Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VILLAGE SHAGAG P O SARAHAN TEHSIL RAMPUR DISTT SHIMLA H P | SARAHAN | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
| 2 | Admitted-Finance VILLAGE AND POST OFFICE JEORI TEHSIL RAMPUR DISTT SHIMLA H P | JEORI | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
Tender Value
₹47.6 L
EMD Value
₹95,267
Closing Date
28 Feb 2024, 9:00 amClosed
EE
EE B and R Division HPPWD Rampur
SH C.O approach road and removal of road side slip at various RDs across the approach
2024_PWD_86751_1
PW/RMP/TA/2023-20094 dated 14.02.2024
Open Tender
Civil Works - Roads
Item Rate
EE B and R Divisoin HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
Yes
EE Rampur
₹95,267
28 Feb 2024
22 Feb 2024
28 Feb 2024
22 Feb 2024
28 Feb 2024
22 Feb 2024
22 Feb 2024 - 28 Feb 2024
Amount
Cutting in earth work in all height and all heights and all kinds of soils such as spade work, pick work, jumper work, blasting work, soft rock, hard rock chiseling work and wedgiong out of rocks where blasting is prohibited including their intermediate classification of soil including sturated soil and disposal of all excavated unserviceable material all leads and lifts to avoid damages to the properties of the public and Govt. All seful material/stones available from blasting/chiseling shall be property of department and minimum 1409.58cum stones available from blasting shall have neatly stacked at suitable place as directed by the Engineer-in-charge. otherwise recovery @300/- per cubic meter shall be effected from the bill of the contractor. The road 5/7 meter wide 5 meter in straight and 7 mete in curves.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil including carriage of material within all leads and lifts and as per HP.PWD., specifications of 1990 volume-I and as per direction of Engineer-in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and laying concrete 1:4:8 (1 cement :4 sand:8 graded stone aggregate 40mm nominal size) for plain/reinforced conrete inopen foundaitons complete as per drawing and technical specificaiton clauses 802,803,1202 and 1203 including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-charge.
Providing and laying of boulder apron laid in wire crates with 4mm dia G.I. wire conforming to IS:280 and IS: 4826 in 100mmx100mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40Kg each including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 wutg grabykar nateruak including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
NARAYAN SINGH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .