Loading…
Loading…
| Sl No | Description | Qty | Unit | K P JACOB L1 | LUCKMAN L2 |
|---|---|---|---|---|---|
| 1.00APPENDIX A | |||||
| 1.00 | OD10984/2025-2026:structural steel work for maintaining existing damaged shutters of size 1.5*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding etc complete and applying a priming coat of approved steel primer etc complete. ( 1.5*0.5=0.75m2*12.648 kg/m2=9.486 kg add 5% wastage =9.9603kg) | 2 | each | 4,800 ₹9,600 Lowest | 5,050 ₹10,100 |
| 1.00 | OD10986/2025-2026:structural steel work for maintaining existing damaged shutters of size 2*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding etc complete and applying a priming coat of approved steel primer etc complete. ( 2*0.5=1m2*12.648 kg/m2=12.648 kg add 5% wastage =13.2804kg) | 1 | each | 5,390 ₹5,390 Lowest | 5,670 ₹5,670 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 33.75 | sqm | 181.35 ₹6,120.56 Lowest | 191 ₹6,446.25 |
| 1.00 | OD10985/2025-2026: Filling and forming the bund using available excavated earth(excluding rock) including all incidental lead and lift etc complete as directed by the departmental officers at site. | 4.23 | cum | 550 ₹2,326.5 Lowest | 579 ₹2,449.17 |
| 1.00 | OD10988/2025-2026: Labor charges towards watching and maintaining the bund during season including operating of the shutters of the sluice as directed by the departmental officers at site. | 180 | each | 1,190.4 ₹2,14,272 Lowest | 1,252 ₹2,25,360 |
| 1.01 | OD10982/2025-2026: Dismantling the bund in between the shutters as per the directions of departmental officers at site. | 3.6 | cum | 220 ₹791.12 Lowest | 231 ₹830.68 |
| 1.01 | OD10983/2025-2026:Engaging labour for all kinds of work in emergencies as instructed by the departmental officers in charge. | 6 | Day | 1,190.4 ₹7,142.4 Lowest | 1,252 ₹7,512 |
| 1.01 | OD10987/2025-2026:Labour charges for handling including removing and placing, cleaning and conveying steel framed and GRP shutters to and from bund and stacking the same conveniently as directed by the departmental officers in charge. | 15 | each | 1,190.4 ₹17,856 Lowest | 1,252 ₹18,780 |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 61.54 | kilogram | 128.36 ₹7,899.27 Lowest | 135 ₹8,307.9 |
Tender Value
₹2.5 L
EMD Value
₹6,142
Closing Date
22 Oct 2025, 11:00 amClosed
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER MI SUBDIVISION ALUVA
Annual Maintenance
2025_Irrig_807762_1
IRR/IA/TR/3735/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
240 days
PARAVOOR
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹6,142
Yes
13 Nov 2025
9 Oct 2025
23 Oct 2025
9 Oct 2025
22 Oct 2025
9 Oct 2025
9 Oct 2025 - 22 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1346450.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.64 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.08 MB
BOQ_1346450.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .