| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.1 LAccepted-AOC MAVILAVALAPPIL HOUSE ONAPPARAMBA | KERALA | ₹16.1 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | K M KUNHIKRISHNAN L1 |
|---|---|---|---|---|
| 1.00Building Maintenance | ||||
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 7 | each | 354.25 ₹2,479.75 Lowest |
| 1.00 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 525.9 | metre | 17.19 ₹9,040.22 Lowest |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 0.78 | cum | 4,300.66 ₹3,341.61 Lowest |
| 1.00 | OD451403/2025-2026:Demolishing laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 11.74 | cum | 1,987.85 ₹23,329.41 Lowest |
| 1.00 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet | 6 | sqm | 74.64 ₹447.84 Lowest |
| 1.01 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 1.73 | sqm | 70.81 ₹122.15 Lowest |
| 1.01 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 19.8 | kg | 5.46 ₹108.11 Lowest |
| 1.01 | OD451404/2025-2026:Dismantling interlock work in floors laid in cement mortar including stacking material within 50 metres lead.For thickness of interlock 60 mm to 80 mm | 53.19 | sqm | 70.81 ₹3,766.38 Lowest |
| 1.01 | OD451406/2025-2026:Laterate masonry with neatly dressed laterate stone of size 33x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 1.57 | cum | 6,112.73 ₹9,627.55 Lowest |
Tender Value
₹16.1 L
EMD Value
₹40,248
Closing Date
11 Mar 2026, 6:00 pmClosed
Assistant Engineer
LSGD Section, , Pallikkunnu Zonal
Maintenance of Various Anganvadies in Pallikkunnu Zonal
2026_LSGD_844742_1
AE/LSGD/Pkn/ReEtender/25-26(5)
Open Tender
Civil Works - Buildings
Item Rate
180 days
Pallikkunnu
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹40,248
Yes
17 Aug 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
11 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building Maintenance | |||||
| 1.001 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.002 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 1 | metre | - | - |
| 1.003 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | - | cum | - | - |
| 1.004 | OD451403/2025-2026:Demolishing laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.005 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet | - | sqm | - | - |
| 1.006 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.007 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | - | kg | - | - |
| 1.008 | OD451404/2025-2026:Dismantling interlock work in floors laid in cement mortar including stacking material within 50 metres lead.For thickness of interlock 60 mm to 80 mm | 1 | sqm | - | - |
| 1.009 | OD451406/2025-2026:Laterate masonry with neatly dressed laterate stone of size 33x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1426282.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
PreliminaryAgreement.pdf
Other Document • 0.07 MB
Tenderdocument.pdf
Tender Documents • 1.64 MB
BOQ_1426282.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .