Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹350Admitted-Finance | ₹350 | L1 | Admitted-Finance |
| 2 | L2₹465Admitted-Finance | ₹465 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SARISA CONSULTING PRIVATE LIMITED L1 | EHS SOLUTIONS L2 |
|---|---|---|---|---|---|
| 2.00 | Design, construction, establishment
and development of Processing plant
and required development work and
maintenance of Engineered sanitary
landfill site and O&M for 20 years
having a minimum capacity of 50
MT/adequate for Rajsamand city and
scalable further as per requirement.
Processing plant shall have a facility
of segregation of recyclables shall
have an integrated facility to treat
organic matter as well as other Dry
waste adopting suitable technology as
prescribed in RFP to ensure that at
least 80 % of the Waste is reduced on
account of segregation and Processing
of Waste and a maximum of 20 %
Waste is left as residue for Disposal at
the SLF. The technology which is
environmentally friendly. On VGF
basis as per solid waste management
rules 2016 Amended time to time and
swachh Bharat Mission (Urban) 2.0
guide line. | 1 | Mt | 350 ₹350 | 465 ₹465 |
Updated dates
Tender Value
₹6.8 Cr
EMD Value
₹13.6 L
Closing Date
23 Dec 2025, 6:00 pmClosed
Commissioner M.C. Rajsamand
Municipal Council Rajsamand
Request for Proposal (RFP) for Design, construction, establishment and development of Processing plant Rajsamand
2025_DLB_512244_1
6422/2025-26 Date 07.11.2025
Open Tender
Miscellaneous Services
7300 days
Rajsamand
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Commissioner M.C.Rajsamand and MDRISL Jaipur
₹13.6 L
Yes
Municipal Council Rajsamand
11 Feb 2026
11 Nov 2025
24 Dec 2025
12 Nov 2025
23 Dec 2025
12 Nov 2025
20 Nov 2025
Design, construction, establishment and development of Processing plant and required development work and maintenance of Engineered sanitary landfill site and O&M for 20 years having a minimum capacity of 50 MT/adequate for Rajsamand city and scalable further as per requirement. Processing plant shall have a facility of segregation of recyclables shall have an integrated facility to treat organic matter as well as other Dry waste adopting suitable technology as prescribed in RFP to ensure that at least 80 % of the Waste is reduced on account of segregation and Processing of Waste and a maximum of 20 % Waste is left as residue for Disposal at the SLF. The technology which is environmentally friendly. On VGF basis as per solid waste management rules 2016 Amended time to time and swachh Bharat Mission (Urban) 2.0 guide line.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.01 MB
BOQ_913512.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid