Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance WEST BENGAL | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
8 Jul 2020, 11:00 amClosed
ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard Karwar
SHORT REFIT OF WATER BARGE V
2020_NAVY_351827_1
YCM/21/SR/WB V
Open Tender
Marine Services
90 days
Naval Ship Repair Yard Karwar
AS PER RFP
2 documents required · 2 mandatory
₹0
₹10 L
Naval Ship Repair Yard Karwar
29 Jul 2020
11 Jun 2020
9 Jul 2020
11 Jun 2020
8 Jul 2020
19 Jun 2020
18 Jun 2020
Amount
Erection of fixed staging/scaffolding in way of steel renewal work(Based on Volume Basis, LXBXH). Staging material to be provided by Contractor
Fire sentry for minimum 05 hot work locations /day Note:- Fire sentries with adequate knowledge of fire and safety procedures for all hot work locations will need to be provided i.a.w NO 09/12. Sentries are to be in possession of required type of fire extinguishers in appropriate quantity. All sorts of fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/ incident.
Cleaning and Gas free certification i.a.w NO 09/12 of Fuel / Oil Tanks (475 sq.m) Total tanks (Qty - 04). Quote for Service and Material
Pressure Testing of Underwater tanks/void spaces/cofferdams. Including repairs/blanking of manhole covers( with new rubber gaskets/studs/bolts/as required) and defect rectification of all structural leaks i.a.w NO. 01/15. Material and spares to be provided by contractor. Ballast Tank-05 Nos, Fuel Tank-4 , Fw Tank- 2, Misc Tank-3 Void Space - 08 , Feed Water Tank- 10. To be paid on acutals. Quote for Service.
Renewal of sea tube/Sea chests. (Including DPT of weld seam) i.a.w NES 155, NES 706. Material and Service to be provided by contractor
Pressure testing of sea tube to 0.2 Bar upto 10 mins i.a.w NO 01/15. Material and Service to be provided by contractor
Bollard and Fairlead - Carry out surface preparation by hydrojet blasting up to bare metal to WJ 2 Standard. Repairs to be undertaken as per hull survey report of bollards / fairleads/ mooring pipe and stiffening members in the vicinity. Bollard (Qty 13), Fairleads (Qty 05) and stiffeners. Note: - After hydrojet blasting, primer application to be undertaken to prevent flash rusting the same is to be put up for inspection prior to repair / renewal or painting to refit monitoring team. Inspection to be cleared post repairs by NSRY/ QC Team. Material and Service to be provided by contractor
Underwater Plating - (a) Remove marine fouling and old paint to bare metal from hull using hydrojet blasting to WJ 2 standard. (b) Paint scheme on full underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area is to be restored. (c) Application of paint on underwater hull and boot top area to be carried out post WJ 2 standard. (d) Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint. (i) Forward (ii) Midship, (iii) Aft. Renew defective draught marks.Material and spares to be provided by contractor Note-: Navy approved paint scheme Akzonobel to be applied. Painting to be carried out as per NO 53/16. Material and Service to be provided by contractor
Above Water Area and Weather Deck Area - Carry out surface preparation by hydro jet blasting up to bare metal to WJ 2 standard. Defects to be rectified as per hull survey report. Carry out painting of above water area with high performance advanced hybrid coating system as per navy approved paint scheme Akzonobel mentioned below and weather deck area to be painted with high performance non- skid coating system as per navy approved paint scheme Akzonobel mentioned below. (a) Paint scheme for above water area (ship side, deck, Aft & Fwd Bulwark (Internal) & super structure)(Area - 840 Sqm) :- (i) 02 coats of primer to achieve 80 microns dft, (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness, (iii) Total dft 320 microns.Material and spares to be provided by contractor . (b) Paint scheme of weather deck area (upper deck, funnel deck and bridge top deck)(Area - 950 Sqm):- (i) 01 coat primer coat - dft 50 microns, (ii) 01coat anti corrosive intermediate coat - dft 200 microns, (iii) 01 coat non skid top coat - dft 800 microns, (iv)Total dft - 1050 microns. Material and Service to be provided by contractor
Funnel and Masts- Carry out complete surface preparation by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint of surroundings structure, funnel and Mast structure. Heat resistant paint on funnel to be applied as per navy approved paint scheme RAL 9011(black) and/or RAL 9010 (White) And/or IS 5/ 358 (Buff colour) as per NO 53/ 16.Note:- Painting to be carried out as per NO 53/16. Paint scheme for mast:- (i) 02 coats of primer to achieve 80 microns dft, (ii) 02 coats of Ral 7040 colour specification to achieve 80 microns thickness, (iii) Total dft 320 microns. Material and Service to be provided by contractor.
Machinery Spaces - Clean all bilges, machinery foundation and surface preparation as per ST 3 standard and painting of the entire area. Clean all limber holes and drain holes. Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paint to be provided by Firm. Material and Service to be provided by contractor
Lagging Renew damaged / perished lagging at various places using pin method. Renew / restore in case of existing areas, paint scheme of affected areas before renewal of lagging. Material and Service to be provided by contractor
Cathodic Protection Sacrificial Anodes - Renew all sacrificial anodes fitted to underwater hull, rudders, rope guard, shaft tunnel, stern tubes, inlets and outlets, sea chest, bilges and coffer dams based on survey report. Renew those consumed more than 25 % or more as per survey report. Clean remaining sacrificial anodes with steel wire brush. Quote for Service. Mk II – 29, Mk I – 02, Mk VI – 13. Material and Service to be provided by contractor
Steel Renewal of structural plates (with Stiffeners) of deck and bulkheads including tank tops (including degutting of lagging, perforated paneling, cabling assiciated equipment minor eqpts., brackets, wooden fittings, machinery / equipment, switchboard / control panels, electronic and communication equipment, all light fittings, pipe lines, valves, electrical cables, junction boxes, obstructions, protrusions, foundation etc. etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting) of thickness as specified below with testing of weld joints by DPT. Steel plates supplied by Yard. All consumables material supplied by contractor. Quote for Service and Yard consumables.
Minor repairs of Wooden Furniture - Repair of wooden furniture (dinning table top in crew and officer's dinning hall - 03 nos.,wooden locker in dinning hall-02). Mat - Wood. Material and Service to be provided by contractor.
Repair of locking arrangement and handles of all lockers and cupboards in all cabins and wheel house. Material and Service to be provided by contractor
Plywood at lockers, cupboards and other wooden furniture in various offices and accommodations found broken / perished. The same is to be renewed. Material and Service to be provided by contractor.
Renewal of Table (Qty 01; 1200x700x750H) and Locker (Qty 03; 600x400x1800H)(Wooden) as per sample.Material and Service to be provided by contractor
Repair of - Bunk lockers (Qty 20) to be undertaken. Job involves renewal of sliding macanism and sunmica). Material and Service to be provided by contractor .
Renewal of Sofa with table (qty 01) (5 men sofa) as per sample.Material and Service to be provided by contractor
Renewal of mattress with cover and their securing arrangements. Single type mattress (Qty 14). Thickness - 6" as per sample. Material and Service to be provided by contractor
Renewal of chairs in dining hall, master cabin, engine driver cabin, wheel house and mess decks,. Cabin Chairs (Qty 04), Executive Chairs (Qty 04), Dinning Chiar (Qty 06) as per sample. Material and Service to be provided by contractor
Removal of old Macrotech to be undertaken. Surface preparation to be carried out for hull survey. Defects to be rectified as per survey report of yard. Macrotech to be renewed post application of primer on deck. (Mfd – M/s Macrotech). Material and Service to be provided by contractor
Anchor, Chain Cable and Cable Locker - Lay out Anchor and chain cables and carry out surface preparation up to bare metal for survey. Repairs to be under taken as per hull survey report. Undertake survey of cable and shackles.Dismantle anchor and chain cable , clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear. Re-mark cable length. Examine hull associated fittings. Clean and grease trunion pin and housing. Grease to be used:- LG-280 Patt No 0474/910-0502. The machined surface of the joints of lugless joining shackles are to be examined for corrosion. All such shackles are to be stripped, greased and re-assembled. Anchor, chain cable and cable locker to be painted as per existing paint scheme. Paint to be provided by refittng firm. (Qty: Anchor - 02, chain length- 275 mtr). Material and service to be provided by contractor.
Overhauling- Capstan (Mfd- Hemant Eng. Works) - Following work to be carried out:- (a) Overhauling of capstan along with motor assembly and changing of oil. Equipment to be proved for satisfactory operation. Undertake weather proofing of motor terminal box. (b) Renew all high speed bearings. (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and thereafter varnish dirty and oily windings. (e) Motor to be overhauled, with both bearings renewed & tested onboard on load (subject to QC checks). (f) Overhauling of brake mechanism to be carried out. (g) Inspect and overhaul the control panel and renew defective components and cabling. (h) System to be proved for designed operation and load trials to be offered. (h) Carry out surface prepaeation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Material and Service to be provided by Contractor
Overhauling- Anchor Winlass (Mfd- Hemant Eng. Works) - Following work to be carried out:- (a) Overhauling of anchor winch along with motor assembly, rollers and anchor windlass accessories. Changing of oil and insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box. Undertake survey of structure post load testing. Structural defects to be rectified, if any. (b) Renew all high speed bearings (6208.2zr). (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and varnish dirty and oily windings. (e) Motor to be overhauled, both bearing to be renewed & tested onboard on load (subject to QC checks). (f) Overhaul brake mechanism. (g) Overhaul the control panel, and renew defective components and cabling. (h) Load test details to be furnished. Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs. (j) System to be proved for designed operation and load trials to be offered. (k) Carry out surface prepaeation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Material and Service to be provided by Contractor
Sewage Treatment Plant (Mfd- Hamworthy, Wartsila), Model- ST1A-C) - Undertake following routines: (a) Functioning of level switches of V-1 tank. Carryout de-sludging of V-2 tank by backflushing line. Clean the seawater ‘y’ type strainer at the inlet to bookcell. Lub oil to be renewed. Clean air supply filter / regulator element in solvent. Drain, inspect & clean the ‘bookcell’. Remove large deposits of hard material with diluted hydrochloric acid. Post completion of routines, operate system and inspect for leaks and proper cell amperage. (b) Inspect the tightness of belt and check leakage from gland of discharge pump. Repack the gland (if required). (c) Carry out following on Macerator pump:- (i) Check to ensure there are no leakages from the main seals. Renew drive end bearing and seals. (ii) Ensure impeller is free for rotation with no vibration. (iii) Ensure overload units operating correctly. (iv) Remove drain plugs provided at each end of the bracket of the electric motor and allow any accumulated moisture to drain away. Replace damaged plugs. (d) Clean and lubricate all plug cock valves. Lubricate valves in fully opened or fully closed position only. (e) Post repairs, STP to be proved for operation as per designed parameters. (f) Undertake effluent test from NABL accredited lab and check compliance to MARPOL norms. (g) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of marpol 73/78. (h) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate. Material and Service to be provided by contractor
Ventilation Blowers - Renew perished / damaged trunkings as fitted onboard including wire mesh / lourers, rubber beadings, gaskets, fasteners, ventilation flaps and earthing strips on upper deck and mess. Paint to be restored post repairs as per existing paint scheme. (Qty - 80 Mtr). Material and Service to be provided by contractor
Grease filters inside exhaust trunking in galleys to be renewed, Qty- 02. Material and Service to be provided by contractor
Clean dampers and fan impellers. Clean ventilation filters (Qty - 8) on airside with water jet, brush etc. Wash with detergent water. Rinse thoroughly, wipe, dry and refit. All Material and spares required for optimal functioning of the equipment as per the original design to be provided by the contractor. Material and Service to be provided by contractor
Life raft - (a) Renew Hydrostatic Release Gears by NABL accredited agency. (Qty 02) Quote for material. (b) Life raft stowing brackets (Qty 02) along with sliding ladder damaged / corroded. To be repaired / renewed and operational. Job involves renewal of life raft securing straps, slips and shackles. Quote for services and material.
Ladders - Carry out mechanical surface preparation of all ladders. Repairs to be under taken as per hull survey report of ladders with associated footsteps. Damaged area to be renewed. Paint to be restored as per existing paint scheme. Step Ladders – 11, Rung ladders – 20. Material and Service to be provided by contractor
Single arm boat davit, Mfd - Hemant Engg Pvt. Ltd: - (a) Overhauling of boat davit, gear box along with motor assembly. Insulation checks of the motor to be undertaken, if found below 01 MOhm, motor to be rewound. Specific attention is to be paid to motor terminal box to ensure weather proofing. During trials motor parameters are to recorded and same to be cleared by QC. Offer for trials to SS post completion. (b) Renew wire rope, spare gear and other associated lifting gears. (c) Carry out load testing with davit fully rigged up. After completion of load test. Examine the complete davit structure and associated lifting gears for flaws, distortion, defecation etc. Flaws must be examined, carry out repairs if necessary and retest. (d) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint post surface preperation. (e) System to be proved for designed operation and load trials to be offered. Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs. Material and Service to be provided by contractor
Overhauling Rescue Boat - Operationlised the rescue boat. Carry out following:- (a) Repair of hull structure and serviceability checks of boat to be carried out. Undertake serviceability checks and repairs as required of all boat fittings i.e. Rubbing strip, hand holds, grab handels, life lines, slings and slings points, transom,boat rope etc. Reflective tape to be renewed. Carry out load test of boat slings. Trials to be carried out alongwith weighing of boat with accessories post repairs. Test certificate to be provided. (b) Overhauling of motor boat engine including calibration of injectors. (c) Boat chocks to be repaired and cushion to be renewed. (d) Boat securing strap (gripes) to be renewed along with end fittings. Mat - polyester. (e) 02 in Nos oars and boat hookfor rescue boat damaged / broken. To be renewed. Boat trials to be conducted and proved for satisfactory performance. Material and Service to be provided by contractor
Overhauling - Sanitary System - Operationlised complete sanitary system. (a) Strip, clean and overhaul WC and urinal flushing valves, reducing valves and reducer (Qty 05). (b) Strip and clean sanitary system drain pipes. Re-galvanize where required (Length - 16 m). (c) Following accessories in the WC and bathroom to be renewed:- (a) Hand Shower - 04, (b) Wash basin tap - 04, (c) commode seat cover - 03, (d) Commode flush knobs - 03, (e) Wash Basin drain pipe - 06 (f) Shower curtains - 05. Material and Service to be provided by contractor
Overhauling- Domestic Fresh Water System - (a) Strip, clean and overhaul domestic fresh water system valves. Stop cock (qty 06), basin beep cock (pillar) (qty 04), sink beep cock (pillar) (qty 01). Material - Brass (chrome plated). (b) Strip and clean domestic fresh water system pipes. Re-galvanize where required (Length - 12 m). Material and Service to be provided by contractor
Water Tight Doors - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repair clips, hinges for looseness and wedge pieces for signs of wear and tear. Examine leather washers, toridal sealing rings and rubber sealing. Renew worn out parts and rubber beading. Carry out chalk test of all W/T doors. Paint to be restored as per existing paint scheme. Material and Service to be provided by contractor.
Repair 08 in nos NWT doors hinges and deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, hydraulic door closing mechanism and rubber beading and removal & fitment, repairs to coaming of door, structural coaming, frames). Material and Service to be provided by contractor
WT Hatch - Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Repairs and overhauling of WT Hatches. (Including surface preparation of hatch body and primer application, repairs to Coaming of hatches, Structural coaming, frames and straightening of bent hatches by removal & fitment, replacement of locks, auto locks, hinge pins, hinge assembly, rubber beading and removal & fitment).Carry out chalk test post repairs and renew worn out parts as necessary. (Qty - 07). Material and Service to be provided by contractor
Renewal of rubber beading of manholes. Material and Service to be provided by contractor
Renew 06 hydraulic doors closer for NWT doors as per sample.Material and Service to be provided by contractor
Scuttles- Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear/ damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardant cloth.. Material and Service to be provided by contractor.
Windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear/ damage. Renew worn out parts and rubber beading. Curtain to be provided made by fire retardant cloth. Material and Service to be provided by contractor
Guardrails and Stanchions - Renew guardrail stanchions and securing foundations. Renew all the earthing connection of guard rails / stanchions and ensure grounding . Paint to be restored as per paint scheme. Material and Service to be provided by contractor
Paint Scheme renewal Feed Water tank - Carry out surface preparation up to bare metal. Thereafter Paint to be restored as per existing paint scheme post repairs as per hull survey report. Material and Service to be provided by contractor
Paint Scheme renewal Water Ballast Tank and Fresh Water Tank - Carry out surface preparation to ST 3 standards. Thereafter Paint to be restored as per existing paint scheme post repairs as per hull survey report for the following tanks:- (a) Water ballast tank - 3118 Sqm (b) Fresh water Tank - 100 Sqm. Material and Service to be provided by contractor
Steel Renewal of A/W Structural plates along with Stiffeners of Deck and bulkheads and ship side (including degutting of lagging, perforated paneling, cabling associated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting)and thickness as specified below:Material grades: DMR 249A, DMR249B, D 40S, MS, B Quality steel.Standard : NES 155, NES 706. Steel plates supplied by yard and Welding Consumables to be supplied by contractor. Payment on actuals.
Fabrication and fitment of minor and major foundations (including degutting of lagging, perforated paneling, cabling assiciated equipment etc i.a.w NO 09/12 and testing of welds by DPT, followed by re-gutting).Standard : NES 155, NES 706(Steel supply by yard and weld consumables by Contractor)
Repair & refitment of panelling including regutting of lagging, clamps and fasteners. Mat-SS Material and Service to be provided by contractor
Fabrication & fitment of new panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor
Internal Portion of Super Structure - Damaged area to be prepared up to bare metal and painting to be under taken as per existing paint scheme post repair plating, structures and fittings of various compartments as per hull survey report. Material and Service to be provided by contractor
Fenders - Renewal of tyre fenders (Air craft old tyres)(Aircraft tyres with outer dia 90 cm) to be carried out. ( Note : Vendor to clear QC checks from user manager prior fitment) . Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders including associated degutting of lagging/panelling, equipment and regutting. Material and Service to be provided by contractor
Fenders - Renewal of eye pads associated with rubber fenders AS as per sample . ( Note : Vendor to clear QC checks from user manager prior fitment) . Job involves cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders.Degutting and regutting of lagging to be undertaken. Material and Service to be provided by contractor
Fenders -Renewal of 20 mm galvanised chain Note : Vendor to clear QC checks from user manager prior fitment . Material and Service to be provided by contractor
Fenders - Renewal of D shackle 20 mm . ( Note : Vendor to clear QC checks from user manager prior fitment) . Material and Service to be provided by contractor
Fender - (a) Renewal of Rubber fenders on all around of ferry craft found damage/perished. Fenders to renew. (b) Securing fasteners for fenders found perished/corroded. To be manufactured as per sample and fitted back. New fenders to be provided by firm. Rubber Mat - EBDM/ NBR/ Natural Thickness - 8" x 6". Material and Service to be provided by contractor
Life Saving Appliance - Renewal of First aid kit stowing wooden locker. . Quote for Service and Material.
Life Saving Appliance - Renewal of lifebuoy securing brackets to be renewed at various locations. Mat - MS. Material and Service to be provided by contractor
Renewal of follwoing Life Saving Appliance as per sample - (a) Lifebuoy with self igniting light and smoke signal (MOB marker) quick release type to be renewed on bridge deck (qty 02), (b) Lifebuoy with life line (30m long) to be renewed on 01 deck (qty 02), (c) Ordinary lifebuoy damaged. To be renewed on main deck (qty 02), (d) Lifebuoy with self igniting light and 30m buoyant life line to be renewed on 01 deck (qty 02). Material and Service to be provided by contractor
Renewal of 9 Mtr aluminum gangway. Mat - Al, length - 09m. Material and Service to be provided by contractor
Renewal of Name Board Ships name box along with lighting arrangement defective. To be renewedas per sample. Mat - MS (qty 01). Material and Service to be provided by Contractor
Renewal of Ships name board on Port and Stbd side to be renewed. Mat - Wood (qty 02) with name engraved by steel electroplating. Material and Service to be provided by Contractor
Renewal of Fire hose box and securing brackets. Job involves welding, cutting and renewal of securing brackets including associated degutting of lagging/panelling equipment and regutting. Material and Service to be provided by contractor
Manufacturing of 01 towing bridle for tow forward as per drawing. Mat - SWR. Material and Service to be provided by contractor
Renewal of AC drain pipe (Stbd). Mat - GI. Material and Service to be provided by contractor
Renewal of Life buoy manual launching arrangement (Mat - Wooden) . Material and Service to be provided by contractor
Following Awning/ Canvas covers to be renewed as per sample: (i) Foxle Awning – 02 (ii) Qtr deck Awning – 02 (iii) Windlass cover - 02 (iv) Capstan cover – 02 (v) Search light cover – 02 (vi) Compass cover - 02. Material and Service to be provided by contractor
Water ballast tanks sounding points struck in close position. Repair of all sounding points. Material and Service to be provided by contractor
Port and Stbd Main engine, Make-M/s Cummins (Model- KTA-19-M3), (Running hour- Port: 821, Stbd: 849):- Carry out following routines/works on both Main engines:- (a) Crankshaft end clearance to be checked, rectify defect if any. (b) Tighten engine mounts. (c) Carry out Safety devices checks, rectify defects if any. (d) Renew marine gear oil. (e) Remove, dismantle and chemical cleaning of marine gear oil cooler and fresh water heat exchanger. (f) Carry out serviceability checks of fresh water pump. (g) Replace all damaged hoses and belts. (h) Adjust valve and Injectors. (j) Clean and calibrate Injectors and FIP. (k) Renew air cleaner element. (l) Adjust belt tension. (m) Renew By-pass filter and coolant filter. (n) Change crankcase breather. (p) Renew Fuel filter and Fuel/Water separator. (q) Renew lub oil and lub oil filter. (r) Renew all zinc plugs in the system. (s) Carry out SDC checks of both Main engine local control panel and wheel house control panel, rectify defects if any. (t) Carry out SDC checks of both Main engines, rectify defects if any. Post completion of routines, start the engine and check all gauges, replace if required, check for any oil/water leakage, exhaust leakage, stop the engine and recheck engine oil level, top up if require. After necessary inspection, restart the engine. Run at idle speed for 15 minutes. Load Trials to be undertaken and system performance to be proved for satisfactory performance. Quote for Service.
Port and Stbd Main Engine (Cummins: KTA-19-M3) : - Resistor Corrosion, 5 ltrs
Separator, Fuel water
Element Lub oil filter
Element Oil By-pass filter
Inhibitor Corrosion, 5 Litres
Belt, Ribbed
Cleaner Sir
Seal O-ring
Hose Flexible
Hose Flexible
Gasket, Rocker lever
Valve, Check
Valve, Check
Cap, Filler
Indicator, Restriction
Seal O-ring
Hose Flexible
Hose Plain
Hose Plain
Clamp Hose
Clamp Hose
Hose Flexible
Stbd Main engine getting low lub oil pressure trip during astern movement. Suspect control system malfunctioning. Undertake DI/DR. Quote for Service and Material.
Port and Stbd Diesel Alternator, Make-M/s Cummins, Model-(6CTA-8.3DM) (Running hour- Port: 2536, Stbd: 1526):- Carry out following routines/ works: - (a) Remove Injectors. Clean, inspect, repair & calibrate with new spares. (b) Remove heat exchangers, Clean & pressure test. (c) Remove turbocharger. Clean, inspect & repair with new repair kit (check turbocharger end play and radial clearance). (d) Tighten nut & cap screw of air inlet and exhaust system. (e) Replace vibration damper and belts for accessories. (f) Replace lub oil and fuel filter. (g) Renew Engine oil. (h) Carry out tappet settings. (j) Check clearance of Crankshaft end play. (k) Check freeness of turbocharger (Check turbocharger end play and radial clearance). (l) Flush cooling system. Run engine to bring it to operating temperature. Stop the engine; re-flush cooling system with potable water 2-3 times. Refill cooling system with coolant. Run the engine for three to five minutes. (m) Abnormal noise observed from Port DA idler pulley. Pulley bearing to be changed. (n) Carry out calibration of AVR, after calibration of AVR; undertake the voltage control test and paralleling trials. (p) Carry out calibration of over voltage protection unit (OVPU), reverse power relay and over speed trip. (q) Carry out SDC checks of both DA local control panel and wheel house display panel, rectify defects if any. (r) Renew all sacrificial anodes in the sea water system. (s) Post completion of routines, start the engine and check all gauges, replace if required, check for any oil/water leakage, exhaust leakage, stop the engine and recheck engine oil level, top up if require. After necessary inspection, restart the engine. Run at idle speed for 15 minutes. Carry out safety device checks. Post completion of routine and load trails, calibrate/renew defective safety devices. Trials to be undertaken and system performance to be proved for satisfactory performance. Quote for Service.
Main Diesel Alternator, Model: 6 CTA 8.3 D/M (mandatory spares) :- Element lub oil filter
Element, Air cleaner
Element, Air cleaner
Filter, Fuel
Filter, Coolant
Inhibitor, corrosion 10 litres
Seal O-ring
Hose, Plain
Clamp, T Bolt
Clamp, T Bolt
Hose, Elbow
Hose, Plain
Clamp Hose
Hose Plain
Cap filler
Seal rectangular ring
Seal, Rocker lever cover
Belt, V ribbed
Hose, Flexible
Hose, Flexible
Adaptor, Fuel connector
Seal, Banjo connector
Screw, RKR lever adjusting
Nut, Heavy hexagon
Gasket, Breather
Isolator, Noise
Clamp, V band
Aftercooler
Damper, Vibration
Support fan
Injector
Gasket, Hydraulic pump
Pump, Sea water
Pump, Water
Seal, O-ring
Tensioner Belt
Turbocharger
Control, Governor
Sensor, Temperature
Sensor, Pressure
Pick up, Magnetic
Transciever
Air compressor (Make-Elgi, Model- LG02):- Carry out following routine/works on both air compressors: - (a) Observe noise and vibration, rectify defects if any abnormality. (b) Check fasteners, to be renewed if defective. (c) Air leakage observed in system, to be rectified. (d) Calibrate Pressure relief valve. (e) Change inlet air filter. (f) Change oil and oil filter. (g) Calibrate Non return valve. (h) Remove and clean cooler. (j) Clean air filter element. (k) Carry out overhauling of Starting control panels. Trials to be undertaken and system performance to be proved for satisfactory performance. Quote for Service.
Air Compressor (Make - Elgi, Model - LG 02) Complete Kit for Overhaul
Fuel oil Purifier (Make-Alfa Laval, Model-MMB304+LSA):- Carry out following works/routine :- (a) Clean and inspect threads of inlet pipes and oil pairing disc, renew if defective. (b) Renew oil in gear housing, check the teeth of worm wheel and worm for wear, renew if damaged. (c) Inlet device: (i) Check flow indicator, clean sight glass. (ii) Check reducing valve cone for scratches and play. (iii) Check the non-return valve cone for scratches and play. (d) Dismantle and examine separator and bowl assembly thoroughly, clean all components and check: (i) Disc stack pressure (ii) Corrosion, Erosion and cracks (iii) Galling of guide surface. (e) Carry out overhauling of Starting control panels.Trials to be undertaken and system performance to be proved for satisfactory performance. Quote for Service.
Fuel oil Purifier (Make-Alfa Laval, Model-MMB304+LSA):- Major Service kit
Intermediate Service kit
Ball bearing 2306M
Ball bearing 6307 M/C3
Steering gear (Make- M/s Geeta Engineering, Mumbai. Type - Electro hydraulic system):- Carry out following routine/works: - (a) Renew filter cartridge of hydraulic oil system. (b) Clean the steering pump motor starter, replace defective components. (c) Clean the helm indicator unit, steering operating switch indicating rudder angle feedback unit. (d) Check and test alarm indicating unit for correct operation, replace defective components. (e) Renew hydraulic hoses in the system. (f) Calibrate all pressure and temperature gauges. (g) Check coupling between pump and motor, change if necessary. (h) Carry out checks of Steering gear control system from wheel house and local control panel and prove the system for correct operation. Quote for Service.
Steering Gear Make - M/s Geeta Engineering :- Hydraulic flexible hose
Piston seal
Filter cartridge
Limit switch
Rudder angel indicator
LED 24V DC
CO2 fire fighting system (Make - M/s Noske Kaesar):- Carry out following routine/works :- (a) Renew all flexible hoses. Qty-10. (b) Overhaul non-return valves and safety stop valves. (c) Remove and inspect cylinder operating heads, test for correct functioning. (d) Renew bursting discs fitted in system. (e) Carry out weight test of all CO2 cylinders, refill gas if required. (f) CO2 control panels malfunctioning, to be repaired. (g) CO2 fire fighting system bottles to be pressure tested at 1.5 times of working pressure. Qty-07. System to be proved for satisfactory performance. Quote for Service and Material.
OWS (Make-Victor Marine Model-CS 500):- Carry out following routines / work on Oily water separator: - (a) Undertake full servicing of the equipment including pump overhaul, (b) Replace the first stage coalescer pack (c) Renew the advanced Granular media (d) Restore interior coating. (e) Recalibration of 15 ppm monior to be carried out. Prove system for satisfactory operation. (f) Carry out overhauling of Starting control panels. Quote for Service
Oily water separator (Make - Victor Marine, Model - CS1000) :- Coalescer (set)
End plate (set)
Advance granular media(set)
Wadding (filter mesh)
Gasket set (inc hatch gasket)
Feed pump stator
Gear box assembly (Make-ZF, Model-ZFW650):- Carry out following routines on Gear box assembly, (a) Chemical cleaning and pressure testing of lub oil coolers to be carried out, Test pressure - 6 kg/cm2. (b) Turn oil filter handle. (c) Drain water separator of compressed air system. (d) Re-tighten all bolt connections accessible from outside. (e) Shift position to be adjusted. (f) Renew lub oil and clean oil filter. (g) Carry out overhauling of oil pump. (h) Carry out SDC checks of both Gear box assembly, rectify defects if any. (j) Carry out overhauling of Starting control panels. System to be proved for satisfactory performance. Quote for Service.
Gear box assembly (Make-ZF, Model-ZFW650):- Sealing ring (0634801275)
Lub oil filter
Clean oil filter
Gasket (3080301033)
O-ring (0634306249)
O-ring (0634313618)
Gasket (3080307048)
Gasket (3080306042)
Gasket (3082307291)
Gasket (3081308098)
Gasket (3081308064)
Gasket (3081308065)
O-ring (0634303618)
Pressure Switch (LM-1B-195F/HR)
Pressure Sensor (360081038003C)
Temperature Sensor (323805001004N)
Main engine Sea chest valve to be overhauled, Type- Gate valve, Mat- Gun metal, Dia- 150mm. Quote for Service and Material.
DA Sea chest valve to be overhauled, Type- Butter fly valve, Mat- Gun metal, Dia- 150mm. Quote for Service and Material.
Main Shafting: - Carry out following routine/works :- (a) Dismantle complete deep sea seal and examine parts. Refit new face and seat. (b) Examine shaft bracket bushes clearance. Replaced defective bushes. (c) Examine the lining between the shaft bearings for any damage and repair if defective. (d) Examine the propeller for any damage, repair as necessary. (e) Clean and polish propeller. (f) Renew Cathodic protection/zinc protection cap. (g) Inspect bulkhead seal, replaced if damaged. (h) Undertake sample inspection of Plummer bearings on each shaft line for scoring/corrosion. In case any abnormality is observed, carry out inspection of balance Plummer bearings on the same shaft line. (j) Change Plummer block oil. Quote for Service.
Shafting & Accessories (Geeta Engineering) :- O-ring for propeller cone
Sealing ring for seal
Cathodic protection cap
Counter ring for seal
Indication lamp assembly
Fuse link
Contactor
Relay
Rudder angle indicator
Micro switch
Return line filter
Suction strainer
Bearing for motor
Hydraulic flexible hose
Emergency DA (Make-Kirloskar India Ltd, Modle-6R1080T):- Carry out following routines:- (a) Remove intake manifold. Clean & pressure test, (b) Remove turbocharger. Clean, inspect & repair with new spares, (c) Remove injectors and fuel injection pump. Clean, inspect, calibrate & repair with new spare parts, (d) Replace all zinc plugs, (e) Check /tighten all foundation bolts, (f) Clean all dismantled parts and cylinder block top position. (g)Dilution observed in DA lub oil system, rectify defect. (h) Carry out overhauling of Starting control panels. Undertake load trials post completion of DI/DR. Quote for Service.
