumen in expansion joints. | 0.02 | cum | 80,000 ₹1,600 | 72,044.49 ₹1,440.89 |
Tender Value
₹8.4 L
EMD Value
₹21,020
Closing Date
31 Oct 2025, 11:00 amClosed
Assistant Executive Engineer
KIP Sub Division No 1 Adoor
MP LADS MP LADS Construction of Kalathivila Kanjirakutti Canal road in ward no 8 of Poruvazhy Panchayath General Civil Work
2025_Irrig_807758_2
IRR/PII/TR/4773/2025_5_1_1/1
Open Tender
Civil Works - Canal
90 days
Poruvazhy
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,855
Yes
₹21,020
Yes
7 Jan 2026
23 Oct 2025
1 Nov 2025
23 Oct 2025
31 Oct 2025
23 Oct 2025
Amount
Construction of canal road
2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.26:Providing and filling in position, blow bitumen in expansion joints.
M FAIZAL (BID ID -2419234)
Bidder Name
M FAIZAL
N.Satheesan
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1360734.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.86 MB
viewnit.pdf
Other Document • 0.03 MB
BOQ_1360734.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid