Loading…
Loading…
Tender Value
₹99.4 L
EMD Value
₹1 L
Closing Date
5 Sept 2026, 6:00 pm
Executive Engineer, Anand Irrigation Division Anand.
Constructing RCC Box type Barrel in place of Existing VRB @ Ch.29826’ on Petlad Branch Canal Ex Main Canal(MRBC)(Rasnol to Tranol)
331369
06 of 2026-2027
Open
Miscellaneous Works
Works
Anand
13 documents required · 12 mandatory · 1 optional
₹2,400
Executive Engineer Anand Irrigation Division Anand
₹1 L
6 Aug 2026
6 Aug 2026
6 Aug 2026
5 Sept 2026
6 Aug 2026
No. figures(Rs.)
Excavation for foundation in all sorts of soil including
yellow sandy gravelly soils ,soft & hard murrum etc.
in dry condition including depositing the excavated
stuff in uniform layers in banks or as and where
directed etc. complete for lead up to 500m and all lift.
(BY MACHINERY) Including dewatering.
Providing rubble and sand layer including supplying
of rubble & coarse clean sharp sand at site including
spreading rubble & coarse sand materials in 25 cm
2 layer including filling in the gaps in rubble, and 57.00 Cum 1155.90
levelling etc.complete as directed (80% rubble & 20%
coarse sand) including consolidation, watering etc.
Providing & Laying in position"NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate
by mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding,
3 compaction by vibrator, curing as directed with all 146.00 Cum 3346.00
lead & lift etc complete Without Dewatering and
excluding cost of steel reinforcement. For Foundation
concrete/General purpose. C. C.Nominal Mix, M-10
and MSA-40 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc. Concrete
grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.Concrete
grade M-25 and MSA-20 mm
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826 Feet on Petlad Branch
Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
4(c) vibrator, curing as directed with all lead & lift etc 369.00 Cum 4457.00
complete without dewatering and excluding the cost
of steel reinforcement. (B) For Pier and Abutments
/ Wing wall / Head wall / Return wall / Dowel Wall
etc. Concrete grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
4(d) vibrator, curing as directed with all lead & lift etc 234.00 Cum 5642.00
complete without dewatering and excluding the cost
of steel reinforcement. (E) For Column / Beam /
Solid Slab of Road Bridge / Barrel / Cutoff wall
etc.Concrete grade M-25 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost
of steel reinforcement. For Kerb / Wearing
coat.Concrete grade M-25 and MSA -10 to 20mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by
4(f) vibrator, curing as directed with all lead & lift etc 6.00 Cum 8023.00
complete without dewatering and excluding the cost
of steel reinforcement. For Parapet wall of Road
Bridge / Structure. Concrete grade M-25 and MSA -
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
necessary, hooking etc. complete as per drawing for
all lead and lifts.TMT
Providing and fixing in position pre-moulded asphalt
or bitumen cork board of approved quality and
specifications as per design and drawing.20 mm
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826 Feet on Petlad Branch
Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing and fixing in position P.V.C. heavy duty
water stops in barrels, troughs and wing walls with
25 mm wide expansion joint as shown in drawing
7 including filling the joints with asphalt pad or 60.00 Meter 587.70
bitumen cork board of approved quality.
(Asphalt pad or bitumen cork board will be paid separ
ately) 225 mm WIDE P.V.C. WATER STOP
Providing and filling the polysulphide joint sealent of
the approved make in the expansion and contraction
8 60.00 Meter 181.20
joints in the c.c. lining including clearing the joints
with air water jet.
Providing and fixing 110 mm diameter P.V.C..Pipe (6
9 kgf / sqcm) Water spout with necessary iron gratting 11.00 Meter 369.20
as per design
Back filling the foundation trenches around the
watering, ramming, compacting etc. complete. (By
Machinery)
Providing and fixing in position 1.80 m high above
finished ground level canal data boards of standard
size 1.20m x 0.90m with M.S. angle 40mm x 40mm x
11 6mm with 3mm thick iron plate in 1:5:10 proportion 2.00 No 3103.00
concrete block size 40cm x 40cm x 75cm including
painting existing data on the board etc. complete as
Wall Painting (two Coats) with plastic emulsion paint
of approved brand & manufacture on undecorated
wall surface to give an even shade including
throughly brushing the surface free from mortar
dropping & other foreign matter & sand papered
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826 Feet on Petlad Branch
Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Type-A,"W": Metal Beam Crash barrier (Providing &
erecting a "w" metal beam crash barrier comprising of
3 mm thick corrugated sheet metal beam rail,70 cm
above Road/ground level,fixed on ISMC series
channel vertical post, 150x75x5 mm spaced 2.0 mtr.
Center to center,1.80 mtr high,1.1 mtr below
13 20.00 Meter 3321.00
road/ground level, all steel parts and fitments to be
galvanized by hot deep process,all fittings will be
confirm to IS:1367 & IS:1364, metal beam rail to be
fixed on the vertical post with a spacer of channel
section 150x75x5 mm, 330 mm long complete as per
clause 811)
Carrying out "Structure Footing load Test" as per
GERI -Vadodara's SOR for the Year 2025-26
Dismantling the R.C.C. work and disposing off the
stuff including stacking of the useful materials etc.
complete as directed. Heavy Reinforcement (Main
bar above 16 mm. dia.)
Dismantling the R.C.C. work and disposing off the
stuff including stacking of the useful materials etc.
complete as directed. Light Reinforcement ( Main
bar upto 16 mm. dia.)
Dismantling the existing foundation concrete
including sorting out the dismantalled stuff and
16 stacking the useful material, removing the debries 12.00 Cum 1155.20
and making good the damages etc. complete as and
where directed. Cement Concrete
Dismantling the existing brick masonry including
sorting out and stacking the useful material and
removing the debries and making good the damages
etc. complete as directed. In Cement Mortar
Providing temporary all weather and fair weather
diversion suitable for traffic during the construction
18 period of the structure including providing necessary 1.00 455500.00
drain diversion and all safty measures including red
lamps/ signals at night for traffic etc. comp.
BILL OF QUANTITIES
Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826 Feet on Petlad Branch
Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing dron videography on the ocassion of
19 function or for before/on going/ after completion of 1.00 4000.00
construction work as directed by Engineer in charge
Rs. Ninety Nine Lac Thirty Eight Thousand One Hundred Sixty Nine & Eighty Five Paise
Only am/are willing to carry out the work at……………………………. % above/ below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Put to tender Estimated amount Put to tender
Deduct …………………….% Below Add ……………. % above
In Words In Words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC 10/2017 Cement Consumption /16/CDate:11/05/2017 as stated in S.O.R. therefore in R.C.C.
4 items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate i.e. 5483.37/MT of input rate mentioned in
all the tender.
Divisional Accountant
Anand Irrigation Division Anand Irrigation Division
Anand Anand
Deputy Executive Engineer
Ode Irrigation Sub Division Executive Engineer
Umreth Anand Irrigation Division
Cement Requirement Statement
Name of Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826 Feet on Petlad
Work :- Branch Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Sr Item cement
Description of Item Qty. Unit ion in
No. No. requirement
Providing & Laying in position"NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks
1 3 centering, scaffolding, compaction by vibrator, 146.00 Cum 4.40
curing as directed with all lead & lift etc complete
Without Dewatering and excluding cost of steel
reinforcement. For Foundation concrete/General
purpose. C. C.Nominal Mix, M-10 and MSA-40 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
2 4(a) directed with all lead & lift etc complete without 234.00 Cum 6.00
dewatering and excluding the cost of steel
reinforcement. For Footing of column / Abutment
/ Pier / Bottom slab of barrel / Plinth course /
Coping / Approach Slab etc. Concrete grade M-15
and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
3 4(b) directed with all lead & lift etc complete without 138.00 Cum 7.60
dewatering and excluding the cost of steel
reinforcement. For Footing of column / Abutment
/ Pier / Bottom slab of barrel / Plinth course /
Coping / Approach Slab etc.Concrete grade M-25
and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. (B) For Pier and Abutments /
Wing wall / Head wall / Return wall / Dowel Wall
etc. Concrete grade M-15 and MSA-20 mm
Cement Requirement Statement
Name of Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826 Feet on Petlad
Work :- Branch Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Sr Item cement
Description of Item Qty. Unit ion in
No. No. requirement
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. (E) For Column / Beam / Solid
Slab of Road Bridge / Barrel / Cutoff wall
etc.Concrete grade M-25 and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
6 4(e) scaffolding, compaction by vibrator, curing as 26.00 Cum 7.60
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. For Kerb / Wearing coat.Concrete
grade M-25 and MSA -10 to 20mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without
dewatering and excluding the cost of steel
reinforcement. For Parapet wall of Road Bridge /
Structure. Concrete grade M-25 and MSA -10 to
Total (Bags)
Say (Bags)
Total (MT)
Deputy Exectutive Engineer Exectutive Engineer
Ode Irrigation Sub Division Anand Irrigation Division
Umreth Anand
Steel Requirement Statement
Name of Constructing R.C.C. Box Type Barrel In Place of Existing VRB @ Ch.29826
Work :- Feet on Petlad Branch Canal x Main Canal ( MRBC ) (Rasnol to Tranol)
Description of Item Qty. Unit
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
necessary, hooking etc. complete as per drawing for
all lead and lifts.TMT
Deputy Exectutive Engineer Exectutive Engineer
Ode Irrigation Sub Division Anand Irrigation Division
Umreth Anand
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender notice 6 0f 2026 27.pdf
1 Front Page. 29826 ft.pdf
2.1 Certificate p1.pdf
2.2 Certificate p2.pdf
3 Notice Inviting online Tender 29826 ft.pdf
4-SBD Book-29826.pdf
5 General and item wise specification 29826ft.pdf
Bill of Qty Sch B 29826ft.pdf
Drawing-29826.pdf
Standard Techanical Specification of 29826ft.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].