Emergency DA (Make-Kirloskar India Ltd, Model-6R1080T) :- Lub oil
Lub oil filter
Fuel filter
Fuel filter
Injector
K-coolant
Air filter element
V belt(XPA 1250)
Water pump belt
Following work on Emergency DA to be carried out: - (a) Display panel defective, to be repaired. (b) DA starter spring broken, spring to be replaced. Quote for Service and Material
Pressure gauge lines of various systems perished. System line to be replaced. Dia-5 mm. Length-100 Mtr, Mat-Copper. Quote for Service and Material.
Fuel Stripping pump (Make- Roysons Engineering, Model-B-1453-14) hard to turn. Pump to be overhauled. Renew mechanical seal wear ring, bearing and all consumable spares. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service and Material.
Valves: - Removal, overhauling, pressure testing and fitment of 65 mm SDNR valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 65 mm SD valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 80 mm SDR valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 125 mm Gate valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 65 mm Butterfly valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 100 mm Butterfly valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 100 mm Gate valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 100 mm SDNR valves. Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 50 mm SDNR valves(DA sea water suction). Quote for Service and Material..
Valves: - Removal, overhauling, pressure testing and fitment of 15 mm Ball valves(Feed water sampling). Quote for Service and Material..
Bilge/ ballast pump, (Make-SPX flow technology, Model-CH-50-1600-B3M2TL) - Leakage observed from Bilge/ Ballast pump mechanical seal. Renew mechanical seal wear ring, bearing and all consumables. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service.
Bilge/ Ballast pump Make-SPX flow technology, Model-CH-50-250-B4M2TL : - Impeller
Wearing ring
Mechanical seal
Bearing set for pump
Bearing set for motor
Gasket set
Key for impeller
Oil seal
Cap nut
Shaft sleeve
Entire chequred plates of engine room and pump room to be chemically cleaned and fitted back. All damaged plates to be repaired/ renewed. Quote for Service and Material.
Main Sea water suction strainer to be manufacture as per sample. Paint with epoxy coating, Mat –SS. Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 100 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 80 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 65 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanized Steel – 50 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Copper – 40 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Copper – 32 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 125 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 100 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 80 mm). Quote for Service and Material..
System Pipelines: - Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure (kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Cu Ni – 65 mm). Quote for Service and Material..
Carry out calibration of the following pressure gauges: - (a) Range – 0 to 10 kg/cm2 (b) Range – 0 to 60 kg/cm2. Qty- 05 each. Quote for Service and Material..
Overhauling of Fire hydrants to be carried out. Brass coupling to be renewed. Quote for Service and Material..
Feed water transfer hoses damaged, to be renewed as per sample. Length- 12 mtr. Quote for Service and Material.
Feed water transfer hoses damaged, to be renewed as per sample. Length- 18 mtr. Quote for Service and Material.
Sea water bellows of various systems perished. Bellows to be renewed as per sample:- (i) Dia-100 mm, Qty-05 (ii) Dia-80 mm, Qty-05. Quote for Service and Material..
Abnormal sound observed from Fuel transfer pump (Make-Roysons Engineering, Model-B-1453-14). Pump to be overhauled. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service.
Fuel transfer pump (Make-Roysons Engineering, Model-B-1453-14) :- Bearing set for pump
Bearing set for motor
Mechanical seal
Set of keys
Leakage observed from Cargo feed water pump mechanical seal. Pump to be overhauled alongwith renewal of mechanical seal wear ring, bearing and all consumables. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service.
Cargo Feed water pump, Make-SPX flow technology, Model-CH-65-250-B3M2TL :-Impeller
Wearing ring
Mechanical seal
Bearing set for pump
Bearing set for motor
Gasket set
Key for impeller
Oil seal
Cap nut
Shaft sleeve
Leakage observed from Cargo fresh water pump mechanical seal. Pump to be overhauled alongwith renewal of mechanical seal wear ring, bearing and all consumables. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service and Material.
Abnormal sound observed from G/S fire pump. Pump to be overhauled. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service.
G/S Fire pump Make-SPX flow technology, Model-CH-50-250-B4M2TL : - Impeller
Wearing ring
Mechanical seal
Bearing set for pump
Bearing set for motor
Gasket set
Key for impeller
Oil seal
Cap nut
Shaft sleeve
Abnormal sound observed from Dirty oil pump. Pump to be overhauled. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service and Material..
Undertake Overhauling of Hand pump, replace all damage components including seal of hand pump/ wheel. Quote for Service and Material..
Bilge Pump (Make-SPX flow technology, Model- KGEC 12 B-5 B4) - Abnormal sound observed from Bilge pump. Pump to be overhauled. Carry out alignment checks and trail to be offered to SS. Carry out overhauling of Starting control panels. Quote for Service and Material..
Renewal of hot lagging for DA and Main engine exhaust trunking. Lagging to be provided. Thickness- 25 mm, Mat-MWMB. Quote for Service and Material.
Both Main engine(Qty-08) and DA(Qty-06) sea water system rubber hoses of various dimensions perished. Hoses to be renewed. Quote for Service and Material..
Carry out overhauling of following motors and starters:- (a) Cargo feed water pump motor -37.3 KW (b) General service / fire pump motor - 22.4 KW (c) Fuel oil transfer pump motor- 1.2 KW (d) E/R supply and exhaust fan motor - 3.7 KW, Qty- 02 (e) Accomodation blower motor- 0.7 KW, Qty- 01 (f) Pump room supply and exhaust fan motor- 2.1 KW, Qty- 02 (g) Galley exhaust blower motor- 0.37 KW, Qty- 01 (h) Bathroom exhaust blower motor- 0.37 KW, Qty- 01 Quote for Service and Material.
Main Switch board: Following works to be carried out: - (a) Undertake calibration of instrument panel / meters fitted on MSB (Qty 17), (b) MSB Breaker (415V, 150A) found defective. Breaker to be replaced. (c ) EOM with breaker of both DA malfunctioning, to be replaced, Make- Schenieder, Model- SineDN3400,400A. Quote for Service.
SWBD supply breaker 415V,150A
Switch board and Starters:- Aux. contactor
Aux. contactor
Aux. contactor
Aux. contactor
Electronic timer
4NC contact
2NO+2NC contact
Fuse terminal block
Aux. contactor
NC contact
Rotary switch
2NO contact
Contactor
Triple pole rotary switch
Stud type terminal
Fuse link
Resistor 50 ohm
Fuse base
Potentiometer
Shunt
Double pole toggle switch
Double pole switch
Fuse holder
Fuse link
Relay
Shunt
Double pole rocker switch
PA system malfunctioning, suspected amplifier unit defective. System to be repaired and proved for satisfactory performance. Quote for Service and Material
Echo sounder-Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material
GPS - Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material.
Air Whistle not working. To be operationalised. Quote for Service and Material
Magnetic compass- Undertake calibration of the compass unit and prove system as per designed performance. Quote for Service.
(a) Fuse 3.15A
(b) Lamp 24VDC 5W
SPT fitted onboard at various locations found defective. To be operationalised. Quote for Service and Material
Display unit of radar found defective. To be Operationalised. Quote for Service and Material
Kit of small fuses
Quarter deck and foxle speakers (10W) not working. To be renewed. Quote for Service and Material
RPM indicator damaged. RPM indicator to be replaced. Quote for Serviceand Material
Flood lights (200W, Qty.-05) and Search light (1000W, Qty.-01) not working. To be replaced. Job involves renewal of securing bracket and fitment. Quote for Service.
Search Light 1000W
Flood Light 200W
Engine room telephone alarm found defective. To be operationalised. Quote for Service and Material
Trans Rectifier Unit to be upgraded to latest version. Quote for Service and Material
Following work on Window wiper to be carried out: - (a) 05 in nos. Solenoid not working, to be replaced. (b) 03 in no. Motor not getting start, to be repaired. (c) 02 in no. rotary switch defective, to be replaced. (d) Rubber beading of 13 in no. Wiper damaged. Window wiper to be renewed. Quote for Service and Material
Drive belt for 670 mm stroke
Drive belt for 860 mm stroke
Proxy switch
Rotary switch
Deck light (60W) defective at various location to be replaced. Quote for Service and Material
Fire detection alarm system- Undertake calibration of the system and prove system as per designed performance. Quote for Service.
Smoke detectors optical type-System sensor
Flood sensor
Electronic hooter-24V DC
Tank content gauges control panel (Nivo system) (Qty 02) observed to be defective. Functional checks of all gauges to be carried out. Defective components and sensors to be replaced. Tank level calibration to be undertaken. Serviceability checks and calibration of display module to be undertaken. Quote for Service.
Tank display unit
Top mounting sensor with cable length 6 m
Side mounting sensor with cable length 3m
Fuses
Sensor gasket set
Top mounting sensor with cable length 6 m
Portable battery charger not working. To be operationalised. Quote for Service and Material.
Wall mounted fans (230V) defective. To be replaced. Quote for Service.
Wall mounted fans (230V) defective. To be replaced. Quote for Service.
Shore supply breaker (415V, 150A) found defective. To be replaced. Quote for Service and Material.
Emergency light (24VDC, 40W) at various locations not working, to be renewed. Quote for Service
AEL bulbs 24V DC 40W
Tube light (25W) fitted in engine room defective. All lights to be replaced with LED (25W) tube light with IP rating. Job involves renewal of securing brackets. Quote for Service and Material
Tube light (22W) fitted onboard at various locations to be replaced with LED (25W) tube lights with IP rating. Quote for Service and Material
Starter (415V, 3PH 50Hz) of submersible pump found defective. To be operationalised. Quote for Service and Material
Master cabin, wheel house and crew cabin centre split AC (2T) not working. To be renewed. Quote for Service and Material
Following domestic equipment to be renewed: - (a) Hot water boiler (Make- Blue star, 20 Ltrs) (b) Microwave oven (Make- Samsung, 23 Ltrs) (c) RO Purifier (Make- Kent. Model no-Kent grand, 20 Ltrs) (d) Deep freezer (Make- Blue star, 300 Ltrs) (e) Refrigerator (210 Ltrs) (f) Water cooler (Make- Blue star. Model No-SDLX480, capacity - 40 Ltrs). Quote for Material
Following batteries to be replaced(a) 12V, 150 AH
EPIRB to be replaced. Make- Pathfinder, Mode-RLB 37, Qty- 01. Quote for Material.
Search & Rescue Transponder (Model-SART-3, Make-Pathfinder, ACR Electronics) to be replaced. Qty- 02. Quote for Material.
Limit switch
Shore supply Cable(50 sqmm, 3 core)
GOA SHIPYARD LIMITED
Mercury Ship Repairs Pvt Ltd
ULTRA MARINE
POONAM ENTERPRISES
M/s Dynatron services Private Limited
SOlas Marine Services Pvt. Ltd.
PACIFIC SHIPPING SERVICES
SEABLUE SHIPYARD LTD
CARE MARINE AND ALLIED SERVICES
Krasny Defence Technologies Pvt. Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid