Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist rank₹6.3 LAccepted-AOC PULININNA KALLAMPOTTA BUNGLOW PARANIYAM ARUMANOOR POOVAR P O | Ist rank | Accepted-AOC Isr Rank. | |
| 2 | Rejected-Technical | - | Rejected-Technical 5th rank | |
| 3 | Rejected-Technical | - | Rejected-Technical 2nd rank | |
| 4 | Rejected-Technical | - | Rejected-Technical 4th rank | |
| 5 | Rejected-Technical | - | Rejected-Technical 3rd rank |
| Sl No | Description | Qty | Unit | RAVIDAS M L4 | R SELVARAJ L5 | RAJEESH M R L2 | REVATHY CONSTRUCTIONS L3 | PRAKASH N V L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Retaining wall | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 75 | sqm | 15.6 ₹1,170 | 16.17 ₹1,212.75 | 15 ₹1,125 | 15.52 ₹1,164 | 14.48 ₹1,086 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 80.88 | cum | 308.52 ₹24,953.1 | 319.92 ₹25,875.13 | 296.75 ₹24,001.14 | 307.05 ₹24,834.2 | 286.45 ₹23,168.08 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.92 | cum | 6,803.61 ₹53,884.59 | 7,054.99 ₹55,875.52 | 6,544.11 ₹51,829.35 | 6,771.17 ₹53,627.67 | 6,317.05 ₹50,031.04 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 164.59 | sqm | 331.19 ₹54,508.91 | 343.42 ₹56,521.78 | 318.56 ₹52,430.2 | 329.61 ₹54,248.86 | 307.5 ₹50,609.89 Lowest |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 49.48 | cum | 7,173.82 ₹3,54,960.61 | 7,438.88 ₹3,68,075.78 | 6,900.21 ₹3,41,422.39 | 7,139.62 ₹3,53,268.4 | 6,660.79 ₹3,29,575.89 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 915.38 | kilogram | 96.42 ₹88,260.94 | 99.98 ₹91,519.69 | 92.74 ₹84,892.34 | 95.96 ₹87,839.86 | 89.52 ₹81,944.82 Lowest |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 78.4 | sqm | 294.85 ₹23,116.24 | 305.74 ₹23,970.02 | 283.6 ₹22,234.24 | 293.44 ₹23,005.7 | 273.76 ₹21,462.78 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.9 | cum | 7,921.18 ₹78,419.68 | 8,213.86 ₹81,317.21 | 7,619.06 ₹75,428.69 | 7,883.42 ₹78,045.86 | 7,354.71 ₹72,811.63 Lowest |
| 1.01 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 7.5 | metre | 94.93 ₹711.98 | 98.44 ₹738.3 | 91.31 ₹684.83 | 94.48 ₹708.6 | 87.86 ₹658.95 Lowest |
Tender Value
₹8.1 L
EMD Value
₹20,262
Closing Date
21 Oct 2025, 2:00 pmClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, Channel Sub Division, Neyyattinkara
GENERAL Deposit NIP Kulathoor G PConstruction of side protection wall on the left bund near ch 5668m of Karumanoor right branch canal in Puzhikunnu ward General Civil Work
2025_Irrig_810656_1
IRR/IA/EST/1911/2025_5_1_1
Open Tender
Civil Works - Canal
Item Wise
Neyyattinkara
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,790
₹20,262
21 Nov 2025
16 Oct 2025
22 Oct 2025
16 Oct 2025
21 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1353260.xls
BOQ • 0.30 MB
BID.pdf
Tender Documents • 1.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .