| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.0 LAdmitted-Fee/PreQual/Technical/Finance MANTRI BARI ROAD P O AGARTALA WEST TRIPURA 799001 | NA | NA | 799001 | -23.23% | ₹41.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹49.4 L+₹8.4 L (20.5%)Admitted-Fee/PreQual/Technical/Finance BISHALGARH SEPAHIJALA 799102 | SEPAHIJALA | TRIPURA | 799102 | -7.53% | ₹49.4 L+₹8.4 L (20.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹52.9 L+₹11.9 L (29.0%)Admitted-Fee/PreQual/Technical/Finance AGARTALA MUNICIPAL CORPORATION AGARTALA | WEST TRIPURA | TRIPURA | 799001 | -1.00% | ₹52.9 L+₹11.9 L (29.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹53.5 L
EMD Value
₹1.1 L
Closing Date
17 Sept 2026, 3:00 pmClosed
O/O EE, Agt. Divn.III, PWD(RandB)
O/O the EE, Agt. Divn.III, PWD(RandB)
SH_ Brick work Soling, Grouting, PMC, sand seal coat, and other allied woks.
2026_CEPWD_76776_1
62_SE_II__PWD_RandB_2026_27
Open Tender
Civil Works - Roads
Percentage
180 days
Agartala
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹1.1 L
17 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Flat brick soling :--- Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 504 | Sqm. | 601.8 | ₹3,03,307.2 |
| 1.2 | Maintenance of bituminous surface road using Jhama brick aggregate Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with B.M (using jhama brick aggregate & bitumen of VG-30), after applying prime coat at the bottom and tack coat on sides and on bottom (using bitumen emulsion) and compacting, trimming & finishing the surface to form a smooth continuous surface, all as per MoRD technical specification Clauses 1900, 502, 503 and 504. | 65.96 | Cum | 12,029.32 | ₹7,93,490.04 |
| 1.3 | Without Dewatering:- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. Ordinary Soil. Up to 3 mtr depth | 228.59 | Cum | 458.2 | ₹1,04,739.94 |
| 1.4 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. i) sand filling | 12.39 | Cum | 1,406.16 | ₹17,422.32 |
| 1.5 | Granular Sub-base with Well Graded Material (Table 400.1) using Jhama Brick Aggregate
By Mix in Place Method Construction of granular sub-base by providing well graded material (Jhama Brick Aggregate, Grading-I, as per Table 400.1, spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401. | 113.4 | Cum | 5,062.24 | ₹5,74,058.02 |
| 1.6 | 80 mm thick factory made c.c. interlocking paver block of M-35 Grade Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge: (a) 80 mm thick c.c. paver block of M-35 grade with approved colour, design and pattern | 756 | Sqm. | 1,552 | ₹11,73,312 |
| 1.7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:
1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | 2.94 | Cum | 9,295.7 | ₹27,329.36 |
| 1.8 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 27.89 | Cum | 9,845.2 | ₹2,74,582.63 |
| 1.9 | Tack coat Tack coat using hot straight run bitumen of grade VG-30 on bituminous surface:- Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On bituminous surface @ 0.50 Kg/ Sqm. | 3,056.5 | Sqm. | 41.17 | ₹1,25,836.11 |
| 2.1 | 20 mm thick Open-Graded Premix Carpet using Bituminous (viscocity grade/ modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscocity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508
I).Case - I : By Manual Means A) Bitumen of VG-30 | 3,056.5 | Sqm. | 346.96 | ₹10,60,483.24 |
stage.html
html • 0.02 MB
finance_78155.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_78155.xls
BOQ • 0.26 MB
DNIeT.pdf
Tender Documents • 3.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .