| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.7 LAccepted-AOC | 1 | Accepted-AOC 874152.94 | |
| 2 | Rejected-Technical | - | Rejected-Technical Third lowest bid | |
| 3 | Rejected-Technical | - | Rejected-Technical Second Lowest Bid | |
| 4 | Rejected-Technical 309 26 CHAPPATH MKC ROAD CONERELE | - | Rejected-Technical Fourth lowest tender |
Tender Value
₹10.2 L
EMD Value
₹25,420
Closing Date
7 Mar 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Office of Assistant Engineer, LID and EW Section, Elappara
Building
2025_LSGD_744261_2
3/2024/AE/ELP
Open Tender
Civil Works - Roads
Item Rate
Elappara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
₹25,420
27 Mar 2025
28 Feb 2025
10 Mar 2025
28 Feb 2025
7 Mar 2025
28 Feb 2025
28 Feb 2025 - 7 Mar 2025
Amount
Building work (Construction of First Floor)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
SM BUILDERS (BID ID -2142694)
Santhosh.K.N (BID ID -2142251)
Cherian Thomas (BID ID -2142297)
Bidder Name
Santhosh.K.N
SM BUILDERS
SREEKUMARS
Cherian Thomas
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1199709.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .