Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Finance K 166 64 S OLD NO 166 64 KH NO 686 MINHOUD NEAR MASJID GAUTAM VIHAR NEW DELHI | ₹24.9 L | L1 | Admitted-Finance |
| 2 | L2₹27.1 L+₹2.2 L (8.78%)Admitted-Finance KOUSTHUBAM 31 76A 1 MAYANAD KOZHIKODE 673008 | KOZHIKODE | KERALA | 673008 | ₹27.1 L+₹2.2 L (8.78%) | L2 | Admitted-Finance |
| 3 | L3₹27.4 L+₹2.4 L (9.80%)Admitted-Finance DEVOM KADAVATH POLLAPOIL KODAKKAD PO KASARGOD KERALA 671310 | KASARAGOD | KERALA | 671310 | ₹27.4 L+₹2.4 L (9.80%) | L3 | Admitted-Finance |
| 4 | L4₹29.5 L+₹4.5 L (18.2%)Admitted-Finance EDOLIKUNNATH H CHENNAMANGALUR PO MUKKAM VIA CALICUT 673602 | KOZHIKODE | KERALA | 673602 | ₹29.5 L+₹4.5 L (18.2%) | L4 | Admitted-Finance |
| 5 | L5₹29.5 L+₹4.6 L (18.3%)Admitted-Finance | ₹29.5 L+₹4.6 L (18.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | E K IBRAHIMKUTTY L4 | SONU CONSTRUCTION L1 | PRAJEESH V K L6 | Jayakumar V V L3 | EK MOIDEEN L5 | R SAJI KUMAR L7 | Celmech Engineering Pvt.Ltd L2 | HRL ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CEMENT CONCRETE (CAST IN SITU) | |||||||||||
| 1.10Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||||||
| 1.11 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.64 | cum | 9,850 ₹26,004 | 2,500 ₹6,600 Lowest | 7,000 ₹18,480 | 10,000 ₹26,400 | 9,500 ₹25,080 | 9,900 ₹26,136 | 10,500 ₹27,720 | 11,950 ₹31,548 |
| 1.20Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||||||||
| 1.21 | Foundations, footings, bases for columns | 29 | sqm | 485 ₹14,065 | 250 ₹7,250 Lowest | 300 ₹8,700 | 400 ₹11,600 | 450 ₹13,050 | 345 ₹10,005 | 450 ₹13,050 | 360 ₹10,440 |
| 2.00REINFORCED CEMENT CONCRETE | |||||||||||
| 2.10Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | |||||||||||
| 2.11 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 13,750 ₹13,750 | 950 ₹950 Lowest | 10,000 ₹10,000 | 12,000 ₹12,000 | 8,500 ₹8,500 | 10,800 ₹10,800 | 12,500 ₹12,500 | 14,990 ₹14,990 |
| 2.20Centering and shuttering including strutting, propping etc. and removal of form for | |||||||||||
| 2.21 | Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | 1,300 ₹1,300 | 250 ₹250 Lowest | 500 ₹500 | 900 ₹900 | 1,103 ₹1,103 | 950 ₹950 | 550 ₹550 | 980 ₹980 |
Tender Value
₹32.0 L
EMD Value
₹64,100
Closing Date
29 Jun 2026, 6:00 pmClosed
Director
NIT Calicut, NIT Calicut Campus PO, Kerala, 673601
Providing roof sheet for FD13 and FD14
2026_NITC_912098_1
Engg/D1/JE 7/502/2026-27
Open Tender
Civil Works
Item Rate
75 days
NIT Calicut, NIT Calicut Campus PO, 673601
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹64,100
Yes
23 Jul 2026
8 Jun 2026
1 Jul 2026
8 Jun 2026
29 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CEMENT CONCRETE (CAST IN SITU) | |||||
| 1.1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 1.11 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.2 | Centering and shuttering including strutting, propping etc. and removal of form work for: | - | - | - | - |
| 1.21 | Foundations, footings, bases for columns | - | sqm | - | - |
| 2REINFORCED CEMENT CONCRETE | |||||
| 2.1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | - | - | - | - |
| 2.11 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 2.2 | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - |
| 2.21 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_958578.xls
BOQ • 0.40 MB
502Dwg.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